I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
Work information in conveyor line
Work information refers to the details and data related to the tasks performed on a conveyor line.
It includes information about the products being processed, the production rates, quality control measures, and any issues or incidents that occur.
Examples of work information in a conveyor line can include the number of units produced per hour, the rejection rate of defective products, and...
+2pass and 1 year course in iti tractor mechanical
Top trending discussions
Overall equipment effectiveness (OEE) measures the efficiency of production equipment.
OEE takes into account three factors: availability, performance, and quality.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed at which the equipment operates compared to its maximum speed.
Quality measures the percentage of products produced that meet quality standard...
posted on 23 Oct 2024
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
EMF stands for electromotive force, which is the voltage generated by a source such as a battery. Volt is the unit of measurement for voltage, while watt is the unit of measurement for power.
EMF is the voltage generated by a source of electrical energy, such as a battery
Volt is the unit of measurement for voltage, representing the potential difference between two points in a circuit
Watt is the unit of measurement for p...
Hydraulic machines use fluid power to perform work, while hydraulic machines are machines that utilize hydraulic power.
Hydraulic machines use fluid power to generate force and motion, such as hydraulic presses and hydraulic cylinders.
Hydraulic machines are machines that utilize hydraulic power, such as excavators and forklifts.
Hydraulic machines are often used in heavy-duty industrial applications, while hydraulic mach...
A machine is a device that uses energy to perform a specific task or function.
A machine is typically made up of various components that work together to achieve a desired outcome
Machines can range from simple tools like a hammer to complex systems like a computer
Examples of machines include cars, washing machines, and robots
2 stroke engines have a power cycle with two strokes (up and down) of the piston in one revolution, while 4 stroke engines have four strokes (intake, compression, power, exhaust) in two revolutions.
2 stroke engines have a simpler design with fewer moving parts compared to 4 stroke engines
2 stroke engines require a mixture of oil and fuel for lubrication, while 4 stroke engines have a separate oil reservoir for lubricat...
The principle of least count is the smallest measurement that can be made by a measuring instrument.
It is the smallest increment that can be measured by the instrument.
It is determined by the precision of the instrument.
For example, a ruler with markings at every millimeter has a least count of 1 mm.
In a digital caliper with a resolution of 0.01 mm, the least count is 0.01 mm.
Vernier caliper is a measuring tool used to take precise measurements, with a vernier scale providing additional accuracy.
Vernier caliper is a tool used for measuring dimensions accurately.
It consists of a main scale and a vernier scale for more precise readings.
The vernier scale allows for measurements to be taken to a higher degree of accuracy than just the main scale alone.
Commonly used in engineering, manufacturing...
posted on 14 Dec 2023
I applied via Approached by Company and was interviewed in Nov 2023. There were 2 interview rounds.
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workspace.
Set in Order focuses on arranging tools and materials in a logical and efficient manner.
Shine involves cleaning and maintaining the workspace.
Standardize establishes guidelines and procedures for main...
posted on 19 May 2022
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
posted on 19 Apr 2023
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
I was interviewed in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the
posted on 3 Dec 2024
What is the group decisions
I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Customer satisfaction.quality, machining,production over all difficulty process planning..
Thanks team.
Interview experience
based on 3 reviews
Rating in categories
Assistant Manager
123
salaries
| ₹5 L/yr - ₹12.8 L/yr |
Junior Manager
111
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Deputy Manager
70
salaries
| ₹9.6 L/yr - ₹16 L/yr |
Engineer
34
salaries
| ₹3 L/yr - ₹8.6 L/yr |
Manager
33
salaries
| ₹12.5 L/yr - ₹20 L/yr |
Ashok Leyland
Tata Motors
Mahindra & Mahindra
Eicher Motors