i
RDC Concrete (India)
Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
Core as well as basics
Where a person could learn more being at home or away from home
I applied via Walk-in and was interviewed in Dec 2022. There were 5 interview rounds.
Total of 25 questions and duration of 30 minutes will be given to us. Topics are verbal, decision makings questions, quant , surface area and Volume.
People are who cleared first round will be called for second round GD and here they will give 10 minutes time for each team. each team consist of 10 to 14 people. topics could be general or situational in the field.
Top trending discussions
I applied via Campus Placement and was interviewed in Nov 2023. There were 4 interview rounds.
General aptitude test which is elimination round
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are commonly used in power distribution systems to step up or step down voltage levels.
They consist of two or more coils of wire, known as windings, that are wound around a core made of magnetic material.
The primary winding is connected to the input voltage source, while the...
I applied via Campus Placement and was interviewed before Feb 2022. There were 4 interview rounds.
Logical, Mathematics and Technical
Abstract Topic- General Discussion
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Test based on basic Mining knowledge
I was interviewed in Jul 2020.
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Technical Officer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Incharge
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Technical Officer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
Plant Manager
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
29
salaries
| ₹0 L/yr - ₹0 L/yr |
UltraTech Cement
ACC
Ambuja Cements
JK Cement