Upload Button Icon Add office photos

Filter interviews by

Samanvay Realty RMC Plant Operator Interview Questions, Process, and Tips

Updated 26 Apr 2021

Samanvay Realty RMC Plant Operator Interview Experiences

1 interview found

I applied via Walk-in

Interview Questionnaire 

4 Questions

  • Q1. What is plant capacity
  • Ans. 

    Plant capacity refers to the maximum amount of output that a plant can produce within a given time period.

    • Plant capacity is measured in terms of units produced per hour, day, or year.

    • It is determined by factors such as the size of the plant, the efficiency of the equipment, and the availability of resources.

    • For example, a concrete batching plant may have a capacity of producing 100 cubic meters of concrete per hour.

    • Pla...

  • Answered by AI
  • Q2. What is batch size of docket
  • Ans. 

    The batch size of a docket refers to the quantity of material or product that is processed or produced in a single batch.

    • The batch size can vary depending on the specific requirements of the RMC plant and the project it is serving.

    • It is typically measured in terms of volume, such as cubic meters or cubic yards.

    • The batch size determines the amount of raw materials, such as cement, aggregates, and water, that are used in...

  • Answered by AI
  • Q3. How much time for loading 7cm
  • Ans. 

    The time required for loading 7cm depends on various factors such as the type of material, equipment used, and the efficiency of the operator.

    • The type of material being loaded can affect the loading time. For example, loading 7cm of gravel may take less time compared to loading 7cm of wet concrete.

    • The equipment used for loading, such as a conveyor belt or a bucket loader, can impact the loading time. More efficient equ...

  • Answered by AI
  • Q4. What is per second first batch loading
  • Ans. 

    Per second first batch loading refers to the process of loading the initial batch of materials into a Ready Mix Concrete (RMC) plant per second.

    • Per second first batch loading is a crucial step in the operation of an RMC plant.

    • It involves loading the first batch of materials, such as aggregates, cement, and water, into the plant within a specific time frame.

    • The time frame for per second first batch loading can vary depe...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As on intererview focus on technical issues

Skills evaluated in this interview

Samanvay Realty Interview FAQs

What are the top questions asked in Samanvay Realty RMC Plant Operator interview?

Some of the top questions asked at the Samanvay Realty RMC Plant Operator interview -

  1. What is per second first batch load...read more
  2. What is plant capaci...read more
  3. What is batch size of doc...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
DLF Interview Questions
4.0
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
View all
Civil Site Engineer
13 salaries
unlock blur

₹1.2 L/yr - ₹4.4 L/yr

Site Engineer
8 salaries
unlock blur

₹2.7 L/yr - ₹4.8 L/yr

Senior Civil Engineer
7 salaries
unlock blur

₹3.8 L/yr - ₹6.9 L/yr

Purchase Executive
7 salaries
unlock blur

₹2 L/yr - ₹3.3 L/yr

Senior Civil Site Engineer
6 salaries
unlock blur

₹2.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Samanvay Realty with

DLF

4.0
Compare

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview