Filter interviews by
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Consimenent,e-way bill, Booking
MSDS report and tooling audit
The least count of a Vernier caliper is the smallest measurement that can be read on the scale.
The least count is determined by the number of divisions on the main scale and the Vernier scale.
To calculate the least count, divide the smallest division on the main scale by the number of divisions on the Vernier scale.
For example, if the smallest division on the main scale is 0.1 mm and the Vernier scale has 10 divisions,
Types of gauges, clearance and basic metrology instruments with least counts.
Types of gauges: plug, ring, snap, bore, thread, etc.
Types of clearance: running, sliding, interference, etc.
Basic metrology instruments: micrometer, vernier caliper, height gauge, etc.
Least counts: micrometer (0.01mm), vernier caliper (0.02mm), height gauge (0.02mm), etc.
Top trending discussions
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
Yes, I am fit for the post of Quality Engineer.
I have a strong background in quality engineering with experience in implementing quality control processes.
I am skilled in conducting quality audits and inspections to identify areas for improvement.
I have expertise in using quality tools and methodologies such as Six Sigma and Lean principles.
I have successfully led cross-functional teams to resolve quality issues and im...
I am a detail-oriented Quality Engineer with a strong background in ensuring product quality and process improvement.
Experienced in conducting quality audits and inspections
Proficient in using statistical analysis tools to identify and resolve quality issues
Skilled in developing and implementing quality control procedures
Strong problem-solving and analytical skills
Excellent communication and teamwork abilities
I tend to procrastinate and sometimes struggle with time management.
Procrastination
Time management
Difficulty prioritizing tasks
Occasional lack of focus
posted on 9 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
Seven QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
posted on 5 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.
Quality is a crucial aspect of any product or service in the present times.
Quality is a key factor in customer satisfaction and loyalty.
Quality control measures ensure that products meet the required standards.
Quality assurance processes help in identifying and addressing potential issues before they become major problems.
Quality management systems like Six Sigma and Lean help in improving overall quality and efficienc...
posted on 1 Jul 2021
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment operates compared to its designed speed.
Quality measures the percentage of good-quality pr...
Production planning in shopfloor involves creating a detailed plan for manufacturing processes to ensure efficient and timely production.
Production planning involves determining the sequence of operations, resources required, and estimated time for each task.
It includes creating a production schedule, allocating resources, and coordinating with different departments.
The goal is to optimize production, minimize downtime...
Productivity is the measure of efficiency and output in relation to the resources used.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It is the ratio of output to input, indicating how much is produced per unit of input.
Higher productivity means achieving more output with the same or fewer resources.
For example, in manufacturing, productivity can be measured by the number o...
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes guidelines and procedures for maintain...
posted on 31 Aug 2022
I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.
I applied via Walk-in
I applied via Walk-in and was interviewed in Jun 2021. There were 5 interview rounds.
MTC stands for Measurement and Test Control.
MTC is a process used in quality engineering to ensure that measurements and tests are performed accurately and consistently.
It involves establishing control over measurement and test equipment, calibration procedures, and data analysis methods.
MTC helps in maintaining the reliability and accuracy of measurements and tests, which is crucial for quality assurance.
For example, ...
The problem-solving technique involves identifying the problem, analyzing its root cause, brainstorming solutions, implementing the best solution, and evaluating the results.
Identify the problem by gathering information and understanding the desired outcome.
Analyze the root cause by using tools like fishbone diagram or 5 Whys.
Brainstorm potential solutions by involving a diverse group of stakeholders.
Implement the best...
Some of the top questions asked at the RSB Transmissions interview for freshers -
based on 1 interview
Interview experience
based on 373 reviews
Rating in categories
Quality Engineer
88
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
61
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Sunbeam Auto
Suprajit Engineering
UNO Minda