Erection and testing of transformers involves careful installation, connection, and verification of performance parameters.
1. Site Preparation: Ensure the foundation is level and capable of supporting the transformer weight.
2. Unloading: Use cranes or forklifts to safely unload the transformer from transport vehicles.
3. Positioning: Align the transformer with the designated installation area, ensuring proper clearance ...
Erecting a power panel involves careful planning, installation, and safety measures to ensure proper functionality and compliance.
1. Site Preparation: Ensure the installation site is clean, level, and free from obstructions.
2. Equipment Check: Verify that all components of the power panel are present and undamaged.
3. Mounting: Securely mount the panel to a wall or a dedicated structure using appropriate fasteners.
4. El...
Cable laying involves planning, installation, and securing cables for electrical systems, ensuring safety and efficiency.
Plan the route: Assess the area for obstacles and determine the most efficient path for the cables.
Select appropriate cables: Choose cables based on voltage, current capacity, and environmental conditions.
Use proper tools: Employ tools like cable pullers, trenchers, and splicing kits for effective in...
Generator rotor tests ensure the rotor's integrity and performance, crucial for reliable generator operation.
Visual Inspection: Check for physical damage, cracks, or corrosion on the rotor surface.
Insulation Resistance Test: Measure insulation resistance between rotor windings and ground using a megohmmeter.
Winding Resistance Test: Use a micro-ohmmeter to measure the resistance of rotor windings to ensure they are with...
Testing and commissioning of HT & LT panels ensure safety, reliability, and performance of electrical systems.
Visual Inspection: Check for physical damage, proper labeling, and cleanliness of the panel.
Insulation Resistance Testing: Use a megohmmeter to measure insulation resistance to ensure safety.
Functional Testing: Verify the operation of circuit breakers, relays, and other protective devices.
Voltage and Curren...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
What people are saying about Reliance Industries
I appeared for an interview before Feb 2024.
Electrical Equipment & sld of the compaany
I am a dedicated Electrical Engineer with a strong background in designing and implementing electrical systems.
Graduated with a degree in Electrical Engineering from XYZ University
Experienced in designing and testing electrical systems for commercial buildings
Proficient in using CAD software for schematic design
Strong problem-solving skills and attention to detail
Completed internships at ABC Company and gained hands-on
Reliance Industries interview questions for designations
I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2018. There were 5 interview rounds.
I applied via Company Website and was interviewed in Apr 2022. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
based on 4 interviews
2 Interview rounds
based on 111 reviews
Rating in categories
Manager
3.4k
salaries
| ₹5.4 L/yr - ₹19.4 L/yr |
Field Executive
2.7k
salaries
| ₹1.8 L/yr - ₹9.4 L/yr |
Assistant Manager
2.7k
salaries
| ₹1.8 L/yr - ₹10 L/yr |
Senior Manager
2.5k
salaries
| ₹8.1 L/yr - ₹28 L/yr |
Deputy Manager
1.2k
salaries
| ₹3.5 L/yr - ₹14 L/yr |
Indian Oil Corporation
Shell
Bharat Petroleum
Hindustan Petroleum