REC Power Development and Consultancy Electrical Engineer Interview Questions and Answers

Updated 4 Jul 2024

19 Interview questions

An Electrical Engineer was asked 11mo ago
Q. Is earthing required in DTR structures?
Ans. 

Earthing in DTR structures is essential for safety and proper functioning of the equipment.

  • Earthing helps in dissipating fault currents safely to the ground.

  • It provides protection against electric shocks and equipment damage.

  • Proper earthing reduces the risk of fire hazards.

  • Earthing should be done using copper rods or strips buried in the ground.

  • Regular maintenance and testing of earthing systems is necessary.

An Electrical Engineer was asked 11mo ago
Q. What is a Handing Over Taking Over certificate?
Ans. 

Handing over taking over certificate is a document used in engineering projects to officially transfer responsibility from one party to another.

  • It is a formal document that signifies the transfer of responsibility from one party to another in engineering projects.

  • It includes details such as the scope of work, completion status, quality standards, and any outstanding issues.

  • The certificate is signed by both parties...

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switchgear and Circuit Breakers?
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. What are composite error and ratio error in a current transformer ... read more
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformers are there based on voltage transfe ... read more
An Electrical Engineer was asked 11mo ago
Q. What is a megger, and what is the use of a megger machine?
Ans. 

A magger is a device used to measure the insulation resistance of electrical equipment or cables.

  • Magger machine is also known as insulation tester.

  • It is used to check the insulation resistance of electrical systems to ensure safety and prevent electrical failures.

  • The machine applies a high voltage to the equipment and measures the resistance to current flow, indicating the condition of the insulation.

  • Regular testi...

An Electrical Engineer was asked 11mo ago
Q. What is a single-line diagram?
Ans. 

A single line diagram is a simplified diagram that shows the electrical connections and components of a power system using single lines.

  • It is a simplified representation of a power system, showing the main components and their interconnections using single lines.

  • It is used by electrical engineers to understand and analyze the power system without getting into the details of each individual component.

  • It typically i...

An Electrical Engineer was asked 11mo ago
Q. What is a VCB?
Ans. 

VCB stands for Vacuum Circuit Breaker, a type of circuit breaker that uses vacuum as the arc quenching medium.

  • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium

  • It is used to interrupt fault currents in electrical systems

  • VCBs are commonly used in medium voltage applications

  • They are more reliable and require less maintenance compared to other types of circuit breakers

An Electrical Engineer was asked 11mo ago
Q. What is the difference between HT and LT lines?
Ans. 

HT lines are high tension lines used for transmitting electricity over long distances at high voltages, while LT lines are low tension lines used for distributing electricity at lower voltages in local areas.

  • HT lines carry electricity at high voltages for long distance transmission.

  • LT lines distribute electricity at lower voltages in local areas.

  • HT lines are typically used for transmission towers, while LT lines a...

An Electrical Engineer was asked 11mo ago
Q. What equipment is required in HT and LT lines?
Ans. 

Equipment required in HT and LT lines include transformers, circuit breakers, insulators, conductors, and lightning arresters.

  • Transformers are used to step up or step down voltage levels in HT and LT lines.

  • Circuit breakers are essential for protecting the lines from overloads and short circuits.

  • Insulators are used to support and separate conductors to prevent electrical leakage.

  • Conductors are used to carry the ele...

Are these interview questions helpful?
An Electrical Engineer was asked 11mo ago
Q. What is the process of feeder charging and handover?
Ans. 

Feeder charging and handing over involves the process of transferring electrical power from one source to another.

  • Ensure proper safety measures are in place before starting the process

  • Check the voltage and current ratings of the feeder to ensure compatibility with the receiving end

  • Disconnect the feeder from the power source and connect it to the receiving end

  • Verify the successful transfer of power and ensure prope...

An Electrical Engineer was asked 11mo ago
Q. What types of equipment are required for working on LT and HT lines?
Ans. 

Various types of equipment are required in LT and HT line work, including transformers, circuit breakers, insulators, conductors, and protective devices.

  • Transformers

  • Circuit breakers

  • Insulators

  • Conductors

  • Protective devices

An Electrical Engineer was asked 11mo ago
Q. What is the current capacity of LT AB cables?
Ans. 

LT AB Cable's current capacity depends on factors like conductor size, insulation material, ambient temperature, etc.

  • Current capacity of LT AB Cable is determined by factors like conductor size, insulation material, ambient temperature, installation method, etc.

  • The current capacity can be calculated using standard formulas and tables provided by manufacturers or industry standards.

  • For example, a 25mm² LT AB Cable ...

REC Power Development and Consultancy Electrical Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Work process, Work planing etc.

Round 2 - Assignment 

Full Power Sub-Station work, Feeder Segregation, Feeder Bifurcation, LT AB Cable Replacement, Recunductring of old HT 11kv lines under Revamped distribution scheme.

Round 3 - Technical 

(20 Questions)

  • Q1. HT/LT Line diffrence ?
  • Ans. 

    HT lines are high tension lines used for transmitting electricity over long distances at high voltages, while LT lines are low tension lines used for distributing electricity at lower voltages in local areas.

    • HT lines carry electricity at high voltages for long distance transmission.

    • LT lines distribute electricity at lower voltages in local areas.

    • HT lines are typically used for transmission towers, while LT lines are us...

  • Answered by AI
  • Q2. What equipment required in HT and LT Lines ?
  • Ans. 

    Equipment required in HT and LT lines include transformers, circuit breakers, insulators, conductors, and lightning arresters.

    • Transformers are used to step up or step down voltage levels in HT and LT lines.

    • Circuit breakers are essential for protecting the lines from overloads and short circuits.

    • Insulators are used to support and separate conductors to prevent electrical leakage.

    • Conductors are used to carry the electric...

  • Answered by AI
  • Q3. Types of GI Top Channels, Cross angles, Types of DTR, Ratting of DTR, Current capacity of DTR's ?
  • Ans. 

    Types of GI top channels, cross angles, types of DTR, rating of DTR, current capacity of DTRs.

    • Types of GI top channels include GI plain channels and GI perforated channels.

    • Cross angles are used to provide additional support and stability to structures.

    • Types of DTR (Distribution Transformer Rectifier) include single-phase and three-phase.

    • Rating of DTR is typically in kVA (kilo Volt-Ampere) and can range from 25 kVA to 2...

  • Answered by AI
  • Q4. DTR Structure materials ?
  • Q5. Required Earthing in DTR Structures ?
  • Ans. 

    Earthing in DTR structures is essential for safety and proper functioning of the equipment.

    • Earthing helps in dissipating fault currents safely to the ground.

    • It provides protection against electric shocks and equipment damage.

    • Proper earthing reduces the risk of fire hazards.

    • Earthing should be done using copper rods or strips buried in the ground.

    • Regular maintenance and testing of earthing systems is necessary.

  • Answered by AI
  • Q6. What is the use of Earthing road, use process of Earthing road in HT Lines ?
  • Ans. 

    Earthing road is used in HT lines to provide a path for fault current to flow safely into the ground, preventing damage to equipment and ensuring safety.

    • Earthing road is a conductive strip or wire buried in the ground near HT lines.

    • It provides a low resistance path for fault current to flow into the ground, preventing damage to equipment and ensuring safety.

    • Proper installation of earthing road involves burying the cond...

  • Answered by AI
  • Q7. What is the VCB ?
  • Ans. 

    VCB stands for Vacuum Circuit Breaker, a type of circuit breaker that uses vacuum as the arc quenching medium.

    • VCB is a type of circuit breaker that uses vacuum as the arc quenching medium

    • It is used to interrupt fault currents in electrical systems

    • VCBs are commonly used in medium voltage applications

    • They are more reliable and require less maintenance compared to other types of circuit breakers

  • Answered by AI
  • Q8. What is the incommer machine ?
  • Ans. 

    The incommer machine is a device used to control the incoming power supply to a system or equipment.

    • An incommer machine is typically used in electrical distribution systems to manage the flow of electricity.

    • It can be a switchgear device that allows for the connection or disconnection of power sources.

    • Incommer machines are essential for ensuring the safety and efficiency of electrical systems.

    • Examples include circuit br...

  • Answered by AI
  • Q9. LT AB Cable's current capacity ?
  • Ans. 

    LT AB Cable's current capacity depends on factors like conductor size, insulation material, ambient temperature, etc.

    • Current capacity of LT AB Cable is determined by factors like conductor size, insulation material, ambient temperature, installation method, etc.

    • The current capacity can be calculated using standard formulas and tables provided by manufacturers or industry standards.

    • For example, a 25mm² LT AB Cable may h...

  • Answered by AI
  • Q10. What is magger, use of Magger machine ?
  • Ans. 

    A magger is a device used to measure the insulation resistance of electrical equipment or cables.

    • Magger machine is also known as insulation tester.

    • It is used to check the insulation resistance of electrical systems to ensure safety and prevent electrical failures.

    • The machine applies a high voltage to the equipment and measures the resistance to current flow, indicating the condition of the insulation.

    • Regular testing wi...

  • Answered by AI
  • Q11. What is the process of material Inspection of electrical projects.
  • Ans. 

    Material inspection of electrical projects involves checking the quality and specifications of materials used in the project.

    • Verify that materials meet project specifications and standards

    • Inspect materials for damage or defects

    • Check for proper labeling and documentation

    • Ensure materials are stored and handled correctly

    • Perform tests or measurements on materials as needed

    • Examples: checking the gauge and insulation of elec...

  • Answered by AI
  • Q12. What is the BOQ ?
  • Ans. 

    BOQ stands for Bill of Quantities, a document used in construction projects to list the materials, parts, and labor needed for a project.

    • BOQ is a detailed list of items, with quantities and prices, required for a construction project.

    • It helps in estimating the total cost of the project and serves as a basis for tendering and budgeting.

    • BOQ is typically prepared by quantity surveyors or estimators based on the project dr...

  • Answered by AI
  • Q13. What is the Handing over taking over certificate ?
  • Ans. 

    Handing over taking over certificate is a document used in engineering projects to officially transfer responsibility from one party to another.

    • It is a formal document that signifies the transfer of responsibility from one party to another in engineering projects.

    • It includes details such as the scope of work, completion status, quality standards, and any outstanding issues.

    • The certificate is signed by both parties to a...

  • Answered by AI
  • Q14. What is the Single line diagram ?
  • Ans. 

    A single line diagram is a simplified diagram that shows the electrical connections and components of a power system using single lines.

    • It is a simplified representation of a power system, showing the main components and their interconnections using single lines.

    • It is used by electrical engineers to understand and analyze the power system without getting into the details of each individual component.

    • It typically includ...

  • Answered by AI
  • Q15. What is the Pole schedule ?
  • Ans. 

    A pole schedule is a document that lists the locations and details of all poles used in an electrical distribution system.

    • It includes information such as pole number, location, height, material, and any attachments or equipment mounted on the pole.

    • Pole schedules are important for maintenance, repair, and expansion of the electrical distribution system.

    • Example: Pole 1 located at Main Street, 30 feet tall wooden pole wit...

  • Answered by AI
  • Q16. What is the process of Feeder bifurcation ?
  • Ans. 

    Feeder bifurcation is the process of dividing a main electrical feeder into multiple branches to distribute power to different areas.

    • Feeder bifurcation involves splitting a main feeder into smaller branches to supply power to different sections of a building or facility.

    • This process helps in balancing the load and preventing overloading of the main feeder.

    • Feeder bifurcation can be done using distribution panels, circui...

  • Answered by AI
  • Q17. What is the process of Feeder charging and handing over ?
  • Ans. 

    Feeder charging and handing over involves the process of transferring electrical power from one source to another.

    • Ensure proper safety measures are in place before starting the process

    • Check the voltage and current ratings of the feeder to ensure compatibility with the receiving end

    • Disconnect the feeder from the power source and connect it to the receiving end

    • Verify the successful transfer of power and ensure proper fun...

  • Answered by AI
  • Q18. What is the process of Railway crossings ?
  • Ans. 

    Railway crossings are intersections where roads and railway tracks meet, requiring vehicles to stop when trains are passing.

    • Railway crossings are equipped with warning signs, lights, and barriers to alert drivers of approaching trains.

    • Drivers must stop behind the barriers when they are down and wait for the train to pass before proceeding.

    • Some railway crossings also have bells or horns to further warn drivers of an app...

  • Answered by AI
  • Q19. How many type equipment required in LT and HT line work ?
  • Ans. 

    Various types of equipment are required in LT and HT line work, including transformers, circuit breakers, insulators, conductors, and protective devices.

    • Transformers

    • Circuit breakers

    • Insulators

    • Conductors

    • Protective devices

  • Answered by AI
  • Q20. Step down and step up transformers work.
  • Ans. 

    Step down transformers decrease voltage while step up transformers increase voltage.

    • Step down transformers have more turns in the primary coil than the secondary coil.

    • Step up transformers have more turns in the secondary coil than the primary coil.

    • Step down transformers are used to reduce voltage for household appliances.

    • Step up transformers are used in power transmission to increase voltage for long distance transmiss...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard gain best groud required actual experiance which is too necessary on electrical field.

Top trending discussions

View All
Interview Tips & Stories
1w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about REC Power Development and Consultancy?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed in Nov 2018. There were 6 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Any requirement for electrical engineer....
  • Q2. I am motivate doing like this job
  • Q3. I want a good job

Interview Preparation Tips

Interview preparation tips for other job seekers - When did call u sir for me interview....

Electrical Engineer Interview Questions Asked at Other Companies

Q1. What is the difference between Switchgear and Circuit Breakers?
Q2. What is ATS, transformer maintenance procedure, protection of tra ... read more
asked in Tata Steel
Q3. What are composite error and ratio error in a current transformer ... read more
Q4. 1. Power factor of transformer 2. types of DC machine 3. Working ... read more
Q5. How many types of transformers are there based on voltage transfe ... read more

Electrical Engineer Interview Questions & Answers

TCS user image Ganesh Chandurkar

posted on 24 Oct 2017

Interview Questionnaire 

1 Question

  • Q1. About Transformer

Interview Preparation Tips

Round: Test
Duration: 10 hours 5 minutes
Total Questions: 10

Interview Questionnaire 

5 Questions

  • Q1. What is your strength programming language?
  • Ans. 

    My strength programming language is C++. I have extensive experience in developing software and solving complex problems using C++.

    • Proficient in object-oriented programming with C++

    • Strong knowledge of data structures and algorithms

    • Experience in developing efficient and scalable code

    • Familiarity with C++ libraries and frameworks

    • Ability to debug and optimize code for performance

    • Experience in multi-threading and parallel p...

  • Answered by AI
  • Q2. Differences between C and Java?
  • Ans. 

    C is a low-level programming language while Java is a high-level object-oriented language.

    • C is a procedural language while Java is an object-oriented language.

    • C has manual memory management while Java has automatic garbage collection.

    • C is platform-dependent while Java is platform-independent.

    • C supports pointers while Java does not.

    • C is typically used for system-level programming while Java is used for application devel...

  • Answered by AI
  • Q3. What is data structure?
  • Ans. 

    Data structure is a way of organizing and storing data in a computer so that it can be accessed and manipulated efficiently.

    • Data structures define the way data is organized and stored in memory.

    • They provide efficient algorithms for accessing, inserting, and deleting data.

    • Examples of data structures include arrays, linked lists, stacks, queues, trees, and graphs.

  • Answered by AI
  • Q4. Where do u see yourself after 5 years?
  • Ans. 

    In 5 years, I see myself as a senior electrical engineer leading a team on innovative projects and contributing to the growth of the company.

    • Leading a team on innovative projects

    • Contributing to the growth of the company

    • Possibly pursuing further education or certifications

    • Mentoring junior engineers

    • Attending industry conferences and staying updated on latest technologies

  • Answered by AI
  • Q5. If you got selected in CAT examination, what would u prefer job or further studies?
  • Ans. 

    I would prefer a job to gain practical experience and apply my knowledge in a real-world setting.

    • Prefer job for practical experience

    • Apply knowledge in real-world setting

    • Gain industry exposure

    • Financial independence

    • Opportunity for career growth

  • Answered by AI

Interview Preparation Tips

Round: Test
Experience: On that day huge strength of students was attended, including our university. The criteria are 60% in 10th,12th, and current degree without standing arrears. However I qualified for this round. It was simple.
Tips: 1. Command over the vocabulary.
2. Reading of newspaper and novels regularly.

Duration: 1 hour
Total Questions: 50

Round: Group Discussion
Experience: There were 7 groups which consisted 10 members each. Each person had given the time seperately to talk about the topic and later HR was asking a general question.
Tips: 1. Fluency should be good.
2. Clarity in voice.
3. Knowledge about the topic
Duration: 11 hours 20 minutes

Round: Technical + HR Interview
Experience: There was panel of 4 people who were asking questions. They went through all my resume and asked the questions.
Tips: 1.Confidence
2. Knowledge about languages
3. Proper resume
3. Inflencial technical skills


College Name: Ajay Kumar Garg Engineering College, Ghaziabad

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Coming to AEM,Interviewer has covered all the topics.

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls don't join in TechMahindra.Especially for AEM Folks.Because there are no projects at all.They force you to learn and work in other domain.Then your AEM knowledge will vanish.Worst Company.

I applied via Campus Placement and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About the basics of c, c++ and java, also asked to explain the project that I developed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be bold and transparent. Explain your reasons and issues if any they are under standable.

Interview Questionnaire 

3 Questions

  • Q1. About skilla
  • Q2. Project
  • Q3. Roles in
Are these interview questions helpful?

Interview Questionnaire 

1 Question

  • Q1. What are your career aspirations?

Interview Questionnaire 

3 Questions

  • Q1. I am interested in your company so please me join the you company
  • Q2. Kya me apki team ka member ban sakta hun
  • Q3. Yea

I applied via Naukri.com and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is AD dns dhcp?
  • Ans. 

    AD DNS DHCP are Microsoft technologies used for network management and authentication.

    • Active Directory (AD) is a directory service used for authentication and authorization of users and computers in a network.

    • Domain Name System (DNS) is used for name resolution of network resources.

    • Dynamic Host Configuration Protocol (DHCP) is used for automatic IP address assignment to network devices.

    • AD, DNS, and DHCP are often used ...

  • Answered by AI
  • Q2. What is IaaS SaaS PaaS?
  • Ans. 

    IaaS, SaaS, and PaaS are cloud computing models that provide different levels of infrastructure, software, and platform services.

    • IaaS (Infrastructure as a Service) provides virtualized computing resources over the internet, such as servers, storage, and networking.

    • SaaS (Software as a Service) delivers software applications over the internet, eliminating the need for local installation and maintenance.

    • PaaS (Platform as ...

  • Answered by AI
Round 3 - Aptitude Test 

General questions for 1 hors online exams

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident in your role and select which role you want to work

Skills evaluated in this interview

REC Power Development and Consultancy Interview FAQs

How many rounds are there in REC Power Development and Consultancy Electrical Engineer interview?
REC Power Development and Consultancy interview process usually has 3 rounds. The most common rounds in the REC Power Development and Consultancy interview process are Aptitude Test, Assignment and Technical.
What are the top questions asked in REC Power Development and Consultancy Electrical Engineer interview?

Some of the top questions asked at the REC Power Development and Consultancy Electrical Engineer interview -

  1. What is the use of Earthing road, use process of Earthing road in HT Line...read more
  2. What is the process of Feeder charging and handing ove...read more
  3. how many type equipment required in LT and HT line wor...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

REC Power Development and Consultancy Electrical Engineer Salary
based on 5 salaries
₹3.6 L/yr - ₹3.9 L/yr
18% less than the average Electrical Engineer Salary in India
View more details

REC Power Development and Consultancy Electrical Engineer Reviews and Ratings

based on 2 reviews

4.0/5

Rating in categories

3.2

Skill development

4.2

Work-life balance

3.2

Salary

4.0

Job security

4.0

Company culture

3.2

Promotions

4.0

Work satisfaction

Explore 2 Reviews and Ratings
Project Engineer
115 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Assistant Project Engineer
65 salaries
unlock blur

₹2.4 L/yr - ₹4.5 L/yr

Senior Project Engineer
29 salaries
unlock blur

₹3.8 L/yr - ₹6.4 L/yr

Executive Engineer
10 salaries
unlock blur

₹13.3 L/yr - ₹16.7 L/yr

Assistant Executive Engineer
9 salaries
unlock blur

₹7.4 L/yr - ₹7.6 L/yr

Explore more salaries
Compare REC Power Development and Consultancy with

TCS

3.6
Compare

Accenture

3.8
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
write
Share an Interview