Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Sai Utility & Fire System Team. If you also belong to the team, you can get access from here

Sai Utility & Fire System Verified Tick

Compare button icon Compare button icon Compare
4.7

based on 9 Reviews

Filter interviews by

Sai Utility & Fire System Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About Yourself ?
  • Q2. Why Resign current job?
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Looking for new challenges and opportunities to learn and grow.

    • Desire for career advancement and professional development.

    • Seeking a better work-life balance or company culture.

    • Relocation or personal reasons.

    • Company restructuring or changes in management.

  • Answered by AI
Round 2 - Technical 

(5 Questions)

  • Q1. What's your job responsibility at current site ?
  • Ans. 

    I am responsible for managing the IT infrastructure, overseeing network security, and leading a team of IT professionals.

    • Managing IT infrastructure

    • Overseeing network security

    • Leading a team of IT professionals

  • Answered by AI
  • Q2. Do you know Configure RF devices ?
  • Ans. 

    Yes, configuring RF devices involves setting up and optimizing radio frequency devices for optimal performance.

    • Configuring RF devices involves adjusting settings such as frequency, power levels, and modulation to ensure proper communication.

    • Examples of RF devices include routers, access points, and wireless adapters.

    • Proper configuration of RF devices is essential for reliable wireless communication and network performa

  • Answered by AI
  • Q3. What is the needed material for installation and Configure CCTV ?
  • Ans. 

    Materials needed for installing and configuring CCTV include cameras, cables, DVR/NVR, monitor, power supply, and tools.

    • Cameras (e.g. dome cameras, bullet cameras)

    • Cables (e.g. coaxial cables, Ethernet cables)

    • DVR/NVR (Digital Video Recorder/Network Video Recorder)

    • Monitor (for viewing footage)

    • Power supply (for cameras and DVR/NVR)

    • Tools (e.g. drill, screwdriver)

  • Answered by AI
  • Q4. Do you have knowledge about firewall devices ?
  • Ans. 

    Yes, I have knowledge about firewall devices.

    • Firewall devices are used to monitor and control incoming and outgoing network traffic based on predetermined security rules.

    • They can be hardware-based or software-based.

    • Examples of firewall devices include Cisco ASA, Palo Alto Networks, and Fortinet.

    • Firewalls can be configured to block certain types of traffic, such as specific websites or protocols.

    • They are essential for n...

  • Answered by AI
  • Q5. How many types of switches uses in networking for LAN network and CCTV network ?
  • Ans. 

    There are two main types of switches used in networking for LAN network and CCTV network: managed switches and unmanaged switches.

    • Managed switches offer more control and features, such as VLAN support and Quality of Service (QoS) settings.

    • Unmanaged switches are simpler and easier to set up, but offer less customization and control.

    • Examples of managed switches include Cisco Catalyst series and HP ProCurve series.

    • Example...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. About Your current CTC?
  • Q2. Expected CTC
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Ducting types youed
  • Q2. Ducting any types of material
  • Q3. Mep for explain
  • Q4. Mep basic form housed property
  • Q5. Electrical line
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about your work experience
  • Ans. 

    I have over 10 years of experience in sales management, leading teams to exceed targets and drive revenue growth.

    • Managed a team of 15 sales representatives, consistently exceeding monthly sales targets by 20%

    • Implemented new sales strategies that resulted in a 30% increase in revenue within the first year

    • Developed strong relationships with key clients, leading to repeat business and referrals

  • Answered by AI
  • Q2. Why did you left previous company
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Company restructuring or downsizing

    • Relocation to a different area

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What salary you are drown
  • Ans. 

    I am currently drawing a salary of $70,000 per year.

    • My current salary is $70,000 per year

    • I am satisfied with my current salary

    • I am open to discussing salary expectations for this position

  • Answered by AI
  • Q2. What is your expectations
  • Ans. 

    I expect to lead a high-performing sales team, drive revenue growth, and exceed targets.

    • Lead and motivate sales team to achieve targets

    • Develop and implement sales strategies to drive revenue growth

    • Monitor and analyze sales performance to make data-driven decisions

    • Build strong relationships with clients and partners

    • Stay updated on industry trends and competitor activities

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Introduce yourself
  • Q2. What are your strengths
  • Q3. Asked about the role
  • Q4. Asked about projects
  • Q5. Projects related qns
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How many sweep in catia? sweep names?
  • Ans. 

    There are multiple types of sweeps in CATIA, each with its own unique name.

    • There are several types of sweeps in CATIA, including linear sweep, circular sweep, multi-section sweep, and variable section sweep.

    • Each type of sweep has its own specific name based on its functionality and geometry.

    • For example, a linear sweep is used to create a feature by moving a profile along a straight path, while a circular sweep revolves...

  • Answered by AI
  • Q2. What is slider and lifters?
  • Ans. 

    Slider and lifters are components used in injection molding to create complex shapes and features in plastic parts.

    • Slider: used to create undercuts or side holes in a part by moving horizontally

    • Lifters: used to create features that need to be lifted out of the mold at an angle

    • Both components help in creating intricate designs and shapes in injection molded parts

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What are the plastic defects?
  • Ans. 

    Plastic defects are imperfections or flaws in plastic materials that can affect their performance and appearance.

    • Sink marks: depressions on the surface caused by uneven cooling

    • Weld lines: weak points where molten plastic meets during molding

    • Flash: excess material around the edges of a molded part

    • Short shots: incomplete filling of the mold resulting in missing sections

    • Warpage: distortion or bending of the plastic due to

  • Answered by AI
  • Q2. How to use reflect line command?
  • Ans. 

    Reflect line command is used to create a mirror image of a selected line.

    • Select the line you want to reflect

    • Go to the 'Modify' menu and choose 'Reflect Line'

    • Select the line to be used as the mirror line

    • The reflected line will be created as a mirror image of the original line

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What are the Standard Methods of measurement Used in the construction Industry?
  • Ans. 

    Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.

    • SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works

    • CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works

    • NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...

  • Answered by AI
  • Q2. What types of software are used for quantity stack-off and estimation in construction?
  • Ans. 

    Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.

    • Bluebeam

    • Planswift

    • CostX

  • Answered by AI
  • Q3. What is the NRM? Use of NRM1, 2 and 3
  • Ans. 

    NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.

    • NRM1 is used for the preparation of bills of quantities in construction projects.

    • NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...

  • Answered by AI
  • Q4. What is the Value Engineering?
  • Ans. 

    Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.

    • Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.

    • It focuses on improving the value of a project by optimizing its functions, quality, and cost.

    • Value Engineering often involves brainstorming sessions with a team of experts to...

  • Answered by AI
  • Q5. What is the main Role of the Quantity Surveyor in Pre-Contact and Post-Contract Stages?
  • Ans. 

    Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.

    • Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.

    • Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.

    • Quantity Surveyors also provide advice on contractual m...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is the Salary Expectation based on your Qualifications and Experience?
  • Ans. 

    Salary expectation is based on qualifications, experience, industry standards, and location.

    • Consider industry standards for Civil Quantity Surveyors and Site Engineers

    • Take into account your level of experience and qualifications

    • Factor in the location of the job as cost of living varies

    • Research average salaries for similar positions in your area

    • Be prepared to negotiate based on benefits and perks offered

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Coding Test 

Algorithm to create a Linked List.

Round 2 - Technical 

(1 Question)

  • Q1. Project and past exprience related interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. About Team handling experience & what if team is not performing?
  • Q2. Requirements worked on
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Network technologies
  • Q2. Project management
Round 2 - HR 

(1 Question)

  • Q1. Good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Drawing as built
  • Ans. 

    Structure complete at the time taken as built coordinate

  • Answered by Mohammad Jaleel Ahmed
  • Q2. Site position moment
  • Q3. Topography survey
  • Q4. Lay out survey for site
  • Ans. 

    Laying out a survey for a site involves determining property boundaries and marking them with stakes or flags.

    • Start by reviewing property deeds and legal documents to understand boundaries

    • Use surveying equipment like total stations or GPS to measure and mark boundaries accurately

    • Consider any existing structures or obstacles on the site that may affect the survey layout

  • Answered by AI
  • Q5. Setting out coordinate
  • Ans. 

    Setting out coordinate involves establishing points on the ground based on a specific coordinate system.

    • Use surveying equipment like total stations or GPS to accurately measure and mark points

    • Ensure the coordinate system used is consistent and accurate

    • Verify the points set out match the design or plan specifications

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Land surveyor

Tell us how to improve this page.

Interview Questions from Similar Companies

J&F Interview Questions
3.8
 • 29 Interviews
Eversendai Interview Questions
3.9
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all

Sai Utility & Fire System Reviews and Ratings

based on 9 reviews

4.7/5

Rating in categories

4.6

Skill development

4.2

Work-Life balance

4.6

Salary & Benefits

4.8

Job Security

4.9

Company culture

4.4

Promotions/Appraisal

4.7

Work Satisfaction

Explore 9 Reviews and Ratings
Safety Officer
6 salaries
unlock blur

₹2.5 L/yr - ₹3.5 L/yr

Senior Safety Officer
4 salaries
unlock blur

₹4 L/yr - ₹7.2 L/yr

Project Engineer
3 salaries
unlock blur

₹3.7 L/yr - ₹5.8 L/yr

Project Engineer Mechanical
3 salaries
unlock blur

₹2.4 L/yr - ₹2.8 L/yr

Explore more salaries
Compare Sai Utility & Fire System with

CTS Consulting & Technical Support

3.8
Compare

Patel Infrastructure

3.9
Compare

J K Fenner

3.9
Compare

Onshore Construction

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview