I applied via Approached by Company and was interviewed before Mar 2023. There were 2 interview rounds.
What is vision and how you fruitful forthe company if choosen. future challenges, stratgies, expansion of footprint etc
In depth knowledge of technical issues and challenges to face
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
I appeared for an interview in Sep 2024.
Amazing aptitute test with knowledge of all aspects of the industry
Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.
How to handle team. How you will give satisfactory response to clients
Tackling clients involves building relationships, understanding their needs, and providing excellent customer service.
Listen actively to clients to understand their needs and concerns
Communicate clearly and effectively to address any issues or questions
Provide personalized solutions and excellent customer service to build trust and loyalty
Follow up with clients to ensure satisfaction and address any further needs
Handle...
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jul 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Field Engineer
62
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Project Engineer
62
salaries
| ₹2.3 L/yr - ₹5.2 L/yr |
Deputy Team Leader
52
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Assistant Manager Finance
44
salaries
| ₹2.7 L/yr - ₹6.9 L/yr |
Field Supervisor
42
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem