Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Patil Group Team. If you also belong to the team, you can get access from here

Patil Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Patil Group DPM Interview Questions and Answers

Updated 23 Oct 2018

Patil Group DPM Interview Experiences

Interview questions from similar companies

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY

I applied via Walk-in and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and used efficiently.

    • Data structures are used to manage large amounts of data efficiently.

    • They provide a way to organize data in a way that makes it easy to access and manipulate.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
Round 3 - Coding Test 

Explain logic of stack

Interview Preparation Tips

Interview preparation tips for other job seekers - Its good place to start your career

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Assignment 

Question are hard in panel

Round 2 - HR 

(3 Questions)

  • Q1. What is the current ctc
  • Ans. 

    I am currently earning a salary of $60,000 per year.

    • My current annual salary is $60,000

    • I am earning $5,000 per month

    • My total compensation package is $60,000

  • Answered by AI
  • Q2. What is the company name
  • Ans. 

    The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.

    • XYZ Corporation is a data analytics firm

    • Specializes in providing insights for businesses

  • Answered by AI
  • Q3. Gammon India Ltd
Round 3 - Case Study 

It is very good in study for
Further studies.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Execution in Structure
  • Ans. 

    Execution in structure refers to the ability to effectively implement plans and strategies within an organized framework.

    • Understanding the overall goals and objectives of the organization

    • Developing detailed action plans to achieve those goals

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and making adjustments as needed

    • Ensuring that resources are allocated efficiently

    • Communicating effectively w...

  • Answered by AI
  • Q2. High rise buildings

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Basic about RCC Surveying

Interview Preparation Tips

Topics to prepare for GAMMON INDIA Junior Engineer Civil interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Keep up to date for your resume and basic interview questions

I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Fidic Red Book, Silver Book,
  • Q2. How to prepare Prolongation Claim
  • Ans. 

    A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.

    • Identify the cause of delay and the impact it had on the project timeline and budget

    • Document all additional costs incurred due to the delay, including labor, materials, and equipment

    • Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...

  • Answered by AI
  • Q3. How to do delay analysis
  • Ans. 

    Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.

    • Identify the critical path of the project

    • Determine the planned vs actual timeline for each activity

    • Identify any changes or disruptions that occurred during the project

    • Quantify the impact of each delay on the project timeline

    • Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis

    • Co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Great Learning but salary delays

Interview Questionnaire 

1 Question

  • Q1. About GSB grades,SDBC

I applied via Other and was interviewed in Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Servicing about New generation hydra

Interview Preparation Tips

Interview preparation tips for other job seekers - I like to take challenge for developing ourself

Tell us how to improve this page.

Quality Engineer
31 salaries
unlock blur

₹1.9 L/yr - ₹4.5 L/yr

Senior Engineer
26 salaries
unlock blur

₹2.9 L/yr - ₹6.3 L/yr

Assistant Manager
24 salaries
unlock blur

₹3 L/yr - ₹7.8 L/yr

Civil Site Engineer
23 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Accountant
22 salaries
unlock blur

₹1.4 L/yr - ₹4.3 L/yr

Explore more salaries
Compare Patil Group with

GAMMON INDIA

3.8
Compare

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.0
Compare

Ray Engineering

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview