Shiv Construction Interview Questions, Process, and Tips

Updated 15 Feb 2024

Top Shiv Construction Interview Questions and Answers

View all 10 questions

Shiv Construction Interview Experiences

Popular Designations

2 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

15min easy questions basic maths

Round 2 - Group Discussion 

2 different topics was given and told to discuss

Round 3 - Technical 

(2 Questions)

  • Q1. Height of column in residential and basic concrete fundamentals
  • Ans. 

    The height of a column in residential buildings depends on various factors such as load-bearing capacity, structural design, and architectural preferences.

    • The height of a column in residential buildings is determined by the load it needs to support. Heavier loads may require taller columns.

    • The structural design of the building also plays a role in determining the height of the columns. Engineers consider factors like t...

  • Answered by AI
  • Q2. What types of steel used
  • Ans. 

    Various types of steel are used, depending on the specific application and requirements.

    • Different types of steel are used in construction, automotive industry, manufacturing, and more.

    • Some common types of steel include carbon steel, stainless steel, alloy steel, and tool steel.

    • Carbon steel is widely used due to its strength and affordability.

    • Stainless steel is corrosion-resistant and commonly used in kitchen appliances...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - dont panic just freely answer

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Sep 2021

I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

8 Questions

  • Q1. How much Square feet in 1 m³
  • Ans. 

    There is no direct conversion between square feet and cubic meters as they measure different dimensions.

    • Square feet (ft²) is a unit of area, while cubic meters (m³) is a unit of volume.

    • To convert between the two, you would need to know the height or depth of the space in question.

    • For example, if you have a room that is 10 feet wide, 10 feet long, and 10 feet high, the volume would be 1,000 cubic feet (10 ft × 10 ft × 1...

  • Answered by AI
  • Q2. How can you find Permetric weight of 25mm reinforcement
  • Ans. 

    The permetric weight of 25mm reinforcement can be found using the formula: weight = (d^2/162) * L, where d is the diameter and L is the length.

    • Calculate the square of the diameter of the reinforcement (25mm * 25mm = 625mm^2)

    • Divide the square by 162 (625mm^2 / 162 = 3.858mm)

    • Multiply the result by the length of the reinforcement to get the permetric weight

  • Answered by AI
  • Q3. How many bricks are used in 1 m³
  • Ans. 

    The number of bricks used in 1 m³ varies depending on the size of the bricks.

    • The size of the bricks affects the number of bricks used in 1 m³.

    • Different countries may have different standard brick sizes.

    • To calculate the number of bricks, divide the volume of 1 m³ by the volume of a single brick.

    • For example, if the size of a brick is 0.2 m x 0.1 m x 0.06 m, the volume of a single brick is 0.0012 m³.

    • In this case, the numb...

  • Answered by AI
  • Q4. In M20, what is tha meaning of 20
  • Ans. 

    The number 20 in M20 refers to the compressive strength of concrete in megapascals after 28 days of curing.

    • M20 is a mix of concrete with a compressive strength of 20 megapascals (MPa) after 28 days of curing.

    • The compressive strength of concrete is the maximum amount of compressive stress that the concrete can withstand before failing.

    • The strength of concrete is determined by the ratio of cement, sand, and aggregate use...

  • Answered by AI
  • Q5. Strength of 28 days
  • Ans. 

    Strength of 28 days refers to the compressive strength of concrete after 28 days of curing.

    • It is a measure of the concrete's ability to resist compression.

    • It is an important factor in determining the quality of the concrete.

    • The strength of concrete can vary depending on the mix design, curing conditions, and other factors.

    • The standard for minimum compressive strength of concrete after 28 days is 20 MPa.

    • Testing is done ...

  • Answered by AI
  • Q6. What is the full form of bbd
  • Ans. 

    BBD stands for Babu Banarasi Das, a renowned politician and former Chief Minister of Uttar Pradesh, India.

    • BBD is the acronym for Babu Banarasi Das, a prominent political figure in Uttar Pradesh.

    • Babu Banarasi Das was the Chief Minister of Uttar Pradesh from 1995 to 1996.

    • BBD is also the name of a university in Lucknow, Uttar Pradesh, established in 2010.

  • Answered by AI
  • Q7. How much cement are used in 1m³ for M20 grade
  • Ans. 

    For M20 grade, approximately 320 kg of cement is used in 1m³.

    • M20 grade concrete has a mix proportion of 1:1.5:3 (cement:sand:aggregate).

    • The total volume of the mix is 1+1.5+3 = 5.5

    • Therefore, the cement quantity required for 1m³ = (1/5.5) x 1m³ = 0.182m³

    • The density of cement = 1440 kg/m³ (approx.)

    • Hence, the cement required for 1m³ = 0.182 x 1440 kg/m³ = 262.08 kg/m³ (approx.)

    • However, it is recommended to use 320 kg/m³ t

  • Answered by AI
  • Q8. For this formula,1÷5.5
  • Ans. 

    The answer is 0.1818

    • The formula is a division operation

    • The result is a decimal number

    • The answer is recurring

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. 1st don't be afraid to the interviewer.
2. Listen carefully that what question asking with you.

Top Shiv Construction Site Engineer Interview Questions and Answers

Q1. How can you find Permetric weight of 25mm reinforcement
View answer (2)

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    Experienced business analyst with a background in data analysis and process improvement.

    • Over 5 years of experience in analyzing business processes and identifying areas for improvement

    • Skilled in data analysis tools such as Excel, SQL, and Tableau

    • Strong communication and problem-solving skills

    • Led a project to streamline inventory management processes, resulting in a 20% reduction in costs

  • Answered by AI
  • Q2. Tell me about your roles and responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. Overall process of finishing like tiling, wall gypsum ,plaster,water proofing , with material praporion and there properties
  • Ans. 

    The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.

    • The first step is to prepare the surface by cleaning and leveling it.

    • Waterproofing is done to prevent water damage to the walls and floors.

    • Gypsum plaster is used to create a smooth surface for painting or wallpapering.

    • Tiling involves laying tiles on the floor or walls using adhesive and grout...

  • Answered by AI

Shiv Construction Interview FAQs

How many rounds are there in Shiv Construction interview?
Shiv Construction interview process usually has 3 rounds. The most common rounds in the Shiv Construction interview process are Aptitude Test, Group Discussion and Technical.
What are the top questions asked in Shiv Construction interview?

Some of the top questions asked at the Shiv Construction interview -

  1. How can you find Permetric weight of 25mm reinforcem...read more
  2. How much cement are used in 1m³ for M20 gr...read more
  3. How many bricks are used in 1 ...read more

Tell us how to improve this page.

Shiv Construction Interview Process

based on 2 interviews

Interview experience

4
  
Good
View more

Shiv Construction Reviews and Ratings

based on 19 reviews

4.5/5

Rating in categories

4.0

Skill development

4.3

Work-life balance

3.9

Salary

4.1

Job security

4.6

Company culture

3.7

Promotions

4.5

Work satisfaction

Explore 19 Reviews and Ratings
Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Supervisor
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Shiv Construction with

GAMMON INDIA

3.8
Compare

Patil Group

3.8
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview