Filter interviews by
I applied via Referral and was interviewed before Sep 2020. There were 4 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
The minimum slab height depends on the load it needs to bear and the span it needs to cover.
The minimum slab height is determined by the load it needs to bear and the span it needs to cover.
The minimum slab height for residential buildings is usually 4 inches.
For commercial buildings, the minimum slab height is usually 6 inches.
The minimum slab height for industrial buildings can be up to 12 inches or more.
The minimum ...
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
posted on 16 Aug 2024
I applied via Walk-in and was interviewed in Feb 2024. There was 1 interview round.
Waterproofing in a toilet room is essential to prevent water damage and maintain structural integrity.
Waterproofing materials such as membranes, sealants, and coatings are used to protect surfaces from water penetration.
Proper installation of waterproofing systems is crucial to ensure long-term effectiveness.
Regular maintenance and inspections are necessary to identify and address any issues with waterproofing.
Examples...
The weight of 1 meter length depends on the material being measured.
The weight of 1 meter length can vary depending on the material, such as steel, aluminum, wood, etc.
To calculate the weight, you need to know the density of the material.
For example, the weight of 1 meter length of steel would be different from 1 meter length of wood.
The number of bricks in 1m^3 depends on the size of the bricks being used.
The number of bricks in 1m^3 will vary based on the size of the bricks.
Calculate the volume of a single brick and then divide 1m^3 by that volume to get the number of bricks.
For example, if a brick is 0.2m x 0.1m x 0.05m, its volume would be 0.001m^3. Therefore, 1m^3 would contain 1000 bricks.
posted on 10 Jul 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Campus Placement and was interviewed in Sep 2022. There were 3 interview rounds.
I am a Site Engineer with expertise in cement density, brick size, and concrete grade.
I have extensive knowledge of different types of cement and their densities.
I am familiar with various brick sizes and their applications in construction.
I have experience working with different concrete grades for different structural requirements.
I can provide recommendations on the appropriate cement density, brick size, and concre
I am a dedicated and experienced Site Engineer with a strong background in construction and project management.
Bachelor's degree in Civil Engineering
5 years of experience in managing construction projects
Proficient in using construction software and tools
Strong problem-solving and decision-making skills
Excellent communication and leadership abilities
Completed successful projects such as building a commercial complex an
My family background is diverse and has influenced my values and work ethic.
My parents are both engineers, which inspired me to pursue a career in engineering.
I come from a close-knit family that values education and hard work.
My grandparents were farmers, teaching me the importance of perseverance and adaptability.
I have a sibling who is a doctor, which has given me insights into the medical field.
My family has always...
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.
Conduct the offline test
Density of common construction materials
Steel: 7850 kg/m^3
Cement: 1440 kg/m^3
Concrete: 2400 kg/m^3
Sand: 1600-1700 kg/m^3
Aggregates: 1500-1750 kg/m^3
Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.
Calculate the area of the triangle using the formula: 1/2 * base * height.
Multiply the area by the thickness to get the concrete quantity.
For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.
Circular column concrete quantity can be found using the formula: Volume = πr^2h
Calculate the area of the circular column using the formula A = πr^2
Measure the height of the column
Multiply the area by the height to get the volume of concrete needed
Consider any additional factors such as wastage or reinforcement bars
Slump test is a method to measure the consistency of concrete before it sets.
Slump test is used to determine the workability of fresh concrete.
It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
Slump test helps in ensuring that the concrete mix ...
Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.
Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).
After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.
After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.
The percentage of s...
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The mix ratio will vary depending on the strength and durability requirements of the concrete.
Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.
Water is also added to the mix to achieve t
Project Manager
6
salaries
| ₹9 L/yr - ₹16.8 L/yr |
Site Engineer
6
salaries
| ₹2 L/yr - ₹4 L/yr |
Senior Accountant
6
salaries
| ₹3.3 L/yr - ₹4.2 L/yr |
Mechanical Maintenance Engineer
5
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Accountant
5
salaries
| ₹3.2 L/yr - ₹3.6 L/yr |
JLL
CBRE
Square Yards
NoBroker