i
Sansera Engineering
Filter interviews by
I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.
The process of producing aluminium involves several stages and responsibilities for engineers.
The process starts with mining bauxite and refining it into alumina
Electrolysis is then used to extract aluminium from alumina
Engineers are responsible for designing and maintaining the equipment used in the process
They must also ensure safety and efficiency in production
Production documents must be created to track progress a
Machines handles are the controls or levers used to operate machines.
Machines handles can include buttons, switches, knobs, and pedals.
Examples of machines with handles include cars, sewing machines, and power tools.
Handles can control various functions such as speed, direction, and power.
Proper use of machine handles is important for safety and efficient operation.
Cycle times for machines can be calculated by dividing the total production time by the number of cycles completed.
Determine the total production time for the machine
Count the number of cycles completed by the machine
Divide the total production time by the number of cycles to calculate the cycle time
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in May 2022. There were 4 interview rounds.
Various t-codes are used in SAP MM module for different purposes.
MM01 - Create Material Master
MM02 - Change Material Master
MM03 - Display Material Master
ME21N - Create Purchase Order
ME22N - Change Purchase Order
ME23N - Display Purchase Order
MIGO - Goods Movement
MIRO - Invoice Verification
MB51 - Material Document List
ME2N - Purchase Orders by PO Number
ME2M - Purchase Orders by Material
ME2L - Purchase Orders by Vendor
ME2
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
I applied via Referral and was interviewed before Jul 2023. There were 2 interview rounds.
Codility test consisting of MCQ questions and 2 OOPS design questions or 1 OOPS design question and 1 DSA question
posted on 29 Oct 2023
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 4 interview rounds.
To improve skill manpower, focus on training programs, mentorship, career development, and recruitment strategies.
Implement regular training programs to enhance skills and knowledge
Provide mentorship opportunities for junior employees to learn from experienced professionals
Offer career development paths and opportunities for advancement within the organization
Revise recruitment strategies to attract top talent with the
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams, conducting planned maintenance activities, and improving overall equipment efficiency.
TPM also emphasizes training employees to take ownership...
I applied via Naukri.com and was interviewed before Mar 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2023. There were 3 interview rounds.
It was of 30 mins and moderate to tough paper
based on 41 reviews
Rating in categories
Engineer
249
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Senior Engineer
239
salaries
| ₹3.5 L/yr - ₹9.5 L/yr |
Quality Inspector
219
salaries
| ₹1.4 L/yr - ₹4.1 L/yr |
Trainee
185
salaries
| ₹1 L/yr - ₹4 L/yr |
Junior Engineer
176
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
Ceat Tyres