I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Concrete technology
  • Q2. Mivan shuttering

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (2)

I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell something about you? Describe job description?
Round 3 - Behavioral 

(2 Questions)

  • Q1. Tell core job of administration.
  • Q2. Core questions from work.

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't worry, always believe in your self and don't lose hope.

Manager Interview Questions & Answers

user image Anonymous

posted on 13 Dec 2021

I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. About current steel rates, current structural steel rates and cement rates.
  • Q2. Online interview taken

Interview Preparation Tips

Interview preparation tips for other job seekers - I have selected as per my experience

Manager Interview Questions asked at other Companies

Q1. There is a chairman of a conglomerate. He has been on the post for 10 years, and is extremely dominating. He treats the various business heads like children, not letting them take any major decision. While the chairman has negatives, he bel... read more
View answer (2)

I applied via Naukri.com and was interviewed before Feb 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Format of BBS & Quantity estimation
  • Ans. 

    BBS stands for Bar Bending Schedule which is a document that provides details of reinforcement steel bars, their shape, size, length, and quantity required for a construction project.

    • BBS is prepared based on the structural drawings and specifications provided by the client or consultant.

    • It includes details of each reinforcement bar such as diameter, length, shape, and number of bars required.

    • Quantity estimation is done...

  • Answered by AI
  • Q2. Format of client And contractor billing
  • Ans. 

    Client and contractor billing formats vary based on the project and contract terms.

    • Client billing may be based on milestones achieved or percentage of work completed.

    • Contractor billing may be based on actual work done or as per the contract terms.

    • Invoices should include detailed descriptions of work done, materials used, and any additional charges.

    • Both parties should agree on the billing format and terms before startin

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself before you go.And be calm during interview.

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Shrim Bhanu Construction interview questions for popular designations

 Billing Engineer

 (1)

 Manager

 (1)

 Project Administration Officer

 (1)

 QA QC Engineer

 (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via LinkedIn and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Accounting journal entries
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI

Shrim Bhanu Construction Interview FAQs

How many rounds are there in Shrim Bhanu Construction interview?
Shrim Bhanu Construction interview process usually has 2-3 rounds. The most common rounds in the Shrim Bhanu Construction interview process are Resume Shortlist, HR and Behavioral.
What are the top questions asked in Shrim Bhanu Construction interview?

Some of the top questions asked at the Shrim Bhanu Construction interview -

  1. Format of BBS & Quantity estimat...read more
  2. Format of client And contractor bill...read more
  3. About current steel rates, current structural steel rates and cement rate...read more

Tell us how to improve this page.

People are getting interviews through

based on 4 Shrim Bhanu Construction interviews
Job Portal
Referral
75%
25%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 399 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.4
 • 18 Interviews
View all

Shrim Bhanu Construction Reviews and Ratings

based on 79 reviews

3.7/5

Rating in categories

3.5

Skill development

3.4

Work-Life balance

3.3

Salary & Benefits

3.0

Job Security

3.3

Company culture

3.2

Promotions/Appraisal

3.3

Work Satisfaction

Explore 79 Reviews and Ratings
Site Engineer
22 salaries
unlock blur

₹2.5 L/yr - ₹4.8 L/yr

Executive Accountant
20 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Civil Site Engineer
16 salaries
unlock blur

₹2.5 L/yr - ₹4.3 L/yr

Junior Engineer Civil
12 salaries
unlock blur

₹1.4 L/yr - ₹3 L/yr

Junior Engineer
11 salaries
unlock blur

₹1.5 L/yr - ₹4.5 L/yr

Explore more salaries
Compare Shrim Bhanu Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Hindustan Construction Company

4.2
Compare

Simplex Infrastructures

3.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview