The ASME B31.3 code is referred for hydrostatic testing and the ASME B31.1 code is referred for pneumatic testing.
ASME B31.3 code is the Process Piping Code and it provides guidelines for hydrostatic testing of process piping systems.
ASME B31.1 code is the Power Piping Code and it provides guidelines for pneumatic testing of power piping systems.
Hydrostatic testing involves filling the system with water or another suit...
The ASME code for repair work depends on the specific type of equipment or structure being repaired.
ASME Section VIII Division 1 is commonly used for the repair of pressure vessels.
ASME B31.3 is often referenced for the repair of piping systems.
ASME Section IX provides guidelines for the repair of welding procedures and qualifications.
ASME PCC-2 provides guidance for the repair of equipment and piping in various indust...
I appeared for an interview in Sep 2024, where I was asked the following questions.
As a Site Supervisor, I oversee daily operations, ensure safety compliance, and manage team performance on construction sites.
Coordinate daily activities and schedules for construction teams.
Ensure compliance with safety regulations, conducting regular safety audits.
Manage resources effectively, including materials and equipment.
Communicate with project managers and stakeholders to report progress.
Resolve on-site issue
I have over 5 years of experience as a Site Supervisor, managing various construction projects and ensuring safety and quality standards.
Managed a team of 20 workers on a commercial building project, completing it 2 weeks ahead of schedule.
Implemented safety protocols that reduced on-site accidents by 30%.
Coordinated with subcontractors and suppliers to ensure timely delivery of materials.
Conducted regular site inspect...
As a Site Supervisor, I managed daily operations, ensured safety compliance, and coordinated with teams for project success.
Oversaw daily site operations, ensuring projects were on schedule and within budget.
Conducted regular safety inspections, leading to a 20% reduction in workplace incidents.
Coordinated with subcontractors and suppliers to ensure timely delivery of materials.
Implemented quality control measures, res...
A pre-plan is a detailed strategy outlining tasks, resources, and timelines for a project before execution.
Identifies project scope and objectives, e.g., defining the goals of a construction project.
Allocates resources effectively, such as assigning team members to specific tasks.
Establishes timelines and milestones, e.g., setting deadlines for project phases.
Anticipates potential risks and develops mitigation strategi...
I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.
General test to skill your about maths reseaning with questions MCQ type.
I applied via Approached by Company and was interviewed in Nov 2022. There were 2 interview rounds.
Rotostat Services interview questions for popular designations
I applied via Walk-in and was interviewed before Jul 2023. There were 2 interview rounds.
Get interview-ready with Top Rotostat Services Interview Questions
I applied via Naukri.com and was interviewed in Jul 2022. There was 1 interview round.
The number of heat exchangers depends on the specific project requirements and design.
The number of heat exchangers can vary greatly depending on the size and complexity of the project.
It is common to have multiple heat exchangers in industrial plants and refineries.
The number of heat exchangers may also depend on the type of process being carried out.
For example, a petrochemical plant may have dozens of heat exchanger...
To check hydro test on a heat exchanger, perform visual inspection, pressure testing, and leak testing.
Perform a visual inspection of the heat exchanger for any visible damages or defects.
Conduct a pressure test by filling the heat exchanger with water or another suitable test medium and gradually increasing the pressure to the specified test pressure.
Monitor the pressure for a specified duration to ensure it remains s...
The number of gaskets in a heat exchanger varies depending on the design and size of the heat exchanger.
The number of gaskets in a heat exchanger can range from a few to hundreds, depending on the number of plates or tubes in the heat exchanger.
Plate heat exchangers typically have multiple gaskets between each plate, while shell and tube heat exchangers have gaskets between the tubes and the shell.
The number of gaskets...
I applied via Approached by Company and was interviewed in Feb 2022. There was 1 interview round.
WPS, ASME codes, welding consumables, material codes, and Hydrotest are essential components in ensuring quality and safety in welding processes.
WPS stands for Welding Procedure Specification and outlines the necessary parameters for a specific welding process.
ASME codes are standards set by the American Society of Mechanical Engineers to ensure quality and safety in engineering practices.
Welding consumables refer to m...
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2022. There were 2 interview rounds.
There are generally five steps in a risk assessment process.
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Evaluate current control measures
Implement additional control measures if necessary
Review and monitor the effectiveness of control measures
Top trending discussions
based on 11 interviews
Interview experience
based on 180 reviews
Rating in categories
Mechanical Engineer
35
salaries
| ₹2.4 L/yr - ₹9.2 L/yr |
Safety Officer
28
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Mechanical Maintenance Engineer
23
salaries
| ₹2.5 L/yr - ₹5.7 L/yr |
Mechanical Supervisor
16
salaries
| ₹2.9 L/yr - ₹7 L/yr |
Supervisor
15
salaries
| ₹2 L/yr - ₹6.5 L/yr |
Trelleborg
Case New-Holland Construction Equipment India
MITA
PMT Machines