I applied via Approached by Company and was interviewed before Oct 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Go through out cv. Family background. Capabilites multiple team handelling. Reason of change.
Round 3 - Technical 

(2 Questions)

  • Q1. Construction planning.
  • Q2. Critical to cost optimization
  • Ans. 

    Effective project planning and management is critical to cost optimization in construction.

    • Develop a detailed project plan with clear timelines and milestones

    • Regularly monitor and track project progress to identify potential cost overruns

    • Implement cost-saving measures such as value engineering and lean construction

    • Collaborate closely with suppliers and subcontractors to negotiate favorable pricing

    • Ensure effective commu...

  • Answered by AI
Round 4 - Personal Interview 

(2 Questions)

  • Q1. Psychological test. Situation handelling. Client handelling. Contractor management.
  • Q2. Personality test Communication skill.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive what you're done last company and try to put light that frame of worked you did.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Indeed and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to layout of building points
  • Ans. 

    The layout of building points is determined by using surveying equipment and techniques to mark the location of key points on the ground.

    • Start by establishing a reference point using GPS or total station.

    • Use measuring tapes, levels, and theodolites to mark out the building corners and key points.

    • Ensure accuracy by cross-checking measurements and using benchmarks for elevation.

    • Consider factors like setbacks, utilities, ...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain the importance of water quality monitoring in JJM projects and the parameters tested
  • Ans. 

    Water quality monitoring is crucial in JJM projects to ensure safe drinking water and compliance with regulations.

    • Water quality monitoring helps in ensuring the safety of drinking water for the community.

    • It helps in identifying any potential contaminants or pollutants in the water sources.

    • Monitoring parameters include pH levels, turbidity, dissolved oxygen, total dissolved solids, and presence of bacteria like E. coli.

    • ...

  • Answered by AI
  • Q2. What are your biggest strengths?
  • Ans. 

    My biggest strengths include strong problem-solving skills, excellent communication abilities, and a proven track record of successful project management.

    • Strong problem-solving skills - I am able to quickly identify issues and come up with effective solutions.

    • Excellent communication abilities - I can effectively communicate with team members, clients, and stakeholders to ensure everyone is on the same page.

    • Proven track...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Share ur experience in height work
  • Q2. Statuary clearances
Round 3 - HR 

(1 Question)

  • Q1. Expected ctc , job location
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. How do you manage Contractor if he is not performing
  • Ans. We can impose LD write an email pertaining to delay of the aforementioned reference to contract parameters
  • Answered Anonymously
Round 2 - HR 

(4 Questions)

  • Q1. How do you control your Annoying and temperament at Work place
  • Q2. I always keep quite and keep aside and alone when these arises
  • Q3. What is your positive and negative things
  • Q4. I always positive towards the Goal assigned to me that is my positive And some time I took personal that is my negative

Interview Preparation Tips

Interview preparation tips for other job seekers - One can opt for job there

Siemens Gamesa Renewable Power Private Limited Interview FAQs

How many rounds are there in Siemens Gamesa Renewable Power Private Limited Construction Manager - Mechanical interview?
Siemens Gamesa Renewable Power Private Limited interview process usually has 4 rounds. The most common rounds in the Siemens Gamesa Renewable Power Private Limited interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Siemens Gamesa Renewable Power Private Limited Construction Manager - Mechanical interview?

Some of the top questions asked at the Siemens Gamesa Renewable Power Private Limited Construction Manager - Mechanical interview -

  1. Critical to cost optimizat...read more
  2. Go through out cv. Family background. Capabilites multiple team handelling. R...read more
  3. Psychological test. Situation handelling. Client handelling. Contractor manage...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Adani Power Interview Questions
3.9
 • 217 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
GE Vernova Interview Questions
4.1
 • 82 Interviews
Jakson Group Interview Questions
4.3
 • 78 Interviews
Siemens Energy Interview Questions
4.1
 • 73 Interviews
Waaree Energies Interview Questions
3.9
 • 57 Interviews
Greenko Group Interview Questions
3.8
 • 47 Interviews
View all
Assistant Manager
212 salaries
unlock blur

₹7 L/yr - ₹19.5 L/yr

Senior Engineer
204 salaries
unlock blur

₹5 L/yr - ₹14 L/yr

Associate Manager
197 salaries
unlock blur

₹9 L/yr - ₹22.4 L/yr

Engineer
173 salaries
unlock blur

₹2.9 L/yr - ₹12 L/yr

Senior Executive
162 salaries
unlock blur

₹5 L/yr - ₹19.6 L/yr

Explore more salaries
Compare Siemens Gamesa Renewable Power Private Limited with

Suzlon Group

4.1
Compare

Vestas

4.3
Compare

Inox Wind

3.7
Compare

GE Vernova

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview