i
ReNew
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed in Feb 2021. There were 3 interview rounds.
To troubleshoot inverters, SCBs, transformers, and breakers, follow these pointers:
Check for loose connections and wiring
Inspect for physical damage or wear and tear
Use a multimeter to test voltage and current
Check for proper grounding
Refer to manufacturer's manual for specific troubleshooting steps
Top trending discussions
Nitrogen gas is used in accumulators due to its inert properties and ability to maintain pressure for extended periods of time.
Nitrogen gas is inert, meaning it does not react with other substances, making it ideal for maintaining pressure without causing corrosion or contamination.
It is also non-flammable, which reduces the risk of fire hazards in accumulator systems.
Nitrogen gas has a stable temperature range, allowi...
Accumulator is used in WTG to store excess energy generated by the wind turbine for later use.
Accumulator helps in smoothing out the power output from the wind turbine.
It allows for energy storage when the demand is low and release of stored energy when the demand is high.
Accumulators can also help in providing backup power during periods of low wind.
Examples of accumulators used in WTG include batteries, flywheels, an
To improve Performance Ratio, focus on optimizing system efficiency, reducing losses, and maximizing output.
Optimize system design and operation to increase efficiency
Reduce losses through better maintenance and monitoring
Maximize output by utilizing advanced technologies and techniques
Capacity utilization factor is a measure of how much of a system's capacity is being utilized.
Capacity utilization factor is calculated by dividing the actual output by the maximum possible output.
It is often expressed as a percentage.
A high capacity utilization factor indicates efficient use of resources, while a low factor may suggest underutilization or inefficiency.
For example, if a factory has a maximum output of ...
GHI stands for Gross Heating Input, GTI stands for Gross Thermal Efficiency, and GPR stands for Gross Production Rate.
GHI is a measure of the total heat input to a system or appliance.
GTI is a measure of the efficiency of converting input energy into useful output energy.
GPR is a measure of the rate at which a system or appliance produces a certain output.
Improving plant PR involves enhancing communication, community engagement, and sustainability efforts.
Enhance communication with stakeholders through regular updates and transparent information sharing.
Engage with the local community through events, workshops, and outreach programs to build positive relationships.
Implement sustainable practices and showcase environmental initiatives to improve public perception.
Utilize...
I applied via LinkedIn and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2024. There was 1 interview round.
I applied via Job Portal and was interviewed in Nov 2023. There were 2 interview rounds.
OHT Detail & reinforcement deatail
Rankine Cycle is a thermodynamic cycle used in steam power plants to convert heat energy into mechanical work.
Rankine Cycle is a theoretical cycle that consists of four processes: compression, heat addition, expansion, and heat rejection.
It is commonly used in steam power plants to generate electricity.
The cycle begins with the compression of a working fluid (usually water) in a pump.
The compressed fluid then enters a ...
based on 52 reviews
Rating in categories
Assistant Manager
394
salaries
| ₹5.6 L/yr - ₹15.4 L/yr |
Senior Engineer
341
salaries
| ₹4.4 L/yr - ₹10.7 L/yr |
Deputy Manager
307
salaries
| ₹7.5 L/yr - ₹25.5 L/yr |
Engineer
264
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Manager
177
salaries
| ₹11.5 L/yr - ₹26 L/yr |
Adani Green Energy
Azure Power
Hero Future Energies
Acme Cleantech Solutions