Filter interviews by
I applied via Approached by Company
Tracking specific consumption of raw materials and cost is crucial for effective project management and cost control.
Regularly monitor and record the quantity of raw materials used in production
Calculate the cost of raw materials per unit produced
Analyze trends in raw material consumption to identify areas for optimization
Implement measures to reduce waste and improve efficiency
Utilize software or tools for accurate tr...
Analyzing raw materials and ensuring quality is crucial for successful project management.
Conduct thorough analysis of raw materials to determine quality and suitability for the project
Implement quality control measures to ensure consistency and reliability of raw materials
Collaborate with suppliers to maintain high standards of raw materials
Utilize testing equipment and procedures to assess the quality of raw material...
I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.
A boiler is a closed vessel in which water or other fluid is heated. Mountings and accessories are components attached to the boiler for its proper functioning.
Boiler mounting refers to the necessary fittings and devices for the safe operation of a boiler, such as safety valves, water level indicators, pressure gauges, etc.
Boiler accessories are additional components that help in improving the efficiency and performanc...
Top trending discussions
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing teams and driving sales.
Managed a team of 15 sales associates and consistently exceeded sales targets
Implemented new training programs to improve customer service and product knowledge
Developed and executed marketing strategies to increase foot traffic and drive sales
Handled inventory management and ensured accurate stock levels
Resolved customer complaints a...
I applied via Recruitment Consultant and was interviewed before Nov 2020. There was 1 interview round.
MEIS stands for Merchandise Exports from India Scheme. It is a government initiative to promote exports of goods from India.
MEIS is a scheme introduced by the Indian government to incentivize and promote exports of goods from India.
Under MEIS, exporters are provided with duty credit scrips which can be used to pay various duties and taxes.
The scheme covers a wide range of products and sectors, including agriculture, te...
LC in export stands for Letter of Credit.
LC is a financial document issued by a bank to guarantee payment to the exporter.
It provides assurance to the exporter that they will receive payment for the goods or services exported.
LC serves as a secure method of payment in international trade.
It reduces the risk for both the exporter and the importer.
LC includes details such as the amount, terms, and conditions of the payme...
I appeared for an interview in Sep 2020.
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
A basic aptitude test which focuses on key areas of a person
based on 2 interviews
Interview experience
based on 17 reviews
Rating in categories
Shift Incharge
7
salaries
| ₹2.5 L/yr - ₹4.4 L/yr |
Accountant
5
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Senior Engineer
4
salaries
| ₹4.2 L/yr - ₹9.6 L/yr |
Electrical Engineer
4
salaries
| ₹2.7 L/yr - ₹3.6 L/yr |
Junior Engineer
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
ReNew
Adani Green Energy
Vestas
Jakson Group