Upload Button Icon Add office photos

Filter interviews by

Sarooj Construction Company Interview Questions and Answers

Updated 24 Aug 2022

Sarooj Construction Company Interview Experiences

1 interview found

Round 1 - One-on-one 

(2 Questions)

  • Q1. Past experience about the project
  • Ans. 

    I have experience working on a commercial construction project.

    • Managed the construction of a 10-story office building

    • Coordinated with architects, contractors, and subcontractors

    • Ensured compliance with building codes and regulations

    • Scheduled and supervised construction activities

    • Resolved any issues or conflicts that arose during the project

  • Answered by AI
  • Q2. Concrete, foundation,

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical solid and confident about the project

Construction Engineer Interview Questions asked at other Companies

Q1. What's your biggest mistakes in your carrier?
View answer (4)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is Total Float (TF) and Free Float(FF)?
  • Q2. What is your understanding of Earned Value Analysis (EVA)?
  • Q3. What are the key aspects to consider in delay analysis?
  • Q4. How would you rate your proficiency in P6/MSP on a scale of 1 to 10?
  • Q5. What are the different types of contracts?
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basis Electrical Questions like Relation between Voltage and current, Reactive Power, Series Parallel Connections etc
  • Q2. About Projects and Internships

Interview Preparation Tips

Topics to prepare for Tractebel Pget interview:
  • Electricals
  • Power Electronics
  • Basic
Interview preparation tips for other job seekers - Guys, stick to basics and try to give crisp answers
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at Thiagarajar College of Engineering, Madurai and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Basic topics like India before covid and after covid, Global warming, Educational System in india

Round 2 - Technical 

(4 Questions)

  • Q1. What is transformer?
  • Ans. 

    A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Consists of two coils of wire, known as primary and secondary coils

    • Primary coil receives electrical energy and induces a magnetic field

    • Magnetic field then induces a voltage in the secondary coil

    • Used to step up or step down voltage levels in electrical systems

  • Answered by AI
  • Q2. What are the types of Rectifiers?
  • Ans. 

    Types of rectifiers include half-wave, full-wave, and bridge rectifiers.

    • Half-wave rectifier only allows one half of the AC input waveform to pass through

    • Full-wave rectifier allows both halves of the AC input waveform to pass through

    • Bridge rectifier uses four diodes to rectify the AC input waveform

    • Examples include diode rectifiers and semiconductor rectifiers

  • Answered by AI
  • Q3. Difference between Synchronous and induction motor
  • Ans. 

    Synchronous motors have constant speed and require external excitation, while induction motors have variable speed and are self-starting.

    • Synchronous motors have a constant speed determined by the frequency of the power supply.

    • Induction motors have variable speed depending on the load.

    • Synchronous motors require external excitation to generate a magnetic field, while induction motors are self-starting.

    • Synchronous motors ...

  • Answered by AI
  • Q4. What is Ohms law?
  • Ans. 

    Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.

    • Ohm's law is represented by the formula: V = I * R, where V is voltage, I is current, and R is resistance.

    • It helps in calculating the relationship between voltage, current, and resistance in an electrical circuit.

    • For example, if a circuit has a vo...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Will you ready to go to abroad after 5 years?
  • Ans. 

    Yes, I am open to the possibility of going abroad after 5 years for career advancement and new experiences.

    • I am open to exploring international opportunities for career growth.

    • I believe working abroad can provide valuable experiences and broaden my perspective.

    • I am willing to adapt to new cultures and environments for professional development.

  • Answered by AI
  • Q2. Why you have not choose higher education
  • Ans. 

    I chose to start working in the electrical field to gain practical experience and skills rather than pursuing higher education.

    • Prefer hands-on learning over theoretical education

    • Opportunity to gain real-world experience in the field

    • Financial constraints prevented pursuing higher education

    • Passionate about electrical work and wanted to start career sooner

  • Answered by AI
  • Q3. Family details and Occupation

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic interview and speak confidently
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Naukri.com and was interviewed in Oct 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Was easy and able to complete within time

Round 2 - Technical 

(2 Questions)

  • Q1. Selection of material
  • Q2. Selection of hydraulic
Round 3 - One-on-one 

(2 Questions)

  • Q1. When will you join
  • Q2. Why you left from the company
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(8 Questions)

  • Q1. Can you tell me about yourself?
  • Ans. 

    I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.

    • Over 5 years of experience in project control and management

    • Proficient in using project management software such as Primavera P6 and Microsoft Project

    • Skilled in analyzing project data and providing accurate forecasts

    • Strong communication and teamwork skills, able to collaborate with cr...

  • Answered by AI
  • Q2. What are the basics of Primavera?
  • Ans. 

    Primavera is a project management software used for planning, scheduling, and controlling projects.

    • Primavera is commonly used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • Users can generate reports, monitor costs, and manage risks within the software.

    • Primavera offers features like Gantt...

  • Answered by AI
  • Q3. What types of activities are there?
  • Q4. What are the different types of relationships?
  • Ans. 

    Different types of relationships include familial, romantic, professional, and platonic relationships.

    • Familial relationships: relationships between family members such as parents, siblings, and children.

    • Romantic relationships: intimate relationships between partners or spouses.

    • Professional relationships: relationships between colleagues or business partners.

    • Platonic relationships: non-romantic relationships based on fr

  • Answered by AI
  • Q5. How can you create a schedule?
  • Ans. 

    A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.

    • Identify all project tasks and break them down into smaller, manageable activities.

    • Estimate the duration of each task based on historical data or expert judgment.

    • Sequence the tasks in the order they need to be completed, considering dependencies between tasks.

    • Assign resources to ea...

  • Answered by AI
  • Q6. What is a look-ahead report?
  • Ans. 

    A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.

    • Provides a snapshot of upcoming project activities

    • Highlights potential roadblocks and proposed solutions

    • Helps project team anticipate and plan for future challenges

    • Usually covers a short-term period, such as the next week or month

  • Answered by AI
  • Q7. What are the steps to create a look-ahead report?
  • Ans. 

    Steps to create a look-ahead report

    • Identify the project milestones and deadlines

    • Review the project schedule and identify upcoming tasks

    • Analyze potential risks and delays

    • Update the look-ahead report with current progress and forecasted completion dates

    • Communicate the report to stakeholders for awareness and decision-making

  • Answered by AI
  • Q8. What are the 14 points of the DCMA (Defense Contract Management Agency)?
  • Ans. 

    The 14 points of the DCMA are guidelines for effective project management in defense contracts.

    • Establish clear project objectives and requirements

    • Develop a realistic project schedule

    • Assign responsibilities and authorities clearly

    • Ensure adequate resources are available

    • Maintain open communication with stakeholders

    • Identify and manage project risks

    • Monitor and control project performance

    • Implement corrective actions when nec...

  • Answered by AI
Round 2 - Technical 

(5 Questions)

  • Q1. What is earned value management?
  • Ans. 

    Earned value management is a project management technique for measuring project performance and progress.

    • Compares actual work completed and costs incurred to planned work and costs

    • Helps in forecasting project outcomes based on current performance

    • Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)

    • Formula: EV = % of work completed * Total budget

    • Example: If a project is 50% complete and the tot...

  • Answered by AI
  • Q2. What are the key performance indicators?
  • Ans. 

    Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.

    • KPIs are specific, quantifiable metrics used to track progress towards organizational goals.

    • They help in evaluating the success of a project or business by measuring performance in key areas.

    • Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,

  • Answered by AI
  • Q3. A project scenario was provided, and I was required to identify the key performance indicators.
  • Q4. What are the various formulas used to calculate the Budget at Completion (BAC)?
  • Ans. 

    Formulas used to calculate Budget at Completion (BAC) in project control engineering.

    • BAC = Planned Value (PV) at completion

    • BAC = Actual Cost (AC) + Estimate to Complete (ETC)

    • BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)

  • Answered by AI
  • Q5. Where do you see yourself in five years?
  • Ans. 

    In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.

    • Continuing to enhance my project management skills through advanced training and certifications

    • Taking on more responsibilities and leadership roles within the organization

    • Successfully completing several high-profile projects and delivering exceptional results

    • Mentoring and guiding j...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations for this position?
  • Ans. 

    My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.

    • Research industry standards for Project Control Engineer salaries

    • Consider my level of experience and qualifications

    • Be prepared to negotiate based on the overall compensation package offered

  • Answered by AI
  • Q2. What are the working hours that are suitable for you?
  • Ans. 

    I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.

    • I am open to working flexible hours to accommodate project needs

    • I am willing to work overtime when required to meet project deadlines

    • I can adjust my schedule to align with team meetings or client requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When determining salary expectations, focus solely on the in-hand salary and do not factor in the travel allowance.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Reverse the string
  • Ans. 

    Reverse a given string

    • Use a loop to iterate through the characters of the string

    • Append each character to a new string in reverse order

    • Return the reversed string

  • Answered by AI
  • Q2. Merge sort on infinite linklist
  • Ans. 

    Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.

    • Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.

    • One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.

    • Another approach is to use a different sorting algorithm that can handl...

  • Answered by AI
  • Q3. Operating systems
  • Q4. System designing
  • Q5. Object oriented programming

Skills evaluated in this interview

Heavy BUS Driver. Kuwait Interview Questions & Answers

Nasser S. Al Hajri Corporation user image Anonymous

posted on 21 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I was interviewed in Nov 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. I am interested bus and truck driver heavy
  • Q2. I am India and club express

Interview Preparation Tips

Interview preparation tips for other job seekers - I am interested your habit driver bus and truck
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. No comments. it is conidential
  • Q2. No Comments. it is confidential.
Round 2 - One-on-one 

(1 Question)

  • Q1. No comments. it is confidential

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep it simple and be ethical while talking. Tell what you have done or knowledge you have. Do not unnecessary brag about yourself.

Sarooj Construction Company Interview FAQs

How many rounds are there in Sarooj Construction Company interview?
Sarooj Construction Company interview process usually has 1 rounds. The most common rounds in the Sarooj Construction Company interview process are One-on-one Round.

Tell us how to improve this page.

Sarooj Construction Company Interview Process

based on 2 interviews

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 413 Interviews
GMR Group Interview Questions
4.1
 • 77 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Sarooj Construction Company Reviews and Ratings

based on 32 reviews

4.3/5

Rating in categories

3.9

Skill development

3.5

Work-life balance

3.9

Salary

4.0

Job security

3.8

Company culture

3.0

Promotions

4.1

Work satisfaction

Explore 32 Reviews and Ratings
QA QC Inspector
6 salaries
unlock blur

₹11.1 L/yr - ₹13.7 L/yr

QA QC Engineer
5 salaries
unlock blur

₹14 L/yr - ₹30 L/yr

HSE Advisor
5 salaries
unlock blur

₹12.5 L/yr - ₹15 L/yr

Accountant
4 salaries
unlock blur

₹4.4 L/yr - ₹5 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹10 L/yr - ₹12.5 L/yr

Explore more salaries
Compare Sarooj Construction Company with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview