Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
I am tracking site progress through regular site visits, daily reports, and communication with the site team.
Regular site visits to observe progress and identify any issues
Reviewing daily reports to track progress against the project schedule
Communicating with the site team to understand any challenges or delays
Updating project management software with progress updates
Analyzing data to identify trends and areas for imp
Yes, I know how to make a budget.
I have experience in creating budgets for various projects.
I am familiar with budgeting software and tools.
I can analyze project requirements and estimate costs accurately.
I can track expenses and adjust budgets as needed.
I can communicate budget status and variances to stakeholders.
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.
Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.
Compare the quantity of RMC ordered with the quantity actually used in construction.
Identify any discrepancies and investigate the reasons behind them.
Adjust the records accordingly to ensure accurate billing and
BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.
Calculate the total length of bars required for each diameter and type of reinforcement.
Determine the number of bars required for each diameter and type of reinforcement.
Calculate the total weight of bars required for each diameter and type of reinforcement.
Prepare a detailed schedule...
Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.
Use a paint thickness gauge to measure the thickness of the paint layer.
Compare the measured thickness with the specified thickness in the project specifications.
Ensure that the paint thickness is uniform across the surface.
Repeat the measurements at multiple points to ensure accuracy.
Adjust the paint application if...
Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.
Review project specifications for any missed items or changes
Consult with stakeholders such as architects, engineers, and contractors for input
Conduct site visits to identify any additional work required
Analyze previous change orders to see if any item
Consider JMR based on project specifications, quantities, rates, and market conditions.
Review project specifications to ensure accurate billing
Verify quantities of materials and work done
Check rates for labor, materials, and equipment
Consider market conditions for pricing accuracy
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There was 1 interview round.
Rate analysis for plaster involves calculating the cost of materials, labor, and equipment required for plastering a specific area.
Determine the area to be plastered
Calculate the quantity of materials required (cement, sand, water)
Determine the cost of materials per unit
Calculate the cost of labor per unit area
Include the cost of equipment and tools used
Add all costs to get the total cost of plastering
Example: For plas...
BBS is Bar Bending Schedule used for steel reinforcement and BOQ is Bill of Quantities used for building items.
BBS provides details of reinforcement steel required for construction.
BOQ lists all the materials and quantities required for construction.
BBS is used for steel reinforcement in structures like columns, beams, slabs, etc.
BOQ is used for building items like bricks, cement, sand, etc.
Both BBS and BOQ are importa...
Site Engineer
18
salaries
| ₹2.2 L/yr - ₹8 L/yr |
Civil Site Engineer
9
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Civil Engineer
8
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Quality Engineer
6
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Civil Supervisor
5
salaries
| ₹2.5 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd