i
Renom Energy
Services
Filter interviews by
Power flow & Control flow of Enercon WEC involves the generation of electricity from wind energy and the management of power output.
Power flow in Enercon WEC involves converting kinetic energy from wind into electrical power through the rotation of the turbine blades.
Control flow includes monitoring wind speed, adjusting blade pitch angle, and regulating generator output to optimize power generation.
Enercon WECs u...
Power can be converted and matched to grid parameters using power converters and control systems.
Use power converters such as inverters to convert power from DC to AC or vice versa.
Implement control systems to ensure the converted power matches the grid parameters.
Adjust parameters such as voltage, frequency, and phase angle to match the grid requirements.
Utilize communication protocols like Modbus or DNP3 for gri...
The pitch system in engineering controls the angle of the blades on a wind turbine or aircraft to optimize performance.
Pitch system adjusts blade angle to control speed and power output
Can be controlled manually or automatically based on wind conditions
Diagram should show blades connected to pitch system and control mechanism
The performance of a turbine is evaluated by measuring key parameters such as efficiency, power output, and heat rate.
Efficiency is calculated by dividing the actual power output by the theoretical power output.
Power output is measured in kilowatts or megawatts.
Heat rate is the amount of fuel required to produce a unit of electricity.
Performance can also be evaluated by monitoring vibration levels, temperature, an...
Enercon Turbines have different models based on size, capacity, and technology.
E-48/800 kW - small size, suitable for low wind speed areas
E-82/2 MW - medium size, suitable for moderate wind speed areas
E-126/7.5 MW - large size, suitable for high wind speed areas
Different models have varying rotor diameters, hub heights, and power outputs
To improve PLF, focus on optimizing equipment performance, reducing downtime, and increasing operational efficiency.
Regular maintenance and servicing of equipment to ensure optimal performance
Implementing predictive maintenance techniques to reduce downtime
Investing in automation and technology to increase operational efficiency
Training staff on best practices and efficient operation of equipment
Monitoring and ana...
Excitation starts by applying a voltage to the field winding of the generator.
Excitation starts by applying a voltage to the field winding of the generator.
This voltage creates a magnetic field in the generator's rotor.
The magnetic field induces a voltage in the stator windings, which generates electricity.
Excitation can be achieved through various methods such as self-excitation, separate excitation, or permanent...
The Present LPA refers to the current annual salary of the individual.
Present LPA stands for Present Last Payable Amount.
It is the current annual salary of the individual.
It is important for employers to know the Present LPA of potential employees to determine salary expectations.
Candidates can negotiate their salary based on their Present LPA.
The expected LPA (Lakhs Per Annum) is the average annual salary that an engineer can expect to earn.
The expected LPA can vary based on factors such as experience, education, industry, and location.
For example, a fresh graduate engineer may have an expected LPA of 3-6 lakhs, while a senior engineer with years of experience may have an expected LPA of 10-20 lakhs.
Engineers working in industries like IT or oil and ga...
I have solved errors related to software bugs, hardware malfunctions, calibration issues, and communication failures on the machine.
Software bugs: Debugging code to fix issues with program logic or functionality.
Hardware malfunctions: Repairing or replacing faulty components to restore machine operation.
Calibration issues: Adjusting settings to ensure accurate measurements or performance.
Communication failures: Tr...
The Pitch system in Gearless technology controls the angle of the blades to optimize energy production.
Pitch system adjusts the angle of the blades based on wind conditions to maximize energy output.
It helps in protecting the turbine from damage during high wind speeds by adjusting the blade angle.
Pitch system can be controlled manually or automatically depending on the turbine design.
Examples of Pitch system in action...
Excitation starts by applying a voltage to the field winding of the generator.
Excitation starts by applying a voltage to the field winding of the generator.
This voltage creates a magnetic field in the generator's rotor.
The magnetic field induces a voltage in the stator windings, which generates electricity.
Excitation can be achieved through various methods such as self-excitation, separate excitation, or permanent magn...
Power flow & Control flow of Enercon WEC involves the generation of electricity from wind energy and the management of power output.
Power flow in Enercon WEC involves converting kinetic energy from wind into electrical power through the rotation of the turbine blades.
Control flow includes monitoring wind speed, adjusting blade pitch angle, and regulating generator output to optimize power generation.
Enercon WECs use ad...
Enercon Turbines have different models based on size, capacity, and technology.
E-48/800 kW - small size, suitable for low wind speed areas
E-82/2 MW - medium size, suitable for moderate wind speed areas
E-126/7.5 MW - large size, suitable for high wind speed areas
Different models have varying rotor diameters, hub heights, and power outputs
The E48 turbine uses optical communication for data transmission.
Optical communication involves using light to transmit data instead of electrical signals.
Fiber optic cables are commonly used in optical communication for their high bandwidth and low interference.
Optical communication in the E48 turbine may be used for monitoring and controlling various parameters such as temperature, pressure, and speed.
The pitch system in engineering controls the angle of the blades on a wind turbine or aircraft to optimize performance.
Pitch system adjusts blade angle to control speed and power output
Can be controlled manually or automatically based on wind conditions
Diagram should show blades connected to pitch system and control mechanism
Power can be converted and matched to grid parameters using power converters and control systems.
Use power converters such as inverters to convert power from DC to AC or vice versa.
Implement control systems to ensure the converted power matches the grid parameters.
Adjust parameters such as voltage, frequency, and phase angle to match the grid requirements.
Utilize communication protocols like Modbus or DNP3 for grid int...
The performance of a turbine is evaluated by measuring key parameters such as efficiency, power output, and heat rate.
Efficiency is calculated by dividing the actual power output by the theoretical power output.
Power output is measured in kilowatts or megawatts.
Heat rate is the amount of fuel required to produce a unit of electricity.
Performance can also be evaluated by monitoring vibration levels, temperature, and pre...
To improve PLF, focus on optimizing equipment performance, reducing downtime, and increasing operational efficiency.
Regular maintenance and servicing of equipment to ensure optimal performance
Implementing predictive maintenance techniques to reduce downtime
Investing in automation and technology to increase operational efficiency
Training staff on best practices and efficient operation of equipment
Monitoring and analyzin...
I am currently located in San Francisco, California, a vibrant city known for its iconic Golden Gate Bridge and diverse culture.
San Francisco is famous for its hilly landscape and Victorian architecture.
The city is home to tech giants like Google and Facebook, located in nearby Silicon Valley.
Cultural landmarks include Alcatraz Island and Fisherman's Wharf.
The climate is characterized by cool summers and fog, especiall...
The Present LPA refers to the current annual salary of the individual.
Present LPA stands for Present Last Payable Amount.
It is the current annual salary of the individual.
It is important for employers to know the Present LPA of potential employees to determine salary expectations.
Candidates can negotiate their salary based on their Present LPA.
The expected LPA (Lakhs Per Annum) is the average annual salary that an engineer can expect to earn.
The expected LPA can vary based on factors such as experience, education, industry, and location.
For example, a fresh graduate engineer may have an expected LPA of 3-6 lakhs, while a senior engineer with years of experience may have an expected LPA of 10-20 lakhs.
Engineers working in industries like IT or oil and gas ten...
I applied via Job Portal and was interviewed in Nov 2022. There were 4 interview rounds.
I maintained a positive attitude and worked efficiently in a collaborative environment.
I was always punctual and ready to work
I communicated effectively with my team members and superiors
I followed safety protocols and maintained a clean work area
I adapted quickly to changes in the work environment
I took initiative and was proactive in problem-solving
Example: During a construction project, I noticed a potential safety ...
I applied via LinkedIn and was interviewed before Jan 2023. There was 1 interview round.
I have solved errors related to software bugs, hardware malfunctions, calibration issues, and communication failures on the machine.
Software bugs: Debugging code to fix issues with program logic or functionality.
Hardware malfunctions: Repairing or replacing faulty components to restore machine operation.
Calibration issues: Adjusting settings to ensure accurate measurements or performance.
Communication failures: Trouble...
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Our plant follows strict safety protocols, efficient workflow procedures, and regular maintenance schedules.
We have daily safety meetings to discuss potential hazards and ensure compliance with safety regulations.
Our workflow procedures are designed to maximize efficiency and productivity, with regular reviews to identify areas for improvement.
We have a comprehensive maintenance schedule in place to prevent breakdowns ...
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I appeared for an interview in May 2025, where I was asked the following questions.
In my current role, I lead engineering projects, mentor junior engineers, and ensure high-quality deliverables.
Led a team of 5 engineers in developing a scalable web application, improving performance by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Mentored junior engineers, helping them improve their coding skills and understanding of best practices.
Collaborated with cross...
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
Experienced Senior Engineer with a strong background in software development, project management, and team leadership.
Over 10 years of experience in software engineering, focusing on full-stack development.
Led a team of 5 engineers in developing a scalable e-commerce platform, increasing sales by 30%.
Implemented Agile methodologies, resulting in a 25% reduction in project delivery time.
Worked on cross-functional teams ...
based on 5 interview experiences
Difficulty level
Duration
based on 38 reviews
Rating in categories
Engineer
159
salaries
| ₹3.4 L/yr - ₹7 L/yr |
Junior Engineer
127
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Senior Engineer
83
salaries
| ₹4 L/yr - ₹7.4 L/yr |
Electrical Engineer
83
salaries
| ₹3.4 L/yr - ₹6.2 L/yr |
Assistant Manager
31
salaries
| ₹4.7 L/yr - ₹10.4 L/yr |
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
Ramky Infrastructure
B.L. Kashyap & Sons