Filter interviews by
I applied via Walk-in and was interviewed before Nov 2021. There was 1 interview round.
Top trending discussions
I applied via Referral
posted on 28 Feb 2024
I applied via Naukri.com and was interviewed before Feb 2023. There were 4 interview rounds.
Past case study and how you slove it
posted on 6 Sep 2023
posted on 10 Nov 2023
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
posted on 2 Feb 2024
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
posted on 10 Sep 2024
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
To convert kW to MW, divide the power in kW by 1000.
To convert kW to MW, divide the power in kW by 1000.
For example, 500 kW is equal to 0.5 MW (500 kW / 1000 = 0.5 MW).
Unit of power is the rate at which work is done or energy is transferred.
Unit of power is measured in watts (W)
1 watt is equal to 1 joule per second
Power can also be measured in horsepower (hp) in some contexts
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
Work from your company home ground
I applied via Approached by company and was interviewed in Jan 2022. There was 1 interview round.
ESP stands for Event Stream Processing, a technology used for real-time data processing and analysis.
ESP is used to analyze and process large volumes of data in real-time.
It can be used in various industries such as finance, healthcare, and transportation.
ESP can help detect anomalies, predict outcomes, and automate decision-making processes.
Examples of ESP platforms include Apache Kafka, IBM Streams, and TIBCO StreamB
based on 1 review
Rating in categories
Assistant Manager
5
salaries
| ₹5.8 L/yr - ₹7.8 L/yr |
Mechanical Engineer
4
salaries
| ₹1.4 L/yr - ₹3.4 L/yr |
Purchase Executive
3
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Finance Manager
3
salaries
| ₹8 L/yr - ₹8 L/yr |
Account Assistant
3
salaries
| ₹2 L/yr - ₹2.4 L/yr |
Dhoot Transmission
R.K.M Powergen
SHV Energy
New Allenberry Works