Filter interviews by
How to tackle your supplier or treat your suppliers if suppliers payment already delayed and he is denying to providing further material.
We are currently using grade A raw materials in our company. The difference in grades lies in the quality, purity, and cost of the materials.
Grade A raw materials are of the highest quality, with superior purity and consistency.
Grade B raw materials may have slightly lower quality and purity compared to Grade A.
Grade C raw materials are typically the lowest quality and may have inconsistencies in purity and composition
Costing is finalised through a detailed process involving analysis of expenses, pricing strategies, and market trends.
Analyze all expenses incurred in the production process, including raw materials, labor, and overhead costs.
Consider pricing strategies such as cost-plus pricing, value-based pricing, or competitive pricing.
Evaluate market trends and competitor pricing to ensure competitiveness and profitability.
Finaliz...
Overhead in costing is calculated by dividing total indirect costs by a relevant cost driver.
Identify all indirect costs incurred in the production process.
Determine a relevant cost driver, such as machine hours or labor hours.
Divide the total indirect costs by the cost driver to allocate overhead.
For example, if total indirect costs are $10,000 and the cost driver is machine hours at 1,000 hours, the overhead rate wou
Tonnage calculation for operations involves analyzing factors like material type, thickness, cutting speed, and machine capacity.
Analyze the material type being processed
Consider the thickness of the material
Take into account the cutting speed of the machine
Ensure the tonnage does not exceed the machine's capacity
Use formulas or charts provided by the machine manufacturer for guidance
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
The manufacturing process involves several steps from raw material acquisition to final product assembly.
1. Raw material acquisition - sourcing materials needed for production
2. Design and planning - creating a blueprint for the product
3. Production - manufacturing the product using machinery and labor
4. Quality control - ensuring the product meets standards
5. Packaging and shipping - preparing the product for distribu...
5s is a workplace organization method that focuses on creating a clean and organized work environment to improve efficiency and safety.
Sort - Separate needed tools, materials, and instructions from unneeded items.
Set in order - Arrange items in a logical order for easy access and use.
Shine - Clean and inspect work areas regularly to maintain cleanliness and identify issues.
Standardize - Establish standards and procedur...
General sequence, verbal reasoning, numerical reasoning asked
SKH Metals interview questions for popular designations
Get interview-ready with Top SKH Metals Interview Questions
Alloy steel is a type of steel that contains other elements besides iron and carbon, while mild steel is a type of carbon steel with low carbon content.
Alloy steel has higher strength, hardness, and wear resistance compared to mild steel.
Alloy steel is more expensive than mild steel due to the additional alloying elements.
Examples of alloy steel include stainless steel, tool steel, and high-strength low-alloy steel.
Mil...
Material structure refers to the arrangement of atoms, molecules, or ions in a material.
Material structure determines the properties and behavior of a material.
It can be studied using techniques like X-ray diffraction, electron microscopy, and spectroscopy.
Examples of material structures include crystalline, amorphous, and composite structures.
posted on 19 Mar 2024
I applied via Campus Placement
Mechanical engineering technical besis question
Effective inventory management practices include accurate forecasting, regular audits, efficient storage, and clear communication with suppliers.
Implement accurate demand forecasting to prevent overstocking or stockouts.
Conduct regular inventory audits to identify discrepancies and prevent shrinkage.
Optimize storage space to maximize efficiency and minimize handling costs.
Maintain clear communication with suppliers to ...
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Costing method refers to the process of determining the expenses associated with a particular product or service.
Costing methods include job costing, process costing, activity-based costing, and absorption costing.
Job costing is used for unique products or services, while process costing is used for standardized products.
Activity-based costing assigns costs based on the activities that drive them.
Absorption costing inc...
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
The engine is a machine that converts fuel into mechanical energy to power vehicles, machines, or equipment.
Converts fuel into mechanical energy
Powers vehicles, machines, or equipment
Can be internal combustion engine or electric motor
A wire bonding machine is a tool used in semiconductor manufacturing to connect wires to semiconductor devices.
Wire bonding machines use heat, pressure, and ultrasonic energy to bond wires to semiconductor devices.
There are different types of wire bonding machines, such as ball bonding and wedge bonding machines.
Wire bonding is a crucial step in the production of integrated circuits and other semiconductor devices.
The duration of SKH Metals interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 63 interviews
Interview experience
based on 647 reviews
Rating in categories
Assistant Manager
165
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
121
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited