i
Isgec Heavy Engineering
Filter interviews by
I was interviewed in May 2024.
The number of Engineering Documents processed in an EPC project varies depending on the size and complexity of the project.
The number of Engineering Documents processed in an EPC project can range from hundreds to thousands.
These documents include drawings, specifications, calculations, reports, and other technical documents.
The exact number of documents will depend on the scope of the project, the number of discipline...
I applied via Company Website and was interviewed in Feb 2021. There was 1 interview round.
Top trending discussions
posted on 14 Feb 2022
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 17 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 22 Apr 2021
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
The grinding process involves using a rotating abrasive wheel to remove material from a workpiece.
Grinding is a machining process that uses an abrasive wheel to remove material from a workpiece.
The workpiece is held in place while the grinding wheel rotates at high speed, making contact with the material and removing small chips.
Different types of grinding processes include surface grinding, cylindrical grinding, and c...
Establish open communication, respect union rules, negotiate fairly, address concerns promptly
Establish open communication channels with union representatives
Respect union rules and regulations to maintain a positive relationship
Negotiate fairly and transparently during contract discussions
Address any concerns or grievances from unionised manpower promptly and effectively
posted on 13 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
IATF certification ensures that an organization's quality management system meets international standards for automotive industry.
IATF certification is required for any organization that wants to supply products or services to the automotive industry.
It ensures that the organization's quality management system meets international standards for the automotive industry.
It helps to improve the organization's processes and...
Kaizen is continuous improvement while Poka Yoke is mistake-proofing.
Kaizen focuses on making small, incremental improvements to processes and systems over time.
Poka Yoke aims to prevent mistakes from happening by designing processes and systems in a way that makes errors impossible or easily detectable.
Kaizen is a long-term strategy while Poka Yoke is a short-term tactic.
Examples of Kaizen include implementing a sugge...
Points to consider while designing fixtures or gauges.
Understand the purpose of the fixture or gauge
Consider the material and size of the workpiece
Ensure proper clamping and alignment
Design for ease of use and maintenance
Consider the manufacturing process and cost
Test and validate the fixture or gauge before use
posted on 13 Sep 2022
Interview experience
based on 24 reviews
Rating in categories
Assistant Manager
318
salaries
| ₹7 L/yr - ₹16.7 L/yr |
Senior Engineer
282
salaries
| ₹4.5 L/yr - ₹13.2 L/yr |
Deputy Manager
190
salaries
| ₹9.5 L/yr - ₹21 L/yr |
Manager
149
salaries
| ₹8 L/yr - ₹24 L/yr |
Engineer
145
salaries
| ₹3.5 L/yr - ₹9 L/yr |
Thermax Limited
BHEL
Larsen & Toubro Limited
Tata Power