Filter interviews by
I applied via Walk-in and was interviewed in Jul 2021. There were 4 interview rounds.
The question is not relevant to the job role of Site Execution Engineer.
The production of 1 pair of carpenter is not a relevant metric for a Site Execution Engineer.
The job role of a Site Execution Engineer involves overseeing and managing construction projects.
The engineer is responsible for ensuring that the project is completed on time, within budget, and to the required quality standards.
The engineer works closely ...
The thickness of vdf concrete varies depending on the application and design requirements.
VDF stands for Vacuum Dewatered Flooring
The thickness can range from 50mm to 150mm
The thickness is determined by factors such as load-bearing capacity, durability, and aesthetics
The concrete is compacted using a vacuum pump to remove excess water and increase strength
Top trending discussions
posted on 10 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 3 Feb 2022
I applied via Campus Placement and was interviewed in Jan 2022. There were 3 interview rounds.
About site experience
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Exam will be conduct for aptitude test
posted on 5 Aug 2022
Steel quantity can be calculated by multiplying the volume of steel by its density.
Calculate the volume of steel required for the project
Determine the density of the specific type of steel being used
Multiply the volume by the density to obtain the steel quantity
Consider any wastage or additional steel required for reinforcement
Example: To calculate steel quantity for a column, multiply the cross-sectional area of the c
The unit weight of steel refers to the weight of a specific volume of steel material.
Unit weight of steel is typically measured in kilograms per cubic meter (kg/m³).
The unit weight of steel can vary depending on the type and grade of steel.
For example, the unit weight of mild steel is around 7850 kg/m³.
Higher strength steels like stainless steel can have a higher unit weight.
Unit weight is an important factor in struct
Slab details refer to the specifications and characteristics of a concrete slab used in construction.
Slab details include the thickness, reinforcement, and type of slab.
The thickness of a slab depends on the load it needs to support.
Reinforcement in slabs is typically provided using steel bars or mesh.
Different types of slabs include one-way slab, two-way slab, flat slab, etc.
Slab details also include the finishing mat
To check column beam reinforcement and slab design on site, follow these steps:
Review the structural drawings and specifications to understand the design requirements
Inspect the reinforcement bars for proper placement, size, and spacing
Check the concrete cover thickness to ensure it meets the design requirements
Verify the alignment and verticality of columns and beams using plumb bobs or laser levels
Measure the dimensi...
How to work with us?
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
Work progress to timely complete target involves planning, monitoring, and adjusting activities to ensure timely completion.
Develop a detailed project schedule with clear milestones and deadlines
Regularly monitor and track progress against the schedule
Identify potential delays or issues and take proactive measures to address them
Allocate resources effectively to ensure tasks are completed on time
Regularly communicate w...
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Deputy Manager
616
salaries
| ₹6 L/yr - ₹16 L/yr |
Senior Engineer
426
salaries
| ₹4 L/yr - ₹12 L/yr |
Construction Engineer
303
salaries
| ₹2.4 L/yr - ₹10 L/yr |
Safety Officer
227
salaries
| ₹1.8 L/yr - ₹7.5 L/yr |
Civil Site Engineer
226
salaries
| ₹1.5 L/yr - ₹9 L/yr |
Tata Group
Reliance Industries
Adani Group
Mahindra & Mahindra