i
Rohanta Infra Solutions
Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Apr 2020. There were 2 interview rounds.
Construction and debris waste can be reused through recycling, repurposing, and upcycling.
Implement a waste management plan to separate and recycle materials like concrete, wood, and metal.
Explore opportunities for repurposing materials in future construction projects.
Consider upcycling techniques to transform waste materials into new products or building materials.
Collaborate with local recycling facilities and organi...
Estimating RCC structures involves calculating the quantity of materials like concrete and steel needed for construction.
Estimate the quantity of concrete required based on the dimensions of the structure and the specified mix ratio.
Calculate the quantity of steel reinforcement needed based on the structural design and load requirements.
Consider factors like formwork, labor costs, and equipment expenses when estimating
I applied via Recruitment Consulltant and was interviewed in Jan 2021. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Project Manager
4
salaries
| ₹15 L/yr - ₹20 L/yr |
Senior Project Manager
4
salaries
| ₹10.1 L/yr - ₹13.8 L/yr |
Accountant
3
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Project Coordinator
3
salaries
| ₹3.8 L/yr - ₹5.8 L/yr |
Waste Management Holdings
Veolia
Toshiba Water Solutions
Doshion