Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
I was interviewed in Mar 2021.
Sanghi Industries interview questions for popular designations
I applied via LinkedIn and was interviewed in Jul 2021. There were 3 interview rounds.
Get interview-ready with Top Sanghi Industries Interview Questions
Condition based monitoring analysis is crucial for maintenance in thermal power plants.
Condition based monitoring involves analyzing data from various sensors to detect any abnormalities or potential failures in equipment.
This analysis helps in predicting maintenance requirements and scheduling maintenance activities accordingly.
Thermal power plants use various techniques such as vibration analysis, oil analysis, and t...
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
Close loops in CFBC boiler operation are used for controlling various parameters.
Close loop for controlling bed temperature
Close loop for controlling air flow rate
Close loop for controlling fuel feed rate
Close loop for controlling steam pressure
Close loop for controlling flue gas temperature
Turbine protection system is a safety system that protects the turbine from damage during abnormal conditions.
It monitors various parameters like temperature, pressure, vibration, and speed.
It triggers alarms and trips the turbine if any parameter exceeds the safe limit.
It also includes emergency shutdown systems to prevent catastrophic failures.
Examples of protection systems include overspeed protection, low oil press...
To edit a rung in AB PLC software RS Logix, follow these steps:
Open the RS Logix software and select the project
Navigate to the ladder logic editor and locate the rung to be edited
Double-click on the rung to open the rung editor
Make the necessary changes to the rung
Save the changes and download the updated program to the PLC
I applied via Approached by Company and was interviewed before May 2018. There were 2 interview rounds.
Top trending discussions
The duration of Sanghi Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 20 interviews
Interview experience
based on 579 reviews
Rating in categories
Assistant Engineer
86
salaries
| ₹2 L/yr - ₹4 L/yr |
Assistant Manager
71
salaries
| ₹4.9 L/yr - ₹12 L/yr |
Engineer
71
salaries
| ₹2.8 L/yr - ₹6.5 L/yr |
Mechanical Engineer
61
salaries
| ₹2.4 L/yr - ₹6.5 L/yr |
Senior Engineer
54
salaries
| ₹4.1 L/yr - ₹6.8 L/yr |
UltraTech Cement
Ambuja Cements
ACC
JK Cement