Filter interviews by
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
Open loop and closed loop are control systems used in engineering and automation.
Open loop systems have no feedback mechanism and rely solely on input commands.
Closed loop systems have a feedback mechanism that adjusts the output based on the input and desired outcome.
Open loop systems are simpler and less expensive, but less accurate and adaptable.
Closed loop systems are more complex and expensive, but more accurate a...
SAT stands for Site Acceptance Test, which is a process to ensure that a system or equipment meets the specified requirements.
SAT is performed at the installation site of the equipment or system.
It is conducted to verify that the equipment or system is installed correctly and operates as intended.
The test is usually performed by the customer or end-user, with the assistance of the supplier or manufacturer.
SAT may inclu...
FFJB and analogue JB are two different types of junction boxes used in electrical systems.
FFJB stands for Fiber-Filled Junction Box and is made of a composite material that is resistant to corrosion and moisture.
Analog JB, on the other hand, is a traditional junction box made of metal or plastic.
FFJB is more expensive than analog JB but offers better protection against environmental factors.
Analog JB is more commonly u...
Top trending discussions
posted on 3 May 2023
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Concrete tests in lab involve various physical and chemical tests to ensure quality and durability.
Physical tests include compressive strength, flexural strength, and density tests.
Chemical tests involve checking for chloride content, alkali-silica reaction, and sulfate resistance.
Other tests may include water absorption, air content, and setting time tests.
Proper curing and sample preparation are crucial for accurate
posted on 24 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There was 1 interview round.
Yes, I am preparing a method statement for the project.
Yes, I am currently working on preparing a method statement for the project.
I am in the process of outlining the steps and procedures to be followed in the project.
The method statement will include details on quality control measures, testing procedures, and documentation requirements.
Yes, I am able to prepare a PQP (Product Quality Plan).
I have experience in creating detailed PQPs outlining quality control processes and procedures.
I ensure that the PQP meets all relevant industry standards and regulations.
I collaborate with cross-functional teams to gather input and ensure alignment on quality goals.
I regularly review and update the PQP to reflect any changes in processes or requirements.
posted on 22 Feb 2022
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
I applied via Campus Placement and was interviewed before Aug 2022. There were 2 interview rounds.
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
Tunnel Engineer
26
salaries
| ₹12.4 L/yr - ₹24 L/yr |
Civil Engineer
18
salaries
| ₹10 L/yr - ₹26.4 L/yr |
Mechanical Engineer
14
salaries
| ₹6.1 L/yr - ₹22.6 L/yr |
Piping Supervisor
10
salaries
| ₹11.1 L/yr - ₹30 L/yr |
Electrical Supervisor
7
salaries
| ₹12 L/yr - ₹21 L/yr |
Nasser S. Al Hajri Corporation
Saudi Binladin Group
Dodsal Engineering & Construction
Leighton Contractors