I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I have a strong background in Electrical Engineering with a focus on emulation.
Completed a Bachelor's degree in Electrical Engineering
Specialized in emulation technologies during postgraduate studies
Worked on projects involving FPGA emulation for hardware testing
Familiar with Verilog and VHDL programming languages
FIFO (First In, First Out) is a method for organizing and manipulating a data buffer, where the first element added is the first to be removed.
FIFO is a queue data structure where elements are added to the end and removed from the front.
It follows the principle of 'First In, First Out', meaning the first element added is the first to be removed.
Example: A printer queue where the first document sent to print is the firs...
Top trending discussions
posted on 16 Jan 2025
I applied via campus placement at Vellore Institute of Technology (VIT) and was interviewed in Dec 2024. There were 2 interview rounds.
3 coding questions were given and all should have to be passed for the next round
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
A stack is a Last In First Out (LIFO) data structure, while a queue is a First In First Out (FIFO) data structure.
Stack: LIFO - Last In First Out. Example: browser history where the last page visited is the first to be accessed.
Queue: FIFO - First In First Out. Example: a line at a grocery store where the first person in line is the first to be served.
Function to find two numbers in array that add up to target. Optimize solution.
Use a hash map to store each number and its index as you iterate through the array.
For each number, check if the difference between the target and the number exists in the hash map.
Return the indices of the two numbers that add up to the target.
posted on 23 Dec 2024
I applied via Company Website
Ghkmkjgvnk jhfy hkoojg bhkkmk
Seeking new challenges and opportunities for growth.
Desire for new challenges and learning opportunities
Looking for career advancement and growth potential
Seeking a more supportive and collaborative work environment
My expected salary is based on my experience, skills, and the market rate for Senior Engineers.
Consider my years of experience in the industry
Take into account my specialized skills and certifications
Research the current market rate for Senior Engineers in this location
Negotiate based on the overall compensation package offered
posted on 13 Jan 2025
I applied via campus placement at Walchand College of Engineering, Sangli and was interviewed in Jul 2024. There were 2 interview rounds.
The first round was a gamified aptitude test, and shortlisting was conducted based on sectional cutoffs. Female candidates were given higher preference.
Circuit breakers are devices that automatically stop the flow of electricity when a fault is detected, while relays are switches that open or close circuits based on electrical signals.
Circuit breakers are designed to protect electrical circuits from damage caused by overcurrent or short circuits.
They work by detecting abnormal current flow and quickly interrupting the circuit to prevent damage.
Relays are electromechan...
A Buchholz relay is a protective device used in oil-filled transformers to detect and prevent internal faults.
Detects faults such as insulation breakdown or arcing within the transformer
Consists of a float switch connected to an alarm or trip circuit
When gas or oil accumulates due to a fault, the float rises and triggers the alarm or trip signal
Helps prevent major damage to the transformer by isolating it from the powe
Induction motor operates on the principle of electromagnetic induction. Mutual inductance is the measure of the coupling between two coils.
Induction motor works on the principle of electromagnetic induction where a rotating magnetic field is produced to induce current in the rotor, causing it to rotate.
Mutual inductance is the measure of the coupling between two coils, indicating how much of the magnetic field produced...
posted on 11 Feb 2025
Motor selection for rotary table involves considering torque requirements, speed, size constraints, and control system compatibility.
Consider torque requirements for the rotary table based on load and acceleration/deceleration needs
Select a motor with appropriate speed capabilities to meet the desired rotation speed
Ensure the motor size fits within the constraints of the rotary table design
Check compatibility with the ...
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Reverse a linked list by changing the pointers direction
Iterate through the linked list and change the direction of pointers
Use three pointers - prev, current, next to reverse the list
Update the head pointer to point to the new first node
based on 1 interview
Interview experience
Senior Software Engineer
1.6k
salaries
| ₹9.7 L/yr - ₹34 L/yr |
Software Developer
1.6k
salaries
| ₹4.8 L/yr - ₹22.5 L/yr |
Software Engineer
1.5k
salaries
| ₹6 L/yr - ₹23.4 L/yr |
Manager
606
salaries
| ₹8.2 L/yr - ₹32 L/yr |
Senior Executive
483
salaries
| ₹5 L/yr - ₹20.1 L/yr |
Schneider Electric
Siemens Energy
ABB
BHEL