The Pitch system in Gearless technology controls the angle of the blades to optimize energy production.
Pitch system adjusts the angle of the blades based on wind conditions to maximize energy output.
It helps in protecting the turbine from damage during high wind speeds by adjusting the blade angle.
Pitch system can be controlled manually or automatically depending on the turbine design.
Examples of Pitch system in action...
Excitation starts by applying a voltage to the field winding of the generator.
Excitation starts by applying a voltage to the field winding of the generator.
This voltage creates a magnetic field in the generator's rotor.
The magnetic field induces a voltage in the stator windings, which generates electricity.
Excitation can be achieved through various methods such as self-excitation, separate excitation, or permanent magn
Power flow & Control flow of Enercon WEC involves the generation of electricity from wind energy and the management of power output.
Power flow in Enercon WEC involves converting kinetic energy from wind into electrical power through the rotation of the turbine blades.
Control flow includes monitoring wind speed, adjusting blade pitch angle, and regulating generator output to optimize power generation.
Enercon WECs use ad...
Enercon Turbines have different models based on size, capacity, and technology.
E-48/800 kW - small size, suitable for low wind speed areas
E-82/2 MW - medium size, suitable for moderate wind speed areas
E-126/7.5 MW - large size, suitable for high wind speed areas
Different models have varying rotor diameters, hub heights, and power outputs
The E48 turbine uses optical communication for data transmission.
Optical communication involves using light to transmit data instead of electrical signals.
Fiber optic cables are commonly used in optical communication for their high bandwidth and low interference.
Optical communication in the E48 turbine may be used for monitoring and controlling various parameters such as temperature, pressure, and speed.
The pitch system in engineering controls the angle of the blades on a wind turbine or aircraft to optimize performance.
Pitch system adjusts blade angle to control speed and power output
Can be controlled manually or automatically based on wind conditions
Diagram should show blades connected to pitch system and control mechanism
Power can be converted and matched to grid parameters using power converters and control systems.
Use power converters such as inverters to convert power from DC to AC or vice versa.
Implement control systems to ensure the converted power matches the grid parameters.
Adjust parameters such as voltage, frequency, and phase angle to match the grid requirements.
Utilize communication protocols like Modbus or DNP3 for grid int...
The performance of a turbine is evaluated by measuring key parameters such as efficiency, power output, and heat rate.
Efficiency is calculated by dividing the actual power output by the theoretical power output.
Power output is measured in kilowatts or megawatts.
Heat rate is the amount of fuel required to produce a unit of electricity.
Performance can also be evaluated by monitoring vibration levels, temperature, and pre...
To improve PLF, focus on optimizing equipment performance, reducing downtime, and increasing operational efficiency.
Regular maintenance and servicing of equipment to ensure optimal performance
Implementing predictive maintenance techniques to reduce downtime
Investing in automation and technology to increase operational efficiency
Training staff on best practices and efficient operation of equipment
Monitoring and analyzin
The Present LPA refers to the current annual salary of the individual.
Present LPA stands for Present Last Payable Amount.
It is the current annual salary of the individual.
It is important for employers to know the Present LPA of potential employees to determine salary expectations.
Candidates can negotiate their salary based on their Present LPA.
The expected LPA (Lakhs Per Annum) is the average annual salary that an engineer can expect to earn.
The expected LPA can vary based on factors such as experience, education, industry, and location.
For example, a fresh graduate engineer may have an expected LPA of 3-6 lakhs, while a senior engineer with years of experience may have an expected LPA of 10-20 lakhs.
Engineers working in industries like IT or oil and gas ten...
I applied via Job Portal and was interviewed in Nov 2022. There were 4 interview rounds.
I maintained a positive attitude and worked efficiently in a collaborative environment.
I was always punctual and ready to work
I communicated effectively with my team members and superiors
I followed safety protocols and maintained a clean work area
I adapted quickly to changes in the work environment
I took initiative and was proactive in problem-solving
Example: During a construction project, I noticed a potential safety ...
I applied via LinkedIn and was interviewed before Jan 2023. There was 1 interview round.
I have solved errors related to software bugs, hardware malfunctions, calibration issues, and communication failures on the machine.
Software bugs: Debugging code to fix issues with program logic or functionality.
Hardware malfunctions: Repairing or replacing faulty components to restore machine operation.
Calibration issues: Adjusting settings to ensure accurate measurements or performance.
Communication failures: Trouble...
I applied via Company Website and was interviewed before Dec 2022. There were 3 interview rounds.
Renom Energy Services interview questions for designations
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
Our plant follows strict safety protocols, efficient workflow procedures, and regular maintenance schedules.
We have daily safety meetings to discuss potential hazards and ensure compliance with safety regulations.
Our workflow procedures are designed to maximize efficiency and productivity, with regular reviews to identify areas for improvement.
We have a comprehensive maintenance schedule in place to prevent breakdowns ...
Yes, I have experience working under pressure and have developed coping mechanisms.
I have worked on projects with tight deadlines and high stakes.
I prioritize tasks and communicate effectively with team members to ensure smooth operations.
I practice stress-reducing techniques such as meditation and exercise.
I remain calm and focused in high-pressure situations.
For example, during a project for a major client, we encoun...
based on 33 reviews
Rating in categories
Engineer
137
salaries
| ₹3 L/yr - ₹7 L/yr |
Junior Engineer
115
salaries
| ₹1.6 L/yr - ₹6.2 L/yr |
Electrical Engineer
90
salaries
| ₹3.2 L/yr - ₹6.2 L/yr |
Senior Engineer
69
salaries
| ₹4 L/yr - ₹7.4 L/yr |
Assistant Manager
27
salaries
| ₹4 L/yr - ₹9.5 L/yr |