I applied via Company Website and was interviewed in Jul 2022. There was 1 interview round.
Quantity of concrete refers to the amount of concrete required for a particular project.
It is measured in cubic meters or cubic feet.
The quantity of concrete required depends on the dimensions of the project.
It is calculated by multiplying the length, width, and height of the project.
For example, a 10 ft x 10 ft x 6 in slab would require 0.42 cubic yards of concrete.
Development length of steel is the length of rebar required to transfer stress from steel to concrete.
It is the length of rebar required to transfer stress from steel to concrete
It is dependent on the diameter of the rebar and the strength of the concrete
It is calculated using the formula Ld = (phi x fy x As) / (4 x f'c x sqrt(fy))
Ld is the development length, phi is the reduction factor, fy is the yield strength of th...
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 4 May 2019
Site Engineer
5
salaries
| ₹2.2 L/yr - ₹3.2 L/yr |
Civil Engineer
4
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Site & Billing Engineer
3
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures