Rsb Infrastructure Senior Manager Project Management Interview Questions and Answers

Updated 25 Aug 2023

Rsb Infrastructure Senior Manager Project Management Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Group Discussion 

All details of activities from start to End on written test

Round 3 - Technical 

(2 Questions)

  • Q1. Technical interview with directors
  • Q2. Planning of project on MS office
  • Ans. 

    Planning a project on MS Office involves creating a detailed schedule, tracking progress, and managing resources.

    • Use MS Project to create a project schedule with tasks, timelines, and dependencies

    • Utilize Excel for budgeting, resource allocation, and tracking project expenses

    • Use PowerPoint for creating project presentations to stakeholders

    • Collaborate with team members using SharePoint for document sharing and communicat

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Deeply knowledge of civil Engineering require bcs owner also BTech in civil

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Casting related
Round 2 - Technical 

(2 Questions)

  • Q1. Soil Test related
  • Q2. Shear force Bending moment
Round 3 - HR 

(2 Questions)

  • Q1. Statutory documentary
  • Q2. Previous experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, including timelines, resources, and budget.

    • Executing: Implement the project plan and manage resources effectively.

    • Monitoring: Track project progress, identify risks, and make necessary adjustments.

    • Closing: Finalize...

  • Answered by AI
  • Q2. How to manage risk and mitigation plan
  • Ans. 

    Risk management involves identifying, assessing, and prioritizing risks, as well as developing mitigation plans to minimize their impact.

    • Identify potential risks by conducting a thorough risk assessment

    • Assess the likelihood and impact of each risk on the project

    • Prioritize risks based on their severity and potential impact

    • Develop a mitigation plan for each identified risk, including strategies to minimize or eliminate t...

  • Answered by AI
  • Q3. How will you track Long lead item
  • Ans. 

    Long lead items can be tracked by creating a detailed schedule, monitoring progress regularly, and communicating with suppliers.

    • Create a detailed schedule outlining the delivery dates of long lead items

    • Regularly monitor the progress of long lead items to ensure they are on track

    • Communicate effectively with suppliers to address any delays or issues

    • Utilize project management software to track and manage long lead items

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. Notice period
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Labour productivity
  • Q2. Master plan details
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About experience

Safety Manager Interview Questions & Answers

JLL user image Pramod R. Bante

posted on 30 Jul 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is name? Tell about u r self.
  • Q2. Ok I got the work Ok I got the work
Round 3 - Technical 

(3 Questions)

  • Q1. Explain safety and y it’s important
  • Ans. 

    Safety is the practice of preventing accidents, injuries, and illnesses in the workplace to protect employees and assets.

    • Safety is important to ensure the well-being of employees and prevent accidents.

    • It helps in maintaining a positive work environment and employee morale.

    • Safety measures can reduce costs associated with accidents and injuries.

    • Compliance with safety regulations is essential to avoid legal issues and pen...

  • Answered by AI
  • Q2. To keep ourselves and team safety
  • Q3. Y u want to work with us?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Pressure in fire hydrant pipe
  • Ans. 

    Pressure in fire hydrant pipe is determined by factors like water flow rate, pipe diameter, and elevation difference.

    • Pressure in fire hydrant pipe is directly related to the flow rate of water through the pipe.

    • The diameter of the pipe also affects the pressure, with larger diameter pipes resulting in lower pressure loss.

    • Elevation difference between the hydrant and the point of discharge can impact the pressure in the p...

  • Answered by AI
  • Q2. What is NRC full form
  • Ans. 

    NRC stands for National Register of Citizens.

    • NRC is a register containing names of all genuine Indian citizens in the state of Assam, India.

    • It was first prepared in 1951 and is now being updated to identify illegal immigrants.

    • The NRC process involves verifying the citizenship status of individuals based on documents like birth certificates, land records, etc.

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

They have taken eligibility test

Round 2 - HR 

(1 Question)

  • Q1. There was HR technical question and answer scheduled
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal Interview Current CTC Current location Expected CTC
Round 2 - One-on-one 

(1 Question)

  • Q1. Projects Details Area of projects Types of projects
  • Ans. 

    The area of projects and types of projects I have worked on vary greatly.

    • I have worked on projects in various industries including construction, healthcare, and technology.

    • Types of projects I have worked on include software development, building construction, and medical equipment installation.

    • I am adaptable and able to quickly learn about new industries and project types.

    • I have experience working on both small and lar

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join on third party payroll, join only on company payroll.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. About past experience
  • Q2. About technical knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Good experience for minimum experience candidates
Contribute & help others!
anonymous
You can choose to be anonymous

Rsb Infrastructure Interview FAQs

How many rounds are there in Rsb Infrastructure Senior Manager Project Management interview?
Rsb Infrastructure interview process usually has 3 rounds. The most common rounds in the Rsb Infrastructure interview process are Resume Shortlist, Group Discussion and Technical.
What are the top questions asked in Rsb Infrastructure Senior Manager Project Management interview?

Some of the top questions asked at the Rsb Infrastructure Senior Manager Project Management interview -

  1. Planning of project on MS off...read more
  2. Technical interview with direct...read more

Recently Viewed

SALARIES

VVDN Technologies

DESIGNATION

LIST OF COMPANIES

Red Carpet

Locations

REVIEWS

Sishutirtha

No Reviews

SALARIES

KS Hospital

No Salaries

REVIEWS

Ashok Metal

No Reviews

DESIGNATION

SALARIES

Saven Technologies

No Salaries

Tell us how to improve this page.

Rsb Infrastructure Senior Manager Project Management Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 344 Interviews
CBRE Interview Questions
4.2
 • 260 Interviews
NoBroker Interview Questions
3.2
 • 226 Interviews
Lodha Group Interview Questions
4.0
 • 123 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all

Rsb Infrastructure Senior Manager Project Management Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

1.0

Skill development

3.0

Work-life balance

3.0

Salary

1.0

Job security

4.0

Company culture

1.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Engineer
20 salaries
unlock blur

₹1.5 L/yr - ₹3.7 L/yr

Site Engineer
19 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Civil Site Engineer
17 salaries
unlock blur

₹1.1 L/yr - ₹4.2 L/yr

Safety Supervisor
10 salaries
unlock blur

₹2 L/yr - ₹4.4 L/yr

Asst Store
10 salaries
unlock blur

₹2.5 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Rsb Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

IRB Infrastructure

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview