Upload Button Icon Add office photos

Filter interviews by

Reecomps Teleservices Project Engineer Interview Questions and Answers

Updated 2 Mar 2022

Reecomps Teleservices Project Engineer Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Project. Coordination
  • Q2. How is integrate BTS site
  • Ans. 

    Integrating BTS site involves connecting the site to the network and configuring it to communicate with the core network.

    • Connect the site to the network using fiber optic or microwave links

    • Configure the site to communicate with the core network using IP addresses and routing protocols

    • Install and configure the necessary hardware and software components such as base station controllers and transcoders

    • Perform testing and ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, answer with proper

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Fiber colour coding ....
  • Q2. Routers configuration
  • Ans. 

    Routers configuration involves setting up network protocols, security measures, and IP addresses.

    • Access the router's web interface through a browser

    • Configure network protocols such as DHCP, NAT, and VLANs

    • Set up security measures such as firewalls and access control lists

    • Assign IP addresses to devices on the network

    • Examples of router brands include Cisco, Netgear, and TP-Link

  • Answered by AI
  • Q3. I will convince to customer

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

Technical

Round 2 - HR 

(1 Question)

  • Q1. Salary discussion and many more

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience matter....good fiber knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Field experience
  • Q2. And network working

Interview Preparation Tips

Interview preparation tips for other job seekers - My hardwork experience and mans hendle hyper user handle and service is best
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Case Study 

About projects handling

Round 2 - Assignment 

Assignment project with partner and team

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What was ur last experience.
  • Ans. 

    I worked as a Field Engineer at XYZ Company.

    • Managed and maintained equipment at various client sites

    • Troubleshot and resolved technical issues

    • Provided on-site support and training to clients

    • Collaborated with cross-functional teams to ensure project success

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. What was ur last work experience and what do u know about this company.
  • Ans. 

    I worked as a Field Engineer at XYZ Company. I have a good understanding of the company's products and services.

    • Worked as a Field Engineer at XYZ Company

    • Responsible for troubleshooting and repairing equipment on-site

    • Collaborated with cross-functional teams to ensure smooth operations

    • Demonstrated strong technical skills in handling complex machinery

    • Familiar with the company's product line and service offerings

    • Provided e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive and confident. Don't share any wrong info in your resume. And always confident with interviewer.
Round 1 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - Normally interview
Installation and installation process
Yur Noles please check in installation and insta

I applied via Referral and was interviewed in Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. MPLS, OSPF, BGP, ISIS

Interview Preparation Tips

Interview preparation tips for other job seekers - Never fake

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Telecom domine question
  • Q2. Auto Cad basics and experience on telecom and wireless based question

Interview Preparation Tips

Interview preparation tips for other job seekers - Only 2round for experience candidate

I applied via Naukri.com and was interviewed in Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to integrate the sites or the integration steps?
  • Ans. 

    Integration of sites involves identifying the systems to be integrated, defining the data flow, and implementing the integration process.

    • Identify the systems to be integrated

    • Define the data flow between the systems

    • Choose the appropriate integration method (API, ETL, etc.)

    • Develop and test the integration process

    • Deploy the integration process and monitor for errors

    • Ensure data security and compliance

    • Provide ongoing suppor

  • Answered by AI
  • Q2. What vlan?
  • Ans. 

    VLAN stands for Virtual Local Area Network and is used to logically separate a network into smaller segments.

    • VLANs are used to improve network performance and security.

    • They allow for better network management and easier troubleshooting.

    • VLANs can be configured on switches and routers.

    • Examples of VLANs include separating guest and employee networks or separating different departments within a company.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Listen carefully to interviwer & tell the answers with confidently.

Skills evaluated in this interview

Reecomps Teleservices Interview FAQs

How many rounds are there in Reecomps Teleservices Project Engineer interview?
Reecomps Teleservices interview process usually has 1 rounds. The most common rounds in the Reecomps Teleservices interview process are Technical.
What are the top questions asked in Reecomps Teleservices Project Engineer interview?

Some of the top questions asked at the Reecomps Teleservices Project Engineer interview -

  1. How is integrate BTS s...read more
  2. Project. Coordinat...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Ericsson Interview Questions
4.1
 • 414 Interviews
Nokia Interview Questions
4.1
 • 267 Interviews
BT Group Interview Questions
3.9
 • 183 Interviews
ACT Fibernet Interview Questions
4.0
 • 133 Interviews
Verizon Interview Questions
4.1
 • 110 Interviews
AT&T Interview Questions
4.1
 • 53 Interviews
View all
Reecomps Teleservices Project Engineer Salary
based on 13 salaries
₹2.5 L/yr - ₹4 L/yr
42% less than the average Project Engineer Salary in India
View more details

Reecomps Teleservices Project Engineer Reviews and Ratings

based on 5 reviews

4.4/5

Rating in categories

4.3

Skill development

4.2

Work-life balance

4.1

Salary

4.1

Job security

4.5

Company culture

4.2

Promotions

4.0

Work satisfaction

Explore 5 Reviews and Ratings
IBS Engineer
51 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

RF Engineer
40 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Engineer
37 salaries
unlock blur

₹2.1 L/yr - ₹4.2 L/yr

Network Engineer
27 salaries
unlock blur

₹2.2 L/yr - ₹3.6 L/yr

Project Coordinator
26 salaries
unlock blur

₹2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Reecomps Teleservices with

Ericsson

4.1
Compare

Nokia

4.1
Compare

ACT Fibernet

4.0
Compare

Huawei Technologies

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview