Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.
Top trending discussions
posted on 26 Aug 2024
The tool commonly used for Root Cause Analysis is the Fishbone Diagram (Ishikawa Diagram).
Fishbone Diagram (Ishikawa Diagram) is a visual tool used to identify the possible causes of a problem.
5 Whys technique is also commonly used for Root Cause Analysis.
Pareto Analysis can be used to prioritize the causes identified in the Fishbone Diagram.
Root Cause Analysis software like TapRooT or Apollo Root Cause Analysis can al...
CTQ stands for Critical to Quality. It is a key measurable characteristic of a product or process that is essential for customer satisfaction.
CTQs are identified based on customer requirements and expectations.
They are used to define the quality standards that must be met for a product or process to be considered successful.
Examples of CTQs include product dimensions, performance metrics, and defect rates.
CTQ parameters are critical to quality parameters that directly impact customer satisfaction. Controls are measures put in place to ensure these parameters are met.
CTQ parameters are key characteristics of a product or service that directly impact customer satisfaction
Controls are measures put in place to ensure CTQ parameters are met consistently
Examples of CTQ parameters include product dimensions, performance metric...
We use JIRA for bug tracking and TestRail for test case management. Our main supplier for testing tools is SmartBear.
JIRA for bug tracking
TestRail for test case management
Main supplier: SmartBear
Anodizing process is required to increase corrosion resistance, improve durability, enhance aesthetic appeal, and provide better adhesion for paint or other coatings.
Increases corrosion resistance by forming a protective oxide layer on the surface of the metal
Improves durability by hardening the surface of the metal
Enhances aesthetic appeal by offering a variety of color options through dyeing
Provides better adhesion f...
Customer complaint is feedback from customers regarding issues with products or services. Anticipation of defects involves proactive measures to identify and address potential issues before they occur.
Customer complaint is any feedback or concern raised by a customer regarding a product or service.
Anticipation of defects involves implementing quality control measures to identify and address potential issues before they...
Some of the soft skills I possess include strong communication, problem-solving abilities, leadership skills, and attention to detail.
Strong communication skills - able to effectively convey information and ideas
Problem-solving abilities - adept at identifying issues and finding solutions
Leadership skills - capable of guiding and motivating team members
Attention to detail - meticulous in ensuring accuracy and quality
What action required for control porosity defect through Machining process
I applied via Naukri.com and was interviewed before Aug 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
posted on 19 Jan 2018
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 4 interview rounds.
Related to manufacturing
Manufacturing of gears involves various processes including grinding which can be done through different types of grinding machines.
Gears can be manufactured through processes like hobbing, shaping, milling, and grinding.
Grinding is the process of removing material from a workpiece using a grinding wheel.
Types of grinding machines used for gear manufacturing include cylindrical grinding machines, centerless grinding ma...
I applied via Naukri.com and was interviewed in Feb 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
197
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Engineer
184
salaries
| ₹2 L/yr - ₹5 L/yr |
Assistant Manager
176
salaries
| ₹4.5 L/yr - ₹10.1 L/yr |
Quality Engineer
127
salaries
| ₹1 L/yr - ₹4.4 L/yr |
Production Engineer
115
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
JBM Group
Subros
Endurance Technologies
Spark Minda