Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I have a Bachelor's degree in Mechanical Engineering and 5 years of experience in production engineering.
Bachelor's degree in Mechanical Engineering
5 years of experience in production engineering
A BIW fixture is a tool used in automotive manufacturing to hold and position the body-in-white during assembly.
BIW stands for Body-In-White, which refers to the stage of automotive manufacturing where the car body is assembled but not yet painted or trimmed.
The fixture is designed to hold the car body in a precise position during assembly, ensuring that all components fit together correctly.
BIW fixtures are typically ...
321 principle is a method of prioritizing tasks based on their urgency and importance.
The principle suggests dividing tasks into three categories: important and urgent, important but not urgent, and urgent but not important.
Tasks that are both important and urgent should be given the highest priority.
Examples of tasks that fall into each category include: important and urgent - a deadline for a project, important but n...
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Quality tools are techniques and methods used to ensure products or services meet customer requirements and expectations.
Quality tools include statistical process control, root cause analysis, and failure mode and effects analysis.
They help identify and eliminate defects, reduce waste, and improve efficiency.
Examples of quality tools include Pareto charts, fishbone diagrams, and control charts.
Quality tools are used in...
5S is a methodology used in production to improve efficiency and organization.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workspace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workspace.
Standardize involves creating procedures and guidelines for maintaining the w...
Production process is a series of steps involved in the manufacturing of a product or providing a service.
It involves planning, designing, testing, and executing the process
It includes the use of raw materials, machinery, and labor to produce the final product
It aims to optimize efficiency, quality, and cost-effectiveness
Examples include assembly line production, software development, and food processing
I applied via Job Portal and was interviewed before Sep 2021. There were 4 interview rounds.
I expect to utilize my technical skills and knowledge to optimize production processes and ensure efficient operations.
I expect to work closely with the production team to identify areas for improvement and implement solutions.
I expect to monitor production metrics and analyze data to identify trends and areas for improvement.
I expect to collaborate with other departments, such as maintenance and quality control, to en...
based on 1 interview
Interview experience
based on 10 reviews
Rating in categories
Production Engineer
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Incharge
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
26
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Carborundum Universal Limited
Saint-Gobain
Hindustan Abrasives
Norton Abrasives