Upload Button Icon Add office photos

Filter interviews by

Steag Energy Services Boiler DCS Engineer Interview Questions, Process, and Tips

Updated 15 May 2023

Steag Energy Services Boiler DCS Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(8 Questions)

  • Q1. O2 analiger location in Boiler
  • Ans. 

    The O2 analiger in a boiler is typically located in the flue gas stream.

    • The O2 analiger is used to measure the oxygen content in the flue gas.

    • It is important to monitor the oxygen levels in the flue gas to optimize combustion efficiency.

    • The O2 analiger is usually installed in the boiler's flue gas duct or stack.

    • It may be located at a specific distance from the boiler outlet to ensure accurate measurements.

    • The O2 analig...

  • Answered by AI
  • Q2. Then before ESP AND after APH to O2 analiger installed . Then what type problem.
  • Ans. No problem. But APH leakage then problem.
  • Answered Anonymously
  • Q3. Desuperheting line identify and which location.
  • Ans. 

    Desuperheating line is used to reduce the temperature of superheated steam by injecting water or other cooling agents.

    • Desuperheating line is typically located downstream of the superheater in a boiler system.

    • It is used to control the temperature of the steam to prevent damage to downstream equipment.

    • The location of the desuperheating line may vary depending on the specific boiler design and application.

    • Examples of desu...

  • Answered by AI
  • Q4. BFP discharge line connection and permary superheter outlet and secondary superheter inlet side connection.
  • Q5. APH leakage what type problem in Boiler and identify of leakage .
  • Ans. 

    APH leakage is a problem in boilers that can lead to reduced efficiency and increased emissions.

    • APH stands for Air Preheater, which is used to heat the combustion air before it enters the boiler.

    • Leakage in the APH can result in loss of heat and reduced efficiency.

    • Identifying the leakage involves inspecting the APH for visible signs of damage or leakage, conducting pressure tests, and monitoring performance parameters.

    • C...

  • Answered by AI
  • Q6. Types of losses in Boiler
  • Ans. 

    Types of losses in Boiler

    • Heat loss through flue gases

    • Heat loss through radiation and convection

    • Incomplete combustion losses

    • Blowdown losses

    • Ash and unburnt losses

  • Answered by AI
  • Q7. There are eight types loss in Boiler
  • Ans. 

    There are eight types of losses in a boiler.

    • The eight types of losses in a boiler are: radiation, convection, exhaust, blowdown, incomplete combustion, unburnt fuel, ash, and moisture.

    • Radiation loss occurs due to the heat radiated from the boiler's surface.

    • Convection loss occurs due to the heat carried away by the flue gases.

    • Exhaust loss occurs due to the heat carried away by the exhaust gases.

    • Blowdown loss occurs due ...

  • Answered by AI
  • Q8. Drum pressure which area drop
  • Ans. 

    Drum pressure drops in the area of steam generation and distribution.

    • Drum pressure drop can occur due to steam leakage in the distribution system.

    • Pressure drop can also happen in the steam generation process, such as in the boiler or heat exchanger.

    • Other factors that can cause drum pressure drop include fouling or scaling in the system.

    • Monitoring and maintaining proper drum pressure is crucial for efficient and safe op

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good question in interview questions in technical form in Boiler DCS Engineer CFBC Boiler.

Steag Energy Services Interview FAQs

How many rounds are there in Steag Energy Services Boiler DCS Engineer interview?
Steag Energy Services interview process usually has 2 rounds. The most common rounds in the Steag Energy Services interview process are Resume Shortlist and Technical.
What are the top questions asked in Steag Energy Services Boiler DCS Engineer interview?

Some of the top questions asked at the Steag Energy Services Boiler DCS Engineer interview -

  1. APH leakage what type problem in Boiler and identify of leakag...read more
  2. Desuperheting line identify and which locati...read more
  3. There are eight types loss in Boi...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Steag Energy Services interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
Adani Power Interview Questions
3.9
 • 201 Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Tata Power Interview Questions
3.9
 • 156 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
Torrent Power Interview Questions
3.7
 • 123 Interviews
Eaton Corporation Interview Questions
4.0
 • 114 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all

Steag Energy Services Boiler DCS Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

4.0

Skill development

4.1

Work-Life balance

3.3

Salary & Benefits

5.0

Job Security

5.0

Company culture

4.1

Promotions/Appraisal

4.0

Work Satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
267 salaries
unlock blur

₹4.1 L/yr - ₹9 L/yr

Engineer
187 salaries
unlock blur

₹2.8 L/yr - ₹9.9 L/yr

Assistant Manager
186 salaries
unlock blur

₹5.2 L/yr - ₹12 L/yr

Deputy Manager
163 salaries
unlock blur

₹6.5 L/yr - ₹16.5 L/yr

Manager
92 salaries
unlock blur

₹8.9 L/yr - ₹26 L/yr

Explore more salaries
Compare Steag Energy Services with

Thermax Limited

4.2
Compare

Siemens

4.1
Compare

BGR Energy Systems

3.7
Compare

BHEL

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview