Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding Hydro-test, NDT techniques, welding inspection

Interview Preparation Tips

Interview preparation tips for other job seekers - Present yourself politely.Give reply for the questions with confidence.

Interview questions from similar companies

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to cad and design

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be flexible in ur approach.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.

Interview Questionnaire 

1 Question

  • Q1. Future in QA/QC Department
  • Ans. 

    The future of QA/QC department is bright with increasing demand for quality products and services.

    • Adoption of new technologies like AI and automation

    • Increased focus on data analysis and continuous improvement

    • Integration of QA/QC into overall business strategy

    • Growing importance of regulatory compliance

    • Need for skilled and certified QA/QC professionals

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Why you joined Keller?
  • Q2. Are you comfortable with any location?
  • Q3. Tell me work details?
  • Q4. Are you preparing a method statement?
  • Ans. 

    Yes, I am preparing a method statement for the project.

    • Yes, I am currently working on preparing a method statement for the project.

    • I am in the process of outlining the steps and procedures to be followed in the project.

    • The method statement will include details on quality control measures, testing procedures, and documentation requirements.

  • Answered by AI
  • Q5. Are you prepare a PQP?
  • Ans. 

    Yes, I am able to prepare a PQP (Product Quality Plan).

    • I have experience in creating detailed PQPs outlining quality control processes and procedures.

    • I ensure that the PQP meets all relevant industry standards and regulations.

    • I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.

    • I regularly review and update the PQP to reflect any changes in processes or requirements.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep focus on your job, which you have everyday. Before going to interview learn about company's work.

I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is blinding? Different types of blinds used in o&g?
  • Ans. 

    Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.

    • Temporary or permanent blinds can be used depending on the situation

    • Common types of blinds include spectacle blinds, paddle blinds, and bleed rings

    • Blinding is often used during maintenance or repair work to ensure safety

    • Blinding can also be used to prevent contamination during storage or transportation

    • Blinding can...

  • Answered by AI
  • Q2. Procedures before starting a work in a refinery equipment,
  • Ans. 

    Before starting work in a refinery equipment, certain procedures must be followed.

    • Obtain a work permit

    • Perform a safety check of the equipment

    • Ensure proper personal protective equipment is worn

    • Verify that all valves are in the correct position

    • Confirm that the equipment is properly grounded

    • Check for any leaks or abnormal conditions

    • Communicate with other workers in the area

    • Follow all established procedures and protocols

  • Answered by AI
  • Q3. What will you do if there's an H2S leak and there's no wind movement,
  • Ans. 

    I will follow the emergency response plan and evacuate the area immediately.

    • Activate the alarm system to alert others in the area

    • Put on personal protective equipment (PPE) including a respirator

    • Evacuate the area immediately and move to a safe location

    • Notify emergency services and follow the emergency response plan

    • Monitor the situation and wait for the all-clear signal before returning to the area

  • Answered by AI
  • Q4. From where you'll advice your workers to start unbloting a heat exchanger head?
  • Ans. 

    I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.

    • Start from the top and work your way down

    • Use appropriate tools and safety equipment

    • Follow proper procedures and guidelines

    • Ensure all bolts are properly labeled and accounted for

    • Inspect the gasket and replace if necessary

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, answer what you know.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Good comunication skills
Round 2 - Technical 

(1 Question)

  • Q1. Knowledge about Materials,WPS,Welder qualification, Filler rods.

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the height of top guard rails,mid rails and toe board rails?
  • Ans. 

    The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.

    • The height of top guard rails is typically between 42 and 45 inches above the walking surface.

    • Mid rails are typically located halfway between the top rail and the walking surface.

    • Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.

    • Specific...

  • Answered by AI
  • Q2. What is safe working load and formula?
  • Ans. 

    Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.

    • SWL is determined by factors such as material strength, design, and intended use.

    • Formula for SWL varies depending on the type of equipment or structure.

    • For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.

    • It is important to always follow the manufacturer's...

  • Answered by AI
  • Q3. Job role and duties of HSE engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and very soon joining offer was given.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. About Quality management system
  • Q2. Health Safety & Environment
  • Q3. About Standard, Procedure & Specification
  • Q4. Internal & External Audit

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on scope of work and job responsibility
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. QC procedures and experiences as Quality control inspector
  • Ans. 

    I have extensive experience in implementing QC procedures and conducting inspections as a Quality Control Inspector.

    • Developing and implementing QC procedures to ensure product quality

    • Conducting inspections and tests to identify defects or non-conformities

    • Documenting findings and reporting on quality issues

    • Collaborating with production teams to address quality concerns

    • Continuous improvement of QC processes based on feed

  • Answered by AI
  • Q2. Verified documents for previous submission and approval

SK E&C Interview FAQs

How many rounds are there in SK E&C Qa Qc Welding and Piping Inspector interview?
SK E&C interview process usually has 2 rounds. The most common rounds in the SK E&C interview process are Resume Shortlist and Technical.

Tell us how to improve this page.

Tunnel Engineer
26 salaries
unlock blur

₹12.4 L/yr - ₹24 L/yr

Civil Engineer
18 salaries
unlock blur

₹10 L/yr - ₹26.4 L/yr

Mechanical Engineer
14 salaries
unlock blur

₹6.1 L/yr - ₹22.6 L/yr

Piping Supervisor
10 salaries
unlock blur

₹11.1 L/yr - ₹30 L/yr

Electrical Supervisor
7 salaries
unlock blur

₹12 L/yr - ₹21 L/yr

Explore more salaries
Compare SK E&C with

Nasser S. Al Hajri Corporation

3.6
Compare

Saudi Binladin Group

4.1
Compare

Dodsal Engineering & Construction

4.5
Compare

Leighton Contractors

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview