Filter interviews by
I applied via Job Portal and was interviewed before Mar 2023. There were 2 interview rounds.
Top trending discussions
I applied via LinkedIn and was interviewed in Oct 2024. There were 2 interview rounds.
Logical,reasoning and blood relationship related questions were given for the test
PLC stands for Programmable Logic Controller, used for industrial automation. It is different from other microcontrollers in terms of design, functionality, and applications.
PLCs are specifically designed for industrial automation tasks, such as controlling machinery on a factory assembly line.
PLCs are more robust and reliable than general-purpose microcontrollers, as they are built to withstand harsh industrial enviro...
The main method is static in Java because it needs to be called by the JVM without creating an instance of the class.
Static methods can be called without creating an instance of the class.
The main method is the entry point of a Java program, so it needs to be accessible without creating objects.
Having the main method as static ensures that it can be called by the JVM before any objects are created.
Overloading construction is possible in programming by defining multiple functions with the same name but different parameters.
In programming, overloading construction refers to defining multiple functions with the same name but different parameters.
The compiler determines which function to call based on the number and types of arguments passed to it.
For example, you can have multiple functions named 'calculate' that a...
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed in Nov 2023. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There were 3 interview rounds.
Smoke testing is a quick test to check if the basic functionalities of the software are working, while sanity testing is a subset of regression testing to ensure that specific functionalities are working after changes.
Smoke testing is performed to ensure that the critical functionalities of the software are working fine before proceeding with detailed testing.
Sanity testing is a focused testing to verify specific areas...
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
I was interviewed before Aug 2021.
Communication protocols are a set of rules that govern the exchange of data between devices or systems.
Protocols define the format, timing, sequencing, and error checking of data transmission.
Examples include TCP/IP, HTTP, FTP, SMTP, and Bluetooth.
Protocols can be classified as wired or wireless, serial or parallel, synchronous or asynchronous.
They are essential for ensuring interoperability and reliable communication ...
I have worked as a Test Engineer in multiple roles and projects.
Tested software applications for functionality, performance, and reliability.
Developed and executed test plans, test cases, and test scripts.
Identified and reported software defects, and worked with developers to resolve them.
Collaborated with cross-functional teams to ensure quality standards were met.
Participated in requirement analysis and design review...
I applied via Recruitment Consulltant and was interviewed before Jun 2021. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Project Engineer
610
salaries
| ₹4.2 L/yr - ₹15 L/yr |
Software Engineer
172
salaries
| ₹5.2 L/yr - ₹19 L/yr |
Business Process Analyst
123
salaries
| ₹4.8 L/yr - ₹13 L/yr |
Senior Project Engineer
121
salaries
| ₹8.4 L/yr - ₹24 L/yr |
Senior Software Engineer
106
salaries
| ₹11 L/yr - ₹38 L/yr |
Siemens
ABB
Schneider Electric
Honeywell Automation