LRS stands for Load Rejection Switching and GRR stands for Grid Rejection Switching.
LRS is a technique used to test the ability of a generator to withstand sudden load rejection.
GRR is a technique used to test the ability of a generator to withstand sudden grid rejection.
Both LRS and GRR are important tests for ensuring the reliability and stability of power systems.
During LRS and GRR tests, the generator is disconnect...
Top trending discussions
posted on 5 May 2024
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
As an Electrical Engineer, my responsibility within the plant includes designing, testing, and maintaining electrical systems to ensure smooth operations.
Designing electrical systems for optimal plant operations
Testing and troubleshooting electrical equipment to ensure functionality
Maintaining electrical systems to prevent downtime and ensure safety
Collaborating with other engineers and plant personnel to address elect...
Plant production capacity refers to the maximum output that a plant can produce within a given time frame.
Plant production capacity is measured in terms of units produced per hour, day, or month.
Factors that affect plant production capacity include equipment efficiency, labor availability, and raw material availability.
Increasing plant production capacity often involves optimizing processes, improving equipment, and st...
posted on 5 Jan 2025
I applied via Newspaper Ad and was interviewed in Jul 2024. There were 3 interview rounds.
General aptitude and logical reasoning
posted on 18 Nov 2024
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
A motor is a device that converts electrical energy into mechanical energy to produce motion.
Converts electrical energy into mechanical energy
Produces motion
Common types include AC motors and DC motors
A transformer is a device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of primary and secondary coils
Works on the principle of electromagnetic induction
Used to step up or step down voltage levels
Examples: power transformers, distribution transformers
PCC stands for Power Control Center.
PCC is a type of electrical distribution panel used to control power supply to various electrical equipment.
It helps in distributing power to different circuits and equipment in an organized manner.
PCCs are commonly used in industrial settings to manage power distribution efficiently.
posted on 12 Sep 2023
posted on 3 Jan 2024
I applied via Campus Placement and was interviewed in Jul 2023. There was 1 interview round.
I applied via Campus Placement and was interviewed in Nov 2021. There was 1 interview round.
posted on 9 May 2022
I applied via LinkedIn and was interviewed in Nov 2021. There were 4 interview rounds.
Advance electrical
based on 7 reviews
Rating in categories
Assistant Engineer
64
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Engineer
49
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Mechanical Engineer
48
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Deputy Manager
47
salaries
| ₹5.4 L/yr - ₹14.3 L/yr |
Assistant Manager
36
salaries
| ₹5 L/yr - ₹11 L/yr |
UltraTech Cement
Ambuja Cements
ACC
JK Cement