Plant capacity refers to the maximum amount of output that a plant can produce within a given time period.
Plant capacity is measured in terms of units produced per hour, day, or year.
It is determined by factors such as the size of the plant, the efficiency of the equipment, and the availability of resources.
For example, a concrete batching plant may have a capacity of producing 100 cubic meters of concrete per hour.
Pla...
The batch size of a docket refers to the quantity of material or product that is processed or produced in a single batch.
The batch size can vary depending on the specific requirements of the RMC plant and the project it is serving.
It is typically measured in terms of volume, such as cubic meters or cubic yards.
The batch size determines the amount of raw materials, such as cement, aggregates, and water, that are used in...
The time required for loading 7cm depends on various factors such as the type of material, equipment used, and the efficiency of the operator.
The type of material being loaded can affect the loading time. For example, loading 7cm of gravel may take less time compared to loading 7cm of wet concrete.
The equipment used for loading, such as a conveyor belt or a bucket loader, can impact the loading time. More efficient equ...
Per second first batch loading refers to the process of loading the initial batch of materials into a Ready Mix Concrete (RMC) plant per second.
Per second first batch loading is a crucial step in the operation of an RMC plant.
It involves loading the first batch of materials, such as aggregates, cement, and water, into the plant within a specific time frame.
The time frame for per second first batch loading can vary depe...
Top trending discussions
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I appeared for an interview in Jun 2019.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Effective project handling involves planning, communication, and adaptability to ensure successful outcomes.
Define clear project goals and objectives to align the team.
Utilize project management tools like Jira or Trello for tracking progress.
Conduct regular team meetings to discuss updates and challenges.
Implement Agile methodologies to adapt to changes quickly.
Document all processes and decisions for future reference
posted on 20 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
The finishing process involves plastering, painting, and final touches before handing over the completed project to the client.
Plastering is done to create a smooth surface on walls and ceilings.
Painting is then carried out to add color and protection to the surfaces.
Final touches may include installing fixtures, cleaning, and ensuring everything is in place for handover.
Quality control checks are essential at each sta
UPVC window components are parts used in the construction of UPVC windows, such as frames, sashes, glass panes, and hardware.
UPVC frames are the main structural component of the window
Sashes are the movable parts that hold the glass in place
Glass panes provide visibility and insulation
Hardware includes handles, locks, hinges, and other accessories
Seals and gaskets are used to prevent air and water leakage
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
based on 29 reviews
Rating in categories
Civil Site Engineer
13
salaries
| ₹1.2 L/yr - ₹4.4 L/yr |
Site Engineer
8
salaries
| ₹2.7 L/yr - ₹3.4 L/yr |
Senior Civil Engineer
7
salaries
| ₹3.8 L/yr - ₹6.9 L/yr |
Purchase Executive
7
salaries
| ₹2 L/yr - ₹3.3 L/yr |
Senior Civil Site Engineer
6
salaries
| ₹2.8 L/yr - ₹4.2 L/yr |
Signature Global
Pittie Group
Maxinfra
Vensa Infrastructure