Upload Button Icon Add office photos

Filter interviews by

Shah Sponge And Power DCS Engineer Interview Questions and Answers

Updated 12 Jun 2023

Shah Sponge And Power DCS Engineer Interview Experiences

1 interview found

DCS Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Jun 2023

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is bolier. what is mounting and Acciseries of boiler. Boiler lightup procedure what happens when drum ssfety blow.
  • Ans. 

    A boiler is a closed vessel in which water or other fluid is heated. Mountings and accessories are components attached to the boiler for its proper functioning.

    • Boiler mounting refers to the necessary fittings and devices for the safe operation of a boiler, such as safety valves, water level indicators, pressure gauges, etc.

    • Boiler accessories are additional components that help in improving the efficiency and performanc...

  • Answered by AI
  • Q2. Water analisis coal analisis

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is RTD FULL FORM and brief description
  • Ans. 

    RTD stands for Resistance Temperature Detector. It is a temperature sensor that operates on the principle that the resistance of a metal increases with temperature.

    • RTD is commonly used in industrial applications for temperature measurement.

    • Platinum is a popular material for RTDs due to its high accuracy and stability.

    • RTDs are known for their high accuracy and repeatability compared to other temperature sensors.

    • RTDs are...

  • Answered by AI
  • Q2. Introduce yourself all about all project
  • Ans. 

    I am an Instrument Engineer with experience in designing, implementing, and maintaining control systems for various projects.

    • Designed control systems for a chemical plant to optimize production efficiency

    • Implemented safety instrumented systems for a power plant to ensure safe operation

    • Maintained instrumentation for a water treatment facility to meet regulatory standards

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Solar operation and maintenance
  • Q2. Solar project electrical engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - AC DC work and all PM activities daily basis
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Many question related to gearbox
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Introduction of basic electricals
  • Q2. How wind turbine opearates
  • Ans. 

    Wind turbines operate by converting the kinetic energy of wind into mechanical power, which is then converted into electricity.

    • Wind turns the blades of the turbine, causing them to spin

    • The spinning blades turn a shaft connected to a generator

    • The generator converts the mechanical energy into electrical energy

    • The electricity is then sent to the power grid for distribution

    • Wind speed and direction are monitored to optimize

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patient and confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Like what is your work experience. Are you willing to climb twice in a day .
  • Ans. According to your experience needs to give answers Second question- yes
  • Answered Anonymously
  • Q2. Are you willing to work if require to support near by site .
Round 3 - Technical 

(2 Questions)

  • Q1. As per your experience as previous company they asked questions, but more focos on safety .
  • Q2. What is LOTO , Types of LOTO
  • Ans. 

    LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.

    • LOTO involves locking the energy isolating devices with an assigned individual lock and tag to prevent the machine from being turned on.

    • Types of LOTO include electrical LOTO, mechanical LOTO, and pneumatic LOTO.

    • Examples of LOTO ...

  • Answered by AI
Round 4 - Technical 

(1 Question)

  • Q1. Previous experiences questions, like DFIG , Converter system, power factor , transformer , lighting system, Earthing system .
Round 5 - Case Study 

Normal discussion with seniors

Round 6 - HR 

(1 Question)

  • Q1. Salary discussion and joining details

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare proper resume , focused what you write on your cv according to you will get questions, so prepare accordingly.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is the Transformer
  • Ans. 

    A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Consists of two coils of wire, known as primary and secondary coils

    • Primary coil receives electrical energy and creates a magnetic field

    • Magnetic field induces a voltage in the secondary coil, transferring energy

    • Used in power distribution, voltage regulation, and electrical isolation

  • Answered by AI
  • Q2. Electrical 8 equipment

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. O2 analiger location in Boiler
  • Ans. 

    The O2 analiger in a boiler is typically located in the flue gas stream.

    • The O2 analiger is used to measure the oxygen content in the flue gas.

    • It is important to monitor the oxygen levels in the flue gas to optimize combustion efficiency.

    • The O2 analiger is usually installed in the boiler's flue gas duct or stack.

    • It may be located at a specific distance from the boiler outlet to ensure accurate measurements.

    • The O2 analig...

  • Answered by AI
  • Q2. Then before ESP AND after APH to O2 analiger installed . Then what type problem.
  • Ans. No problem. But APH leakage then problem.
  • Answered Anonymously
  • Q3. Desuperheting line identify and which location.
  • Ans. 

    Desuperheating line is used to reduce the temperature of superheated steam by injecting water or other cooling agents.

    • Desuperheating line is typically located downstream of the superheater in a boiler system.

    • It is used to control the temperature of the steam to prevent damage to downstream equipment.

    • The location of the desuperheating line may vary depending on the specific boiler design and application.

    • Examples of desu...

  • Answered by AI
  • Q4. BFP discharge line connection and permary superheter outlet and secondary superheter inlet side connection.
  • Q5. APH leakage what type problem in Boiler and identify of leakage .
  • Ans. 

    APH leakage is a problem in boilers that can lead to reduced efficiency and increased emissions.

    • APH stands for Air Preheater, which is used to heat the combustion air before it enters the boiler.

    • Leakage in the APH can result in loss of heat and reduced efficiency.

    • Identifying the leakage involves inspecting the APH for visible signs of damage or leakage, conducting pressure tests, and monitoring performance parameters.

    • C...

  • Answered by AI
  • Q6. Types of losses in Boiler
  • Ans. 

    Types of losses in Boiler

    • Heat loss through flue gases

    • Heat loss through radiation and convection

    • Incomplete combustion losses

    • Blowdown losses

    • Ash and unburnt losses

  • Answered by AI
  • Q7. There are eight types loss in Boiler
  • Ans. 

    There are eight types of losses in a boiler.

    • The eight types of losses in a boiler are: radiation, convection, exhaust, blowdown, incomplete combustion, unburnt fuel, ash, and moisture.

    • Radiation loss occurs due to the heat radiated from the boiler's surface.

    • Convection loss occurs due to the heat carried away by the flue gases.

    • Exhaust loss occurs due to the heat carried away by the exhaust gases.

    • Blowdown loss occurs due ...

  • Answered by AI
  • Q8. Drum pressure which area drop
  • Ans. 

    Drum pressure drops in the area of steam generation and distribution.

    • Drum pressure drop can occur due to steam leakage in the distribution system.

    • Pressure drop can also happen in the steam generation process, such as in the boiler or heat exchanger.

    • Other factors that can cause drum pressure drop include fouling or scaling in the system.

    • Monitoring and maintaining proper drum pressure is crucial for efficient and safe op

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good question in interview questions in technical form in Boiler DCS Engineer CFBC Boiler.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was very easy ,duration 45 min for 30 questions

Round 2 - One-on-one 

(2 Questions)

  • Q1. It was of moderate level 2-3 questions
  • Q2. What is your name

Interview Preparation Tips

Interview preparation tips for other job seekers - chill
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2023.

Round 1 - Technical 

(1 Question)

  • Q1. All electrical panel HT <

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job

Shah Sponge And Power Interview FAQs

How many rounds are there in Shah Sponge And Power DCS Engineer interview?
Shah Sponge And Power interview process usually has 2 rounds. The most common rounds in the Shah Sponge And Power interview process are Resume Shortlist and Technical.
What are the top questions asked in Shah Sponge And Power DCS Engineer interview?

Some of the top questions asked at the Shah Sponge And Power DCS Engineer interview -

  1. what is bolier. what is mounting and Acciseries of boiler. Boiler lightup proce...read more
  2. Water analisis coal anali...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 820 Interviews
JSW Steel Interview Questions
3.9
 • 563 Interviews
Vestas Interview Questions
4.3
 • 81 Interviews
ReNew Interview Questions
4.2
 • 81 Interviews
Jakson Group Interview Questions
4.3
 • 74 Interviews
Wind World Interview Questions
3.9
 • 70 Interviews
View all
Shift Incharge
6 salaries
unlock blur

₹2.5 L/yr - ₹4.4 L/yr

Accountant
5 salaries
unlock blur

₹2.5 L/yr - ₹3.5 L/yr

Boiler DCS Engineer
4 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Safety Officer
4 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Electrical Maintenance Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Explore more salaries
Compare Shah Sponge And Power with

JSW Steel

3.9
Compare

Tata Steel

4.1
Compare

Steel Authority Of India

4.1
Compare

Jindal Steel and Power

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview