Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ReNew Team. If you also belong to the team, you can get access from here

ReNew Verified Tick

Compare button icon Compare button icon Compare
4.2

based on 1k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

ReNew Engineer Interview Questions and Answers

Updated 8 Mar 2021

ReNew Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 8 Mar 2021

I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How to trouble shoot inverters , scbs, transformer, breakers
  • Ans. 

    To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:

    • Check for loose connections and wiring

    • Inspect for physical damage or wear and tear

    • Use a multimeter to test voltage and current

    • Check for proper grounding

    • Refer to manufacturer's manual for specific troubleshooting steps

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep to know

Engineer Jobs at ReNew

View all

Interview questions from similar companies

Engineer Interview Questions & Answers

Vestas user image latest advance guruji 2018

posted on 8 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Why nitrogen gas uses in accumulator?
  • Ans. 

    Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.

    • Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.

    • It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.

    • Nitrogen gas has a stable temperature range, allowi...

  • Answered by AI
  • Q2. Why accumulator is used in WTG
  • Ans. 

    Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.

    • Accumulator helps in smoothing out the power output from the wind turbine.

    • It allows for energy storage when the demand is low and release of stored energy when the demand is high.

    • Accumulators can also help in providing backup power during periods of low wind.

    • Examples of accumulators used in WTG include batteries, flywheels, an

  • Answered by AI
  • Q3. DGR related questions like PLF ,LPF
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to improve Performance Ratio
  • Ans. 

    To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.

    • Optimize system design and operation to increase efficiency

    • Reduce losses through better maintenance and monitoring

    • Maximize output by utilizing advanced technologies and techniques

  • Answered by AI
  • Q2. What is Capacity utilization factor
  • Ans. 

    Capacity utilization factor is a measure of how much of a system's capacity is being utilized.

    • Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.

    • It is often expressed as a percentage.

    • A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.

    • For example, if a factory has a maximum output of ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What iS GHI & GTI , GPR
  • Ans. 

    GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.

    • GHI is a measure of the total heat input to a system or appliance.

    • GTI is a measure of the efficiency of converting input energy into useful output energy.

    • GPR is a measure of the rate at which a system or appliance produces a certain output.

  • Answered by AI
  • Q2. How to improve the plant PR
  • Ans. 

    Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.

    • Enhance communication with stakeholders through regular updates and transparent information sharing.

    • Engage with the local community through events, workshops, and outreach programs to build positive relationships.

    • Implement sustainable practices and showcase environmental initiatives to improve public perception.

    • Utilize...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. HR round for basic information for your mentioned CV.
  • Q2. Salary discussion
  • Q3. Why you change the current organisations?
Round 3 - Technical 

(2 Questions)

  • Q1. Technical Round Depends on your work experiences.
  • Q2. Boiler operation
Round 4 - HR 

(1 Question)

  • Q1. For your salary and benefits notice period etc

Interview Questionnaire 

2 Questions

  • Q1. Why share with you because your company not conducted any interview.
  • Q2. First you conduct interview with any company then you ask question regarding interview

Interview Preparation Tips

Interview preparation tips for other job seekers - This company not conduct any interview please away from this company .

Interview Questionnaire 

2 Questions

  • Q1. Tell me about your self
  • Q2. Time maintenance to your project

I applied via LinkedIn and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How old are you
  • Q2. How many years do you work here

Interview Preparation Tips

Interview preparation tips for other job seekers - Bold Answers expected from interview panel
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Questions related to past projects and some technical questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

OHT Detail & reinforcement deatail

Round 2 - HR 

(2 Questions)

  • Q1. Document deatils
  • Q2. Where are you working

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good

Interview Questionnaire 

2 Questions

  • Q1. Pretty easy questions based on power plant.
  • Q2. I was asked to explain Rankine Cycle.
  • Ans. 

    Rankine Cycle is a thermodynamic cycle used in steam power plants to convert heat energy into mechanical work.

    • Rankine Cycle is a theoretical cycle that consists of four processes: compression, heat addition, expansion, and heat rejection.

    • It is commonly used in steam power plants to generate electricity.

    • The cycle begins with the compression of a working fluid (usually water) in a pump.

    • The compressed fluid then enters a ...

  • Answered by AI

Interview Preparation Tips

Round: Test
Experience: Aptitude Test & Basic Engineering Questions

ReNew Interview FAQs

How to prepare for ReNew Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ReNew. The most common topics and skills that interviewers at ReNew expect are Renewable Energy, Solar Energy, Monitoring, Engineering and Power Sector.

Tell us how to improve this page.

People are getting interviews through

based on 1 ReNew interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
ReNew Engineer Salary
based on 263 salaries
₹2.9 L/yr - ₹7.8 L/yr
At par with the average Engineer Salary in India
View more details

ReNew Engineer Reviews and Ratings

based on 52 reviews

4.4/5

Rating in categories

4.5

Skill development

4.4

Work-Life balance

4.3

Salary & Benefits

4.6

Job Security

4.5

Company culture

3.7

Promotions/Appraisal

4.2

Work Satisfaction

Explore 52 Reviews and Ratings
Engineer- Wind Engineering

Kolkata,

Mumbai

+5

0-4 Yrs

Not Disclosed

Engineer- Wind Resource Assessment

Kolkata,

Mumbai

+5

3-6 Yrs

₹ 3-7.6 LPA

Explore more jobs
Assistant Manager
394 salaries
unlock blur

₹5.6 L/yr - ₹15.4 L/yr

Senior Engineer
341 salaries
unlock blur

₹4.4 L/yr - ₹10.7 L/yr

Deputy Manager
307 salaries
unlock blur

₹7.5 L/yr - ₹25.5 L/yr

Engineer
264 salaries
unlock blur

₹2.9 L/yr - ₹7.8 L/yr

Manager
177 salaries
unlock blur

₹11.5 L/yr - ₹26 L/yr

Explore more salaries
Compare ReNew with

Adani Green Energy

4.1
Compare

Azure Power

3.9
Compare

Hero Future Energies

4.4
Compare

Acme Cleantech Solutions

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview