i
Aerial Telecom Solutions
Filter interviews by
I applied via Approached by Company and was interviewed in Jun 2024. There were 7 interview rounds.
Drive testing engineer
Jio network testing engineer
Jio drive network testing
My work completed group share
I was interviewed in Aug 2024.
Aerial Telecom Solutions interview questions for popular designations
To install an operating system, you need to boot from the installation media and follow the on-screen instructions.
Insert the installation media (such as a USB drive or DVD) into the computer
Restart the computer and boot from the installation media
Follow the on-screen instructions to select language, partition the disk, and install the OS
Wait for the installation process to complete and then restart the computer
Router connects multiple networks while switch connects devices within a network.
Router operates at the network layer (Layer 3) of the OSI model, while switch operates at the data link layer (Layer 2).
Router uses IP addresses to route data between different networks, while switch uses MAC addresses to forward data within a network.
Router can determine the best path for data packets to travel between networks, while swi...
Get interview-ready with Top Aerial Telecom Solutions Interview Questions
Managing vendors involves establishing clear communication, setting expectations, monitoring performance, and building strong relationships.
Establish clear communication channels with vendors
Set expectations regarding deliverables, timelines, and quality standards
Monitor vendor performance regularly to ensure compliance with agreements
Build strong relationships with vendors to foster collaboration and resolve issues ef
Yes, I am familiar with Cisco 5G equipment and types.
I am knowledgeable about Cisco's 5G equipment such as routers, switches, and access points.
I understand the different types of Cisco 5G equipment available in the market.
I have experience working with Cisco 5G equipment in previous projects.
The installation process involves following steps and procedures to ensure successful setup.
Create a detailed installation plan outlining all necessary steps
Gather all required materials and tools before starting the installation
Follow manufacturer's instructions and guidelines for proper installation
Test the installation to ensure everything is working correctly
Document the installation process for future reference
Was nice test and was easy questions
It was very hard and but youll cap up
Sucha a nice test and easy one although an hard also
Java , php , and othere things whty have asked
Ono to one gd round were there
Easy but hard also need to work on it
Its easy but hard also ned to work on it
It eas vwer very easy sucha a easy one
Nice but easy any one can do it with its own
Aptitude, reasoning, computer fundamentals
I applied via Approached by Company and was interviewed in Jan 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Equipment used in the field include excavators, bulldozers, cranes, and dump trucks.
Excavators
Bulldozers
Cranes
Dump trucks
Top trending discussions
The duration of Aerial Telecom Solutions interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 79 interviews
Interview experience
based on 1k reviews
Rating in categories
5-10 Yrs
Not Disclosed
1-2 Yrs
Not Disclosed
3-6 Yrs
Not Disclosed
NOC Engineer
56
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Project Coordinator
47
salaries
| ₹1.8 L/yr - ₹7.1 L/yr |
Data Entry Operator
46
salaries
| ₹0.9 L/yr - ₹2.5 L/yr |
SAP SD Consultant
42
salaries
| ₹3.6 L/yr - ₹5.1 L/yr |
Network Engineer
35
salaries
| ₹2 L/yr - ₹5.8 L/yr |
Bharti Airtel
Vodafone Idea
Jio
Tata Communications