Filter interviews by
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
Aptitude test on Technical , Logical , Reasoning
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 24 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.
There are typically 18 documents in a PPAP submission.
PPAP (Production Part Approval Process) typically consists of 18 documents.
These documents include items such as control plans, FMEA, dimensional results, and more.
Each document serves a specific purpose in demonstrating the supplier's ability to meet customer requirements.
PPAP documents are crucial in the automotive industry and other manufacturing sectors.
Notice period is the amount of time an employee must give before leaving a job.
Notice period is typically stated in the employment contract.
It allows the employer to find a replacement for the departing employee.
Notice periods can vary depending on the company and position.
Some companies may require a longer notice period for higher-level positions.
Employees may be required to work during their notice period or be paid
I applied via Indeed and was interviewed in Mar 2022. There was 1 interview round.
posted on 12 May 2024
posted on 4 Jul 2024
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
posted on 18 Jun 2024
I appeared for an interview in Jan 2025.
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
ABC analysis is a technique used to categorize items based on their importance or value.
ABC analysis divides items into three categories: A, B, and C.
Category A items are the most important and valuable, while category C items are the least important and valuable.
ABC analysis is commonly used in inventory management to prioritize items for restocking or ordering.
For example, a grocery store might use ABC analysis to pr...
FIFO (First-In, First-Out) and LIFO (Last-In, First-Out) are inventory management methods.
FIFO: Oldest items are sold first, used in industries like retail and food.
LIFO: Newest items are sold first, used in industries like manufacturing and construction.
I handle rejection and damaged materials by staying calm, assessing the situation, and taking appropriate action.
Remain calm and composed when faced with rejection or damaged materials
Assess the extent of the damage and determine the cause of rejection
Take appropriate action to rectify the situation, such as repairing or replacing damaged materials
Implement preventive measures to minimize future rejections or damages
Ma...
5S is a methodology for workplace organization and standardization.
Sort - eliminate unnecessary items
Set in order - organize remaining items
Shine - clean and inspect work area
Standardize - establish procedures and schedules
Sustain - maintain and improve
Advantages include increased efficiency, safety, and quality
Reduces waste and improves morale
Example: A factory implements 5S to reduce clutter and improve workflow
Inventory is maintained through regular monitoring, accurate record-keeping, and efficient replenishment.
Regularly monitor inventory levels to identify shortages or excesses
Keep accurate records of all incoming and outgoing inventory
Implement a system for efficient replenishment, such as using reorder points or automated ordering
Conduct regular audits to ensure inventory accuracy
Utilize inventory management software or...
GRN stands for Goods Receipt Note and e-way bill is an electronic document required for the movement of goods.
GRN is a document used to record the receipt of goods from a supplier.
It includes details such as the quantity, quality, and condition of the goods received.
GRN helps in verifying the accuracy of the goods received and is used for inventory management.
E-way bill is an electronic document required for the moveme...
based on 1 interview
Interview experience
Senior Engineer
22
salaries
| ₹4.4 L/yr - ₹7.6 L/yr |
Electrical Engineer
12
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Engineer
12
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Product Specialist
8
salaries
| ₹4 L/yr - ₹6.5 L/yr |
Marketing Engineer
8
salaries
| ₹2.7 L/yr - ₹5.2 L/yr |
IndustryBuying.com
DESIGNCO
Krishi Rasayan Exports
P.N. International