Filter interviews by
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I appeared for an interview in Feb 2025, where I was asked the following questions.
Metal is a solid material characterized by high electrical and thermal conductivity, malleability, and ductility.
Metals are typically shiny and have a metallic luster.
They are good conductors of heat and electricity (e.g., copper, aluminum).
Metals can be shaped and molded (e.g., iron can be forged into tools).
They are usually dense and have high melting points (e.g., tungsten).
Common metals include gold, silver, iron,
Production planning involves strategizing resources, scheduling, and workflow to optimize manufacturing efficiency.
Define production goals based on demand forecasts and market analysis.
Assess available resources, including labor, materials, and machinery.
Create a detailed production schedule that outlines timelines and milestones.
Implement inventory management techniques to ensure materials are available when needed.
Ut...
5S methodology enhances workplace organization, efficiency, and safety through systematic sorting and standardization.
Sort (Seiri): Remove unnecessary items from the workspace. For example, clearing out old tools that are no longer used.
Set in Order (Seiton): Organize tools and materials for easy access. For instance, labeling storage areas for quick identification.
Shine (Seiso): Regular cleaning of the workspace to ma...
Rejection control ensures defective products are identified and removed to maintain quality standards in manufacturing.
Involves systematic inspection of products to identify defects.
Utilizes statistical process control (SPC) to monitor production quality.
Examples include rejecting items that do not meet specifications, such as a faulty circuit board in electronics.
Involves training staff to recognize and report defects...
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
The manufacturing process involves several steps from raw material acquisition to final product assembly.
1. Raw material acquisition - sourcing materials needed for production
2. Design and planning - creating a blueprint for the product
3. Production - manufacturing the product using machinery and labor
4. Quality control - ensuring the product meets standards
5. Packaging and shipping - preparing the product for distribu...
5s is a workplace organization method that focuses on creating a clean and organized work environment to improve efficiency and safety.
Sort - Separate needed tools, materials, and instructions from unneeded items.
Set in order - Arrange items in a logical order for easy access and use.
Shine - Clean and inspect work areas regularly to maintain cleanliness and identify issues.
Standardize - Establish standards and procedur...
SKH Metals interview questions for popular designations
General sequence, verbal reasoning, numerical reasoning asked
Alloy steel is a type of steel that contains other elements besides iron and carbon, while mild steel is a type of carbon steel with low carbon content.
Alloy steel has higher strength, hardness, and wear resistance compared to mild steel.
Alloy steel is more expensive than mild steel due to the additional alloying elements.
Examples of alloy steel include stainless steel, tool steel, and high-strength low-alloy steel.
Mil...
Material structure refers to the arrangement of atoms, molecules, or ions in a material.
Material structure determines the properties and behavior of a material.
It can be studied using techniques like X-ray diffraction, electron microscopy, and spectroscopy.
Examples of material structures include crystalline, amorphous, and composite structures.
posted on 19 Mar 2024
I applied via Campus Placement
Mechanical engineering technical besis question
Effective inventory management practices include accurate forecasting, regular audits, efficient storage, and clear communication with suppliers.
Implement accurate demand forecasting to prevent overstocking or stockouts.
Conduct regular inventory audits to identify discrepancies and prevent shrinkage.
Optimize storage space to maximize efficiency and minimize handling costs.
Maintain clear communication with suppliers to ...
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Costing method refers to the process of determining the expenses associated with a particular product or service.
Costing methods include job costing, process costing, activity-based costing, and absorption costing.
Job costing is used for unique products or services, while process costing is used for standardized products.
Activity-based costing assigns costs based on the activities that drive them.
Absorption costing inc...
Top trending discussions
The duration of SKH Metals interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 65 interviews
Interview experience
based on 659 reviews
Rating in categories
Assistant Manager
170
salaries
| ₹5.1 L/yr - ₹12.1 L/yr |
Senior Engineer
123
salaries
| ₹4 L/yr - ₹7.8 L/yr |
Junior Engineer
111
salaries
| ₹1.5 L/yr - ₹4.4 L/yr |
Deputy Manager
86
salaries
| ₹6 L/yr - ₹16.2 L/yr |
Senior Executive
77
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Delphi TVS
Motherson Automotive Technologies and Engineering
Belrise Industries
Krishna Maruti