An Assistant Project Engineer was asked 10mo ago
Q. What is an insulator, and what are some tips regarding its use?
Ans. 

An insulator is a material that does not conduct electricity and is used to prevent the flow of electrical current.

  • Insulators have high resistance to electrical current.

  • Common insulating materials include rubber, glass, and plastic.

  • Insulators are used in electrical wiring to prevent short circuits.

  • Insulators are also used in power lines to prevent electricity from leaking out.

  • Insulators can be used to protect peop...

View all Assistant Project Engineer interview questions
An Assistant Project Engineer was asked 10mo ago
Q. What is Ohm's Law?
Ans. 

Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.

  • Ohm's law is represented by the formula V = IR, where V is voltage, I is current, and R is resistance.

  • It helps in calculating the relationship between voltage, current, and resistance in an electrical circuit.

  • It is named after the German phys...

View all Assistant Project Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. Is earthing required in DTR structures?
Ans. 

Earthing in DTR structures is essential for safety and proper functioning of the equipment.

  • Earthing helps in dissipating fault currents safely to the ground.

  • It provides protection against electric shocks and equipment damage.

  • Proper earthing reduces the risk of fire hazards.

  • Earthing should be done using copper rods or strips buried in the ground.

  • Regular maintenance and testing of earthing systems is necessary.

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What is a Handing Over Taking Over certificate?
Ans. 

Handing over taking over certificate is a document used in engineering projects to officially transfer responsibility from one party to another.

  • It is a formal document that signifies the transfer of responsibility from one party to another in engineering projects.

  • It includes details such as the scope of work, completion status, quality standards, and any outstanding issues.

  • The certificate is signed by both parties...

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What is a megger, and what is the use of a megger machine?
Ans. 

A magger is a device used to measure the insulation resistance of electrical equipment or cables.

  • Magger machine is also known as insulation tester.

  • It is used to check the insulation resistance of electrical systems to ensure safety and prevent electrical failures.

  • The machine applies a high voltage to the equipment and measures the resistance to current flow, indicating the condition of the insulation.

  • Regular testi...

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What is a single-line diagram?
Ans. 

A single line diagram is a simplified diagram that shows the electrical connections and components of a power system using single lines.

  • It is a simplified representation of a power system, showing the main components and their interconnections using single lines.

  • It is used by electrical engineers to understand and analyze the power system without getting into the details of each individual component.

  • It typically i...

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What is a VCB?
Ans. 

VCB stands for Vacuum Circuit Breaker, a type of circuit breaker that uses vacuum as the arc quenching medium.

  • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium

  • It is used to interrupt fault currents in electrical systems

  • VCBs are commonly used in medium voltage applications

  • They are more reliable and require less maintenance compared to other types of circuit breakers

View all Electrical Engineer interview questions
Are these interview questions helpful?
An Electrical Engineer was asked 11mo ago
Q. What is the difference between HT and LT lines?
Ans. 

HT lines are high tension lines used for transmitting electricity over long distances at high voltages, while LT lines are low tension lines used for distributing electricity at lower voltages in local areas.

  • HT lines carry electricity at high voltages for long distance transmission.

  • LT lines distribute electricity at lower voltages in local areas.

  • HT lines are typically used for transmission towers, while LT lines a...

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What equipment is required in HT and LT lines?
Ans. 

Equipment required in HT and LT lines include transformers, circuit breakers, insulators, conductors, and lightning arresters.

  • Transformers are used to step up or step down voltage levels in HT and LT lines.

  • Circuit breakers are essential for protecting the lines from overloads and short circuits.

  • Insulators are used to support and separate conductors to prevent electrical leakage.

  • Conductors are used to carry the ele...

View all Electrical Engineer interview questions
An Electrical Engineer was asked 11mo ago
Q. What is the process of feeder charging and handover?
Ans. 

Feeder charging and handing over involves the process of transferring electrical power from one source to another.

  • Ensure proper safety measures are in place before starting the process

  • Check the voltage and current ratings of the feeder to ensure compatibility with the receiving end

  • Disconnect the feeder from the power source and connect it to the receiving end

  • Verify the successful transfer of power and ensure prope...

View all Electrical Engineer interview questions

REC Power Development and Consultancy Interview Experiences

6 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Work process, Work planing etc.

Round 2 - Assignment 

Full Power Sub-Station work, Feeder Segregation, Feeder Bifurcation, LT AB Cable Replacement, Recunductring of old HT 11kv lines under Revamped distribution scheme.

Round 3 - Technical 

(20 Questions)

  • Q1. HT/LT Line diffrence ?
  • Ans. 

    HT lines are high tension lines used for transmitting electricity over long distances at high voltages, while LT lines are low tension lines used for distributing electricity at lower voltages in local areas.

    • HT lines carry electricity at high voltages for long distance transmission.

    • LT lines distribute electricity at lower voltages in local areas.

    • HT lines are typically used for transmission towers, while LT lines are us...

  • Answered by AI
  • Q2. What equipment required in HT and LT Lines ?
  • Ans. 

    Equipment required in HT and LT lines include transformers, circuit breakers, insulators, conductors, and lightning arresters.

    • Transformers are used to step up or step down voltage levels in HT and LT lines.

    • Circuit breakers are essential for protecting the lines from overloads and short circuits.

    • Insulators are used to support and separate conductors to prevent electrical leakage.

    • Conductors are used to carry the electric...

  • Answered by AI
  • Q3. Types of GI Top Channels, Cross angles, Types of DTR, Ratting of DTR, Current capacity of DTR's ?
  • Ans. 

    Types of GI top channels, cross angles, types of DTR, rating of DTR, current capacity of DTRs.

    • Types of GI top channels include GI plain channels and GI perforated channels.

    • Cross angles are used to provide additional support and stability to structures.

    • Types of DTR (Distribution Transformer Rectifier) include single-phase and three-phase.

    • Rating of DTR is typically in kVA (kilo Volt-Ampere) and can range from 25 kVA to 2...

  • Answered by AI
  • Q4. DTR Structure materials ?
  • Q5. Required Earthing in DTR Structures ?
  • Ans. 

    Earthing in DTR structures is essential for safety and proper functioning of the equipment.

    • Earthing helps in dissipating fault currents safely to the ground.

    • It provides protection against electric shocks and equipment damage.

    • Proper earthing reduces the risk of fire hazards.

    • Earthing should be done using copper rods or strips buried in the ground.

    • Regular maintenance and testing of earthing systems is necessary.

  • Answered by AI
  • Q6. What is the use of Earthing road, use process of Earthing road in HT Lines ?
  • Ans. 

    Earthing road is used in HT lines to provide a path for fault current to flow safely into the ground, preventing damage to equipment and ensuring safety.

    • Earthing road is a conductive strip or wire buried in the ground near HT lines.

    • It provides a low resistance path for fault current to flow into the ground, preventing damage to equipment and ensuring safety.

    • Proper installation of earthing road involves burying the cond...

  • Answered by AI
  • Q7. What is the VCB ?
  • Ans. 

    VCB stands for Vacuum Circuit Breaker, a type of circuit breaker that uses vacuum as the arc quenching medium.

    • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium

    • It is used to interrupt fault currents in electrical systems

    • VCBs are commonly used in medium voltage applications

    • They are more reliable and require less maintenance compared to other types of circuit breakers

  • Answered by AI
  • Q8. What is the incommer machine ?
  • Ans. 

    The incommer machine is a device used to control the incoming power supply to a system or equipment.

    • An incommer machine is typically used in electrical distribution systems to manage the flow of electricity.

    • It can be a switchgear device that allows for the connection or disconnection of power sources.

    • Incommer machines are essential for ensuring the safety and efficiency of electrical systems.

    • Examples include circuit br...

  • Answered by AI
  • Q9. LT AB Cable's current capacity ?
  • Ans. 

    LT AB Cable's current capacity depends on factors like conductor size, insulation material, ambient temperature, etc.

    • Current capacity of LT AB Cable is determined by factors like conductor size, insulation material, ambient temperature, installation method, etc.

    • The current capacity can be calculated using standard formulas and tables provided by manufacturers or industry standards.

    • For example, a 25mm² LT AB Cable may h...

  • Answered by AI
  • Q10. What is magger, use of Magger machine ?
  • Ans. 

    A magger is a device used to measure the insulation resistance of electrical equipment or cables.

    • Magger machine is also known as insulation tester.

    • It is used to check the insulation resistance of electrical systems to ensure safety and prevent electrical failures.

    • The machine applies a high voltage to the equipment and measures the resistance to current flow, indicating the condition of the insulation.

    • Regular testing wi...

  • Answered by AI
  • Q11. What is the process of material Inspection of electrical projects.
  • Ans. 

    Material inspection of electrical projects involves checking the quality and specifications of materials used in the project.

    • Verify that materials meet project specifications and standards

    • Inspect materials for damage or defects

    • Check for proper labeling and documentation

    • Ensure materials are stored and handled correctly

    • Perform tests or measurements on materials as needed

    • Examples: checking the gauge and insulation of elec...

  • Answered by AI
  • Q12. What is the BOQ ?
  • Ans. 

    BOQ stands for Bill of Quantities, a document used in construction projects to list the materials, parts, and labor needed for a project.

    • BOQ is a detailed list of items, with quantities and prices, required for a construction project.

    • It helps in estimating the total cost of the project and serves as a basis for tendering and budgeting.

    • BOQ is typically prepared by quantity surveyors or estimators based on the project dr...

  • Answered by AI
  • Q13. What is the Handing over taking over certificate ?
  • Ans. 

    Handing over taking over certificate is a document used in engineering projects to officially transfer responsibility from one party to another.

    • It is a formal document that signifies the transfer of responsibility from one party to another in engineering projects.

    • It includes details such as the scope of work, completion status, quality standards, and any outstanding issues.

    • The certificate is signed by both parties to a...

  • Answered by AI
  • Q14. What is the Single line diagram ?
  • Ans. 

    A single line diagram is a simplified diagram that shows the electrical connections and components of a power system using single lines.

    • It is a simplified representation of a power system, showing the main components and their interconnections using single lines.

    • It is used by electrical engineers to understand and analyze the power system without getting into the details of each individual component.

    • It typically includ...

  • Answered by AI
  • Q15. What is the Pole schedule ?
  • Ans. 

    A pole schedule is a document that lists the locations and details of all poles used in an electrical distribution system.

    • It includes information such as pole number, location, height, material, and any attachments or equipment mounted on the pole.

    • Pole schedules are important for maintenance, repair, and expansion of the electrical distribution system.

    • Example: Pole 1 located at Main Street, 30 feet tall wooden pole wit...

  • Answered by AI
  • Q16. What is the process of Feeder bifurcation ?
  • Ans. 

    Feeder bifurcation is the process of dividing a main electrical feeder into multiple branches to distribute power to different areas.

    • Feeder bifurcation involves splitting a main feeder into smaller branches to supply power to different sections of a building or facility.

    • This process helps in balancing the load and preventing overloading of the main feeder.

    • Feeder bifurcation can be done using distribution panels, circui...

  • Answered by AI
  • Q17. What is the process of Feeder charging and handing over ?
  • Ans. 

    Feeder charging and handing over involves the process of transferring electrical power from one source to another.

    • Ensure proper safety measures are in place before starting the process

    • Check the voltage and current ratings of the feeder to ensure compatibility with the receiving end

    • Disconnect the feeder from the power source and connect it to the receiving end

    • Verify the successful transfer of power and ensure proper fun...

  • Answered by AI
  • Q18. What is the process of Railway crossings ?
  • Ans. 

    Railway crossings are intersections where roads and railway tracks meet, requiring vehicles to stop when trains are passing.

    • Railway crossings are equipped with warning signs, lights, and barriers to alert drivers of approaching trains.

    • Drivers must stop behind the barriers when they are down and wait for the train to pass before proceeding.

    • Some railway crossings also have bells or horns to further warn drivers of an app...

  • Answered by AI
  • Q19. How many type equipment required in LT and HT line work ?
  • Ans. 

    Various types of equipment are required in LT and HT line work, including transformers, circuit breakers, insulators, conductors, and protective devices.

    • Transformers

    • Circuit breakers

    • Insulators

    • Conductors

    • Protective devices

  • Answered by AI
  • Q20. Step down and step up transformers work.
  • Ans. 

    Step down transformers decrease voltage while step up transformers increase voltage.

    • Step down transformers have more turns in the primary coil than the secondary coil.

    • Step up transformers have more turns in the secondary coil than the primary coil.

    • Step down transformers are used to reduce voltage for household appliances.

    • Step up transformers are used in power transmission to increase voltage for long distance transmiss...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard gain best groud required actual experiance which is too necessary on electrical field.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Explain abouts yourself,
  • Ans. 

    I am a dedicated and detail-oriented project engineer with a strong background in civil engineering and a passion for problem-solving.

    • Graduated with a degree in Civil Engineering from XYZ University

    • Completed internships at ABC Construction Company and gained hands-on experience in project management

    • Proficient in AutoCAD, project scheduling software, and conducting site inspections

    • Strong communication skills and ability...

  • Answered by AI
  • Q2. What did you decided about that RCPDCL
  • Ans. 

    I decided to work with RCPDCL due to their strong reputation in the industry and their commitment to sustainable practices.

    • Chose RCPDCL for their reputation in the industry

    • Impressed by RCPDCL's commitment to sustainable practices

    • Believed RCPDCL was the best fit for the project based on their track record

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is ohm's law
  • Ans. 

    Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.

    • Ohm's law is represented by the formula V = IR, where V is voltage, I is current, and R is resistance.

    • It helps in calculating the relationship between voltage, current, and resistance in an electrical circuit.

    • It is named after the German physicist...

  • Answered by AI
  • Q2. What is insulator and tips
  • Ans. 

    An insulator is a material that does not conduct electricity and is used to prevent the flow of electrical current.

    • Insulators have high resistance to electrical current.

    • Common insulating materials include rubber, glass, and plastic.

    • Insulators are used in electrical wiring to prevent short circuits.

    • Insulators are also used in power lines to prevent electricity from leaking out.

    • Insulators can be used to protect people fr...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Sep 2023.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Only branch core related
  • Q2. Introduction & experience related questions
  • Q3. Job location willing
  • Q4. Expectation salary
  • Q5. Erection , executions & installation smart Metering

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Erection & execution
  • Q2. Installation of Distribution Transformers
  • Ans. 

    The installation of distribution transformers involves several steps and considerations.

    • Ensure proper site preparation before installation

    • Select the appropriate transformer based on load requirements

    • Ensure proper grounding and electrical connections

    • Follow safety protocols during installation

    • Perform testing and commissioning after installation

    • Consider environmental factors and protection measures

    • Provide adequate ventila...

  • Answered by AI
  • Q3. 10MVA Receiving Station
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Are you comfortable working on weekends as and when necessary?
  • Q2. Mention 2-3 points on MFN clause in tax treaties
  • Ans. 

    MFN clause in tax treaties allows a country to grant the same tax treatment to one treaty partner as it does to any other country

    • MFN clause ensures that a country cannot provide more favorable tax treatment to another country without extending the same treatment to all treaty partners

    • It promotes fairness and prevents discrimination among treaty partners

    • For example, if Country A has a tax treaty with Country B and later...

  • Answered by AI
  • Q3. Recent changes in Schedule-III
  • Ans. 

    Recent changes in Schedule-III pertain to the format of financial statements for companies.

    • Schedule-III of the Companies Act, 2013 has been amended to align with the Indian Accounting Standards (Ind AS).

    • The changes include revised formats for balance sheet, profit and loss account, and cash flow statement.

    • The new formats aim to improve transparency, comparability, and quality of financial reporting.

    • Companies are requir...

  • Answered by AI
  • Q4. Different heads under which bank balance is shown in balance sheet?
  • Ans. 

    Bank balance is shown in balance sheet under various heads such as cash and cash equivalents, loans and advances, investments, etc.

    • Cash and cash equivalents

    • Loans and advances

    • Investments

    • Other assets

    • Deposits

    • Borrowings

    • Other liabilities

  • Answered by AI

Interview Questions & Answers

user image Anonymous

posted on 2 Jun 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jun 2024, where I was asked the following questions.

  • Q1. Why do you like to join RECPDCL?
  • Ans. 

    I am drawn to RECPDCL for its commitment to sustainable energy solutions and its role in transforming India's power sector.

    • RECPDCL's focus on renewable energy aligns with my passion for sustainability, as seen in my previous work on solar energy projects.

    • The opportunity to contribute to India's energy transition excites me, especially after witnessing the impact of clean energy initiatives.

    • I admire RECPDCL's innovative...

  • Answered by AI
  • Q2. What extra knowledge/Skill you are having to get business For RECPDCL From Power Utilities?
  • Ans. 

    I possess a blend of technical expertise and relationship-building skills to drive business for RECPDCL from power utilities.

    • Strong understanding of renewable energy technologies, enabling me to propose innovative solutions to power utilities.

    • Experience in project management, ensuring timely delivery and adherence to quality standards, which builds trust with clients.

    • Proficient in regulatory frameworks and compliance, ...

  • Answered by AI
  • Q3. What type of Test of a Transformer has to be carried out which is mandetory
  • Ans. 

    Mandatory tests for transformers ensure safety, efficiency, and reliability in electrical systems.

    • Insulation Resistance Test: Measures the insulation's ability to resist electrical leakage.

    • Transformer Turns Ratio (TTR) Test: Ensures the correct turns ratio between primary and secondary windings.

    • Power Factor Test: Assesses the dielectric losses in the insulation system.

    • Sweep Frequency Response Analysis: Identifies mecha...

  • Answered by AI
  • Q4. What do you mean by LEvel1 & 2 of a distribution transformer
  • Ans. 

    Level 1 and Level 2 refer to the different voltage levels in a distribution transformer system.

    • Level 1 typically refers to the primary side voltage, which is higher (e.g., 11kV).

    • Level 2 refers to the secondary side voltage, which is lower (e.g., 400V).

    • Transformers step down voltage from Level 1 to Level 2 for safe distribution.

    • Example: A transformer with 11kV input (Level 1) and 400V output (Level 2) for residential us...

  • Answered by AI
  • Q5. What is Line Spacers?
  • Ans. 

    Line spacers are tools used in various industries to maintain consistent spacing between lines or components.

    • Used in construction to ensure even spacing between structural elements.

    • In printing, line spacers help maintain uniform distance between lines of text.

    • In electrical installations, they keep wires organized and spaced correctly.

    • Example: In masonry, line spacers help align bricks for a straight wall.

  • Answered by AI

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about REC Power Development and Consultancy?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All Technical quetions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared technically
Are these interview questions helpful?

I applied via Campus Placement and was interviewed before Jun 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General HR questions and some current related topic

Interview Preparation Tips

Interview preparation tips for other job seekers - Speak till recruiter stops you

Interview Questionnaire 

1 Question

  • Q1. Java c c++

Interview Questionnaire 

1 Question

  • Q1. Your past exp?

REC Power Development and Consultancy Interview FAQs

How many rounds are there in REC Power Development and Consultancy interview?
REC Power Development and Consultancy interview process usually has 2 rounds. The most common rounds in the REC Power Development and Consultancy interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in REC Power Development and Consultancy interview?

Some of the top questions asked at the REC Power Development and Consultancy interview -

  1. What is the use of Earthing road, use process of Earthing road in HT Line...read more
  2. What is the process of Feeder charging and handing ove...read more
  3. how many type equipment required in LT and HT line wor...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 13 interview experiences

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.6
 • 11.1k Interviews
Accenture Interview Questions
3.7
 • 8.7k Interviews
Infosys Interview Questions
3.6
 • 7.9k Interviews
Wipro Interview Questions
3.7
 • 6.1k Interviews
Cognizant Interview Questions
3.7
 • 5.9k Interviews
Amazon Interview Questions
4.0
 • 5.4k Interviews
Capgemini Interview Questions
3.7
 • 5.1k Interviews
Tech Mahindra Interview Questions
3.5
 • 4.1k Interviews
HCLTech Interview Questions
3.5
 • 4.1k Interviews
Genpact Interview Questions
3.7
 • 3.4k Interviews
View all

REC Power Development and Consultancy Reviews and Ratings

based on 126 reviews

4.1/5

Rating in categories

3.8

Skill development

4.1

Work-life balance

4.0

Salary

3.1

Job security

3.9

Company culture

3.2

Promotions

3.9

Work satisfaction

Explore 126 Reviews and Ratings
Project Engineer
114 salaries
unlock blur

₹3.6 L/yr - ₹7.5 L/yr

Assistant Project Engineer
65 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Senior Project Engineer
29 salaries
unlock blur

₹3.8 L/yr - ₹6.4 L/yr

Executive Engineer
10 salaries
unlock blur

₹13.3 L/yr - ₹16.7 L/yr

Assistant Executive Engineer
9 salaries
unlock blur

₹7.4 L/yr - ₹7.6 L/yr

Explore more salaries
Compare REC Power Development and Consultancy with

TCS

3.6
Compare

Accenture

3.7
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
write
Share an Interview