I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
Water pressure can be checked using a pressure gauge or by observing the flow rate.
Use a pressure gauge to measure the water pressure at a specific point in the system
Observe the flow rate of water from a faucet or showerhead to determine if the pressure is too low
Check for leaks or blockages in the system that may be affecting the pressure
Consult with a plumber or water utility company if the pressure is consistently
There are several types of pipes used in plumbing.
Copper pipes
PVC pipes
PEX pipes
Galvanized steel pipes
Cast iron pipes
Brass pipes
Stainless steel pipes
NRV stands for Net Realizable Value and is used to determine the value of inventory or assets that can be sold.
NRV is calculated by subtracting the estimated costs of completion and disposal from the estimated selling price.
It is used to determine the value of inventory or assets that can be sold.
NRV is important for financial reporting and tax purposes.
For example, if a company has inventory worth $10,000 but it will
There are four types of sprinkler systems: wet pipe, dry pipe, pre-action, and deluge.
Wet pipe sprinkler system is the most common type and is filled with water.
Dry pipe sprinkler system is filled with pressurized air or nitrogen and water is released when the sprinkler head is activated.
Pre-action sprinkler system is a combination of wet and dry pipe systems and requires two triggers to activate.
Deluge sprinkler syste...
There are two types of fire pumps: centrifugal and positive displacement.
Centrifugal pumps use a rotating impeller to create a flow of water, while positive displacement pumps use a piston or diaphragm to move water.
Centrifugal pumps are more commonly used in fire protection systems.
Positive displacement pumps are typically used in high-rise buildings or where water pressure is low.
Examples of centrifugal pumps include...
The fire system is a set of equipment and procedures designed to detect and extinguish fires in a building.
The fire system includes fire alarms, sprinklers, fire extinguishers, and emergency lighting.
It is important to regularly test and maintain the fire system to ensure it is functioning properly.
The fire system should be clearly marked and easily accessible in case of an emergency.
Training on the proper use of the f...
Check for fire alarm system in the accident location by following standard procedures.
Check for visible fire alarm system devices such as pull stations, strobe lights, and horns.
Ask witnesses or occupants of the building if there is a fire alarm system in place.
Consult the building's floor plan or fire safety plan to locate the fire alarm system.
Use a handheld fire alarm system detector to locate the system if necessar
A booster pump increases water pressure in a system, while a jockey pump maintains pressure within a certain range.
Booster pumps are used to increase water pressure in a system, such as in a high-rise building or a fire sprinkler system.
Jockey pumps are used to maintain pressure within a certain range, typically in a fire sprinkler system.
Booster pumps are typically larger and more powerful than jockey pumps.
Jockey pum...
Fire shaft size depends on the building height and occupancy type.
The size of the fire shaft should be determined by the building code and regulations.
The height of the building and the occupancy type will determine the minimum size of the fire shaft.
The fire shaft should be large enough to accommodate firefighting equipment and personnel.
The fire shaft should also be designed to prevent the spread of smoke and fire.
Ex...
Angel supports various types of plumbing and fire pipe lines including hangers, clamps, and brackets.
Angel supports hangers for vertical pipe lines
Angel supports clamps for horizontal pipe lines
Angel supports brackets for fire pipe lines
Angel also provides custom solutions for unique pipe support needs
PVC and GI pipes differ in material, cost, durability, and usage.
PVC pipes are made of plastic while GI pipes are made of galvanized iron.
PVC pipes are cheaper than GI pipes.
GI pipes are more durable and can withstand higher pressure than PVC pipes.
PVC pipes are commonly used for water supply and drainage systems while GI pipes are used for gas and oil pipelines.
PVC pipes are easier to install and maintain than GI pipe
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 3 interview rounds.
Had discussion with architect team and Hr
Top trending discussions
posted on 5 Jan 2025
I applied via Job Portal and was interviewed in Dec 2024. There was 1 interview round.
posted on 18 Nov 2024
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I prioritize building trust, understanding client needs, providing personalized service, and maintaining open communication.
Building trust through transparency and honesty
Understanding client needs and preferences
Providing personalized service tailored to each client
Maintaining open communication throughout the process
posted on 16 Dec 2023
I applied via LinkedIn and was interviewed in Nov 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Aug 2024. There was 1 interview round.
The road map of a railway system outlines the network of tracks, stations, and connections for trains to travel on.
The road map includes all the tracks, stations, and junctions in the railway system
It shows the routes that trains can take to reach different destinations
The road map may also include information on train schedules, stops, and connections
Railway companies often update their road maps to reflect changes in
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in May 2024. There were 4 interview rounds.
Experienced executive accountant with a strong track record in financial management and strategic planning.
Over 10 years of experience in accounting and finance
Expertise in budgeting, forecasting, and financial analysis
Proven ability to streamline processes and improve efficiency
Strong communication and leadership skills
Previously managed a team of accountants at XYZ Corporation
posted on 7 Nov 2024
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
based on 85 reviews
Rating in categories
Civil Site Engineer
20
salaries
| ₹3 L/yr - ₹3.8 L/yr |
Site Engineer
16
salaries
| ₹1.7 L/yr - ₹4.5 L/yr |
Assistant Manager
12
salaries
| ₹4.2 L/yr - ₹6.6 L/yr |
Senior Engineer
12
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Senior Executive
10
salaries
| ₹1.5 L/yr - ₹5 L/yr |
DLF
Godrej Properties
Sobha
Prestige Group