I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I am tracking site progress through regular site visits, daily reports, and communication with the site team.
Regular site visits to observe progress and identify any issues
Reviewing daily reports to track progress against the project schedule
Communicating with the site team to understand any challenges or delays
Updating project management software with progress updates
Analyzing data to identify trends and areas for imp
Yes, I know how to make a budget.
I have experience in creating budgets for various projects.
I am familiar with budgeting software and tools.
I can analyze project requirements and estimate costs accurately.
I can track expenses and adjust budgets as needed.
I can communicate budget status and variances to stakeholders.
Top trending discussions
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Stop work application is a procedure used to halt work activities due to safety concerns or violations.
Stop work applications are typically used when there is an imminent danger to workers or the environment.
Workers are trained to recognize when a stop work application is necessary and how to properly implement it.
Examples of reasons for a stop work application include unsafe working conditions, equipment malfunctions,
Scaffolding is a temporary structure used to support workers and materials during construction or maintenance work.
Scaffolding provides a safe working platform at height
It is typically made of metal or wood
Different types include tube and coupler, frame, and system scaffolding
Scaffolding must be inspected regularly for safety
Types of scaffolding include supported scaffolding, suspended scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground or a building structure.
Suspended scaffolding hangs from the roof or top of a building and is commonly used for window washing or painting.
Aerial lifts are platforms lifted by cranes or other equipment and are commonly used for tasks at height.
Other typ...
Types of accidents/incidents include slips, trips, falls, machinery accidents, chemical exposures, and fires.
Slips, trips, and falls are common in workplaces due to wet floors, cluttered walkways, or uneven surfaces.
Machinery accidents can occur when proper safety procedures are not followed or equipment malfunctions.
Chemical exposures may result from spills, leaks, or improper handling of hazardous substances.
Fires ca...
posted on 13 Feb 2025
I was interviewed in Jan 2025.
I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
I was interviewed in Jan 2025.
posted on 19 Sep 2024
There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.
VG-10: Suitable for low-traffic roads
VG-20: Suitable for medium-traffic roads
VG-30: Suitable for high-traffic roads
VG-40: Suitable for heavy-duty traffic areas like airports and container terminals
The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.
Compressive strength of cement mortar cube is an important parameter to assess its quality and durability
The strength of cement mortar increases with age, so 3 days is an early testing point
Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa
based on 2 interviews
Interview experience
based on 40 reviews
Rating in categories
Site Engineer
18
salaries
| ₹2.2 L/yr - ₹8 L/yr |
Civil Site Engineer
9
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Civil Engineer
8
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Quality Engineer
6
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Accountant
5
salaries
| ₹2.4 L/yr - ₹2.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd