Round 1 - Aptitude Test 

Work process, Work planing etc.

Round 2 - Assignment 

Full Power Sub-Station work, Feeder Segregation, Feeder Bifurcation, LT AB Cable Replacement, Recunductring of old HT 11kv lines under Revamped distribution scheme.

Round 3 - Technical 

(20 Questions)

  • Q1. HT/LT Line diffrence ?
  • Ans. 

    HT lines are high tension lines used for transmitting electricity over long distances at high voltages, while LT lines are low tension lines used for distributing electricity at lower voltages in local areas.

    • HT lines carry electricity at high voltages for long distance transmission.

    • LT lines distribute electricity at lower voltages in local areas.

    • HT lines are typically used for transmission towers, while LT lines are us...

  • Answered by AI
  • Q2. What equipment required in HT and LT Lines ?
  • Ans. 

    Equipment required in HT and LT lines include transformers, circuit breakers, insulators, conductors, and lightning arresters.

    • Transformers are used to step up or step down voltage levels in HT and LT lines.

    • Circuit breakers are essential for protecting the lines from overloads and short circuits.

    • Insulators are used to support and separate conductors to prevent electrical leakage.

    • Conductors are used to carry the electric...

  • Answered by AI
  • Q3. Types of GI Top Channels, Cross angles, Types of DTR, Ratting of DTR, Current capacity of DTR's ?
  • Ans. 

    Types of GI top channels, cross angles, types of DTR, rating of DTR, current capacity of DTRs.

    • Types of GI top channels include GI plain channels and GI perforated channels.

    • Cross angles are used to provide additional support and stability to structures.

    • Types of DTR (Distribution Transformer Rectifier) include single-phase and three-phase.

    • Rating of DTR is typically in kVA (kilo Volt-Ampere) and can range from 25 kVA to 2...

  • Answered by AI
  • Q4. DTR Structure materials ?
  • Q5. Required Earthing in DTR Structures ?
  • Ans. 

    Earthing in DTR structures is essential for safety and proper functioning of the equipment.

    • Earthing helps in dissipating fault currents safely to the ground.

    • It provides protection against electric shocks and equipment damage.

    • Proper earthing reduces the risk of fire hazards.

    • Earthing should be done using copper rods or strips buried in the ground.

    • Regular maintenance and testing of earthing systems is necessary.

  • Answered by AI
  • Q6. What is the use of Earthing road, use process of Earthing road in HT Lines ?
  • Ans. 

    Earthing road is used in HT lines to provide a path for fault current to flow safely into the ground, preventing damage to equipment and ensuring safety.

    • Earthing road is a conductive strip or wire buried in the ground near HT lines.

    • It provides a low resistance path for fault current to flow into the ground, preventing damage to equipment and ensuring safety.

    • Proper installation of earthing road involves burying the cond...

  • Answered by AI
  • Q7. What is the VCB ?
  • Ans. 

    VCB stands for Vacuum Circuit Breaker, a type of circuit breaker that uses vacuum as the arc quenching medium.

    • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium

    • It is used to interrupt fault currents in electrical systems

    • VCBs are commonly used in medium voltage applications

    • They are more reliable and require less maintenance compared to other types of circuit breakers

  • Answered by AI
  • Q8. What is the incommer machine ?
  • Ans. 

    The incommer machine is a device used to control the incoming power supply to a system or equipment.

    • An incommer machine is typically used in electrical distribution systems to manage the flow of electricity.

    • It can be a switchgear device that allows for the connection or disconnection of power sources.

    • Incommer machines are essential for ensuring the safety and efficiency of electrical systems.

    • Examples include circuit br

  • Answered by AI
  • Q9. LT AB Cable's current capacity ?
  • Ans. 

    LT AB Cable's current capacity depends on factors like conductor size, insulation material, ambient temperature, etc.

    • Current capacity of LT AB Cable is determined by factors like conductor size, insulation material, ambient temperature, installation method, etc.

    • The current capacity can be calculated using standard formulas and tables provided by manufacturers or industry standards.

    • For example, a 25mm² LT AB Cable may h...

  • Answered by AI
  • Q10. What is magger, use of Magger machine ?
  • Ans. 

    A magger is a device used to measure the insulation resistance of electrical equipment or cables.

    • Magger machine is also known as insulation tester.

    • It is used to check the insulation resistance of electrical systems to ensure safety and prevent electrical failures.

    • The machine applies a high voltage to the equipment and measures the resistance to current flow, indicating the condition of the insulation.

    • Regular testing wi...

  • Answered by AI
  • Q11. What is the process of material Inspection of electrical projects.
  • Ans. 

    Material inspection of electrical projects involves checking the quality and specifications of materials used in the project.

    • Verify that materials meet project specifications and standards

    • Inspect materials for damage or defects

    • Check for proper labeling and documentation

    • Ensure materials are stored and handled correctly

    • Perform tests or measurements on materials as needed

    • Examples: checking the gauge and insulation of elec...

  • Answered by AI
  • Q12. What is the BOQ ?
  • Ans. 

    BOQ stands for Bill of Quantities, a document used in construction projects to list the materials, parts, and labor needed for a project.

    • BOQ is a detailed list of items, with quantities and prices, required for a construction project.

    • It helps in estimating the total cost of the project and serves as a basis for tendering and budgeting.

    • BOQ is typically prepared by quantity surveyors or estimators based on the project dr...

  • Answered by AI
  • Q13. What is the Handing over taking over certificate ?
  • Ans. 

    Handing over taking over certificate is a document used in engineering projects to officially transfer responsibility from one party to another.

    • It is a formal document that signifies the transfer of responsibility from one party to another in engineering projects.

    • It includes details such as the scope of work, completion status, quality standards, and any outstanding issues.

    • The certificate is signed by both parties to a...

  • Answered by AI
  • Q14. What is the Single line diagram ?
  • Ans. 

    A single line diagram is a simplified diagram that shows the electrical connections and components of a power system using single lines.

    • It is a simplified representation of a power system, showing the main components and their interconnections using single lines.

    • It is used by electrical engineers to understand and analyze the power system without getting into the details of each individual component.

    • It typically includ...

  • Answered by AI
  • Q15. What is the Pole schedule ?
  • Ans. 

    A pole schedule is a document that lists the locations and details of all poles used in an electrical distribution system.

    • It includes information such as pole number, location, height, material, and any attachments or equipment mounted on the pole.

    • Pole schedules are important for maintenance, repair, and expansion of the electrical distribution system.

    • Example: Pole 1 located at Main Street, 30 feet tall wooden pole wit

  • Answered by AI
  • Q16. What is the process of Feeder bifurcation ?
  • Ans. 

    Feeder bifurcation is the process of dividing a main electrical feeder into multiple branches to distribute power to different areas.

    • Feeder bifurcation involves splitting a main feeder into smaller branches to supply power to different sections of a building or facility.

    • This process helps in balancing the load and preventing overloading of the main feeder.

    • Feeder bifurcation can be done using distribution panels, circui...

  • Answered by AI
  • Q17. What is the process of Feeder charging and handing over ?
  • Ans. 

    Feeder charging and handing over involves the process of transferring electrical power from one source to another.

    • Ensure proper safety measures are in place before starting the process

    • Check the voltage and current ratings of the feeder to ensure compatibility with the receiving end

    • Disconnect the feeder from the power source and connect it to the receiving end

    • Verify the successful transfer of power and ensure proper fun...

  • Answered by AI
  • Q18. What is the process of Railway crossings ?
  • Ans. 

    Railway crossings are intersections where roads and railway tracks meet, requiring vehicles to stop when trains are passing.

    • Railway crossings are equipped with warning signs, lights, and barriers to alert drivers of approaching trains.

    • Drivers must stop behind the barriers when they are down and wait for the train to pass before proceeding.

    • Some railway crossings also have bells or horns to further warn drivers of an app...

  • Answered by AI
  • Q19. How many type equipment required in LT and HT line work ?
  • Ans. 

    Various types of equipment are required in LT and HT line work, including transformers, circuit breakers, insulators, conductors, and protective devices.

    • Transformers

    • Circuit breakers

    • Insulators

    • Conductors

    • Protective devices

  • Answered by AI
  • Q20. Step down and step up transformers work.
  • Ans. 

    Step down transformers decrease voltage while step up transformers increase voltage.

    • Step down transformers have more turns in the primary coil than the secondary coil.

    • Step up transformers have more turns in the secondary coil than the primary coil.

    • Step down transformers are used to reduce voltage for household appliances.

    • Step up transformers are used in power transmission to increase voltage for long distance transmiss

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard gain best groud required actual experiance which is too necessary on electrical field.

Top REC Power Development and Consultancy Electrical Engineer Interview Questions and Answers

Q1. What is the process of Feeder charging and handing over ?
View answer (1)

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Explain abouts yourself,
  • Ans. 

    I am a dedicated and detail-oriented project engineer with a strong background in civil engineering and a passion for problem-solving.

    • Graduated with a degree in Civil Engineering from XYZ University

    • Completed internships at ABC Construction Company and gained hands-on experience in project management

    • Proficient in AutoCAD, project scheduling software, and conducting site inspections

    • Strong communication skills and ability

  • Answered by AI
  • Q2. What did you decided about that RCPDCL
  • Ans. 

    I decided to work with RCPDCL due to their strong reputation in the industry and their commitment to sustainable practices.

    • Chose RCPDCL for their reputation in the industry

    • Impressed by RCPDCL's commitment to sustainable practices

    • Believed RCPDCL was the best fit for the project based on their track record

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is ohm's law
  • Ans. 

    Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.

    • Ohm's law is represented by the formula V = IR, where V is voltage, I is current, and R is resistance.

    • It helps in calculating the relationship between voltage, current, and resistance in an electrical circuit.

    • It is named after the German physicist...

  • Answered by AI
  • Q2. What is insulator and tips
  • Ans. 

    An insulator is a material that does not conduct electricity and is used to prevent the flow of electrical current.

    • Insulators have high resistance to electrical current.

    • Common insulating materials include rubber, glass, and plastic.

    • Insulators are used in electrical wiring to prevent short circuits.

    • Insulators are also used in power lines to prevent electricity from leaking out.

    • Insulators can be used to protect people fr

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Assistant Project Engineer Interview Questions asked at other Companies

Q1. What is the difference between RTD & Thermocouple?
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Sep 2023.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Only branch core related
  • Q2. Introduction & experience related questions
  • Q3. Job location willing
  • Q4. Expectation salary
  • Q5. Erection , executions & installation smart Metering

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Erection & execution
  • Q2. Installation of Distribution Transformers
  • Ans. 

    The installation of distribution transformers involves several steps and considerations.

    • Ensure proper site preparation before installation

    • Select the appropriate transformer based on load requirements

    • Ensure proper grounding and electrical connections

    • Follow safety protocols during installation

    • Perform testing and commissioning after installation

    • Consider environmental factors and protection measures

    • Provide adequate ventila...

  • Answered by AI
  • Q3. 10MVA Receiving Station

Electrical and Instrumentation Project Engineer Interview Questions asked at other Companies

Q1. Installation of Distribution Transformers
View answer (1)

REC Power Development and Consultancy interview questions for popular designations

 Assistant Project Engineer

 (1)

 Electrical Engineer

 (1)

 Project Engineer

 (1)

 Finance Executive

 (1)

 Electrical and Instrumentation Project Engineer

 (1)

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. Are you comfortable working on weekends as and when necessary?
  • Q2. Mention 2-3 points on MFN clause in tax treaties
  • Ans. 

    MFN clause in tax treaties allows a country to grant the same tax treatment to one treaty partner as it does to any other country

    • MFN clause ensures that a country cannot provide more favorable tax treatment to another country without extending the same treatment to all treaty partners

    • It promotes fairness and prevents discrimination among treaty partners

    • For example, if Country A has a tax treaty with Country B and later...

  • Answered by AI
  • Q3. Recent changes in Schedule-III
  • Ans. 

    Recent changes in Schedule-III pertain to the format of financial statements for companies.

    • Schedule-III of the Companies Act, 2013 has been amended to align with the Indian Accounting Standards (Ind AS).

    • The changes include revised formats for balance sheet, profit and loss account, and cash flow statement.

    • The new formats aim to improve transparency, comparability, and quality of financial reporting.

    • Companies are requir...

  • Answered by AI
  • Q4. Different heads under which bank balance is shown in balance sheet?
  • Ans. 

    Bank balance is shown in balance sheet under various heads such as cash and cash equivalents, loans and advances, investments, etc.

    • Cash and cash equivalents

    • Loans and advances

    • Investments

    • Other assets

    • Deposits

    • Borrowings

    • Other liabilities

  • Answered by AI

Finance Executive Interview Questions asked at other Companies

Q1. Certains Rules to follow - 1. Remove your footwear outside of the company, though it sounds strange! yes, this is a rule. They have other footwear inside the company (optional) if you want to carry it. 2. For Washrooms, they have kept chapp... read more
View answer (4)

Interview questions from similar companies

I applied via Walk-in and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Tell me about yourself and technical knowledge.

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay calm you will achieve it.

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my previous work experience
  • Q2. About achievements

Interview Preparation Tips

Interview preparation tips for other job seekers - It was good. I was asked everything in detail and the managers make you comfortable enough so that answer each and evry question

I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Online technical MCQ exam you have to clear..
  • Q2. After online technical MCQ telephonic round approx 30min.

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge will be asked at technical round.
Be confident while giving answer.


Based on prior experience they will ask questions.

Interview Questionnaire 

1 Question

  • Q1. Ques related to spring, rest web services

Interview Preparation Tips

Interview preparation tips for other job seekers - Average difficulty, smooth process

I appeared for an interview before Dec 2020.

Round 1 - Coding Test 

(2 Questions)

Round duration - 90 Minutes
Round difficulty - Medium

2 coding questions and 20 mcq
 

  • Q1. 

    Rotting Oranges Problem Statement

    You are given a grid containing oranges where each cell of the grid can contain one of the three integer values:

    • 0 - representing an empty cell
    • 1 - representing a fre...
  • Ans. 

    Find the minimum time required to rot all fresh oranges in a grid.

    • Use Breadth First Search (BFS) to simulate the rotting process.

    • Track the time taken to rot all oranges and return -1 if any fresh oranges remain.

    • Handle edge cases like no fresh oranges or all oranges already rotten.

    • Consider using a queue to efficiently process adjacent oranges.

    • Ensure to update the grid with the new state of oranges after each second.

  • Answered by AI
  • Q2. 

    Calculate Sum of Proper Divisors

    Given a natural number N, return the sum of all its proper divisors.

    A proper divisor of Y is defined as a number X such that X < Y and Y % X = 0.

    Example:

    Input:
    T...
  • Ans. 

    Calculate the sum of proper divisors of a given natural number.

    • Iterate from 1 to sqrt(N) and check for divisors

    • If a divisor is found, add it to the sum and also add N/divisor if it is not the same as divisor

    • Return the sum as the result

  • Answered by AI
Round 2 - Video Call 

(1 Question)

Round duration - 45 Minutes
Round difficulty - Medium

Technical interview

  • Q1. 

    Rearrange Array to Form Largest Number

    Given an array ARR consisting of non-negative integers, rearrange the numbers to form the largest possible number. The digits within each number cannot be changed.

    ...

  • Ans. 

    Rearrange the array elements to form the largest possible number by concatenating them.

    • Sort the array elements in a custom comparator function to get the largest number.

    • Convert the sorted array elements to strings and concatenate them to form the final number.

    • Handle cases where the numbers have the same prefix by comparing the concatenated forms.

  • Answered by AI

Interview Preparation Tips

Professional and academic backgroundI applied for the job as SDE - 1 in DelhiEligibility criteriaCriteria not revealed to candidateAmazon interview preparation:Topics to prepare for the interview - Array, Linkedlist, Tree, Graph, Stack, OOPS, Geeksforgeeks archives, coding ninjas interview experience blogsTime required to prepare for the interview - 1 MonthInterview preparation tips for other job seekers

Tip 1 : Be clear about whatever you have mentioned in resume, don't mention buzz words, because interviewer can go in depth
Tip 2 : Along with DS and Algo, if you have 3-4 months experience or internship experience, then be ready to answer scenario based technical questions like scaling the application that you developed and design concepts that can be used for improving
Tip 3 : Last but most important tip is to be calm through out the whole process ,don't loose hope if any round didn't go well ,if you have explained your thought process there is still chance to procees to next round so keep preparating for next rounds.

Application resume tips for other job seekers

Tip 1 : Keep it one page resume and mention keywords which align with your technical and personal competencies.
Tip 2 : Mention 3-4 projects in the order that , project which you can explain best should be at top,then the next, and so on.

Final outcome of the interviewRejected

Skills evaluated in this interview

REC Power Development and Consultancy Interview FAQs

How many rounds are there in REC Power Development and Consultancy interview?
REC Power Development and Consultancy interview process usually has 2 rounds. The most common rounds in the REC Power Development and Consultancy interview process are Technical, Resume Shortlist and One-on-one Round.
What are the top questions asked in REC Power Development and Consultancy interview?

Some of the top questions asked at the REC Power Development and Consultancy interview -

  1. What is the process of Feeder charging and handing ove...read more
  2. how many type equipment required in LT and HT line wor...read more
  3. What is the use of Earthing road, use process of Earthing road in HT Line...read more

Tell us how to improve this page.

REC Power Development and Consultancy Interview Process

based on 13 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.6k Interviews
Accenture Interview Questions
3.8
 • 8.3k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.7k Interviews
Cognizant Interview Questions
3.7
 • 5.6k Interviews
Amazon Interview Questions
4.0
 • 5.1k Interviews
Capgemini Interview Questions
3.7
 • 4.8k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.9k Interviews
HCLTech Interview Questions
3.5
 • 3.9k Interviews
Genpact Interview Questions
3.8
 • 3.2k Interviews
View all

REC Power Development and Consultancy Reviews and Ratings

based on 107 reviews

3.9/5

Rating in categories

3.5

Skill development

4.0

Work-life balance

3.8

Salary

2.7

Job security

3.8

Company culture

2.9

Promotions

3.7

Work satisfaction

Explore 107 Reviews and Ratings
Project Engineer
92 salaries
unlock blur

₹3.3 L/yr - ₹7 L/yr

Assistant Project Engineer
58 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Senior Project Engineer
29 salaries
unlock blur

₹3.8 L/yr - ₹6.4 L/yr

Assistant Executive Engineer
9 salaries
unlock blur

₹7.4 L/yr - ₹7.6 L/yr

Executive Engineer
8 salaries
unlock blur

₹13.3 L/yr - ₹16.7 L/yr

Explore more salaries
Compare REC Power Development and Consultancy with

TCS

3.7
Compare

Accenture

3.8
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview