I appeared for an interview in Jul 2022.
60 percent core and 40 percent aptitude
Tests done on a transformer include insulation resistance test, turns ratio test, winding resistance test, and load test.
Insulation resistance test checks the insulation resistance between windings and between windings and ground.
Turns ratio test measures the ratio of the number of turns in the primary winding to the number of turns in the secondary winding.
Winding resistance test measures the resistance of each windin...
CT and PT are used in electrical systems for measurement and protection purposes.
CT (Current Transformer) is used to measure high currents and step them down to a manageable level for measurement and protection devices.
PT (Potential Transformer) is used to measure high voltages and step them down to a safe level for measurement and protection devices.
CTs and PTs provide isolation and safety by separating the high volta...
The generation voltage in India varies depending on the location and power plant.
The voltage ranges from 110V to 440V depending on the location.
The power plants generate electricity at different voltages.
The national grid operates at a voltage of 400kV and 765kV.
India has a mix of AC and DC power transmission systems.
High voltage is used for transmission to reduce power loss and increase efficiency.
High voltage reduces the current required for a given amount of power, which reduces power loss due to resistance in the transmission lines.
Lower current also means smaller conductors can be used, reducing material and installation costs.
High voltage transmission is more efficient over long distances, reducing the need for additional pow...
Renewable energy power plants are generally cheaper to install than traditional fossil fuel power plants.
Renewable energy power plants such as solar, wind, and hydroelectric are cheaper to install than traditional fossil fuel power plants.
The cost of installation for renewable energy power plants has decreased significantly in recent years due to advancements in technology and increased demand.
Fossil fuel power plants ...
OC test is done on LV side to avoid high voltage on secondary side. SC test is done on HV side to avoid high current on primary side.
LV side has lower voltage rating, hence safer for OC test
HV side has higher current rating, hence suitable for SC test
OC test checks insulation resistance and winding resistance
SC test checks impedance and voltage regulation
Example: A 100 MVA transformer with 220 kV HV and 33 kV LV rating
Top trending discussions
posted on 24 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
posted on 23 Sep 2022
I applied via Walk-in
posted on 23 Apr 2023
I applied via Campus Placement and was interviewed in Oct 2022. There were 4 interview rounds.
Aptitude test question
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.
posted on 9 Apr 2025
I appeared for an interview before Apr 2024, where I was asked the following questions.
posted on 29 May 2024
I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.
Maths,intelligence, Engineering knowledge
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
88
salaries
| ₹4.6 L/yr - ₹11 L/yr |
Engineer
79
salaries
| ₹3.3 L/yr - ₹8.3 L/yr |
Assistant Manager
53
salaries
| ₹8 L/yr - ₹14 L/yr |
Production Engineer
38
salaries
| ₹3.2 L/yr - ₹8.2 L/yr |
Design Engineer
37
salaries
| ₹3.2 L/yr - ₹7.9 L/yr |
Polycab Wires
CG Power and Industrial Solutions
KEI Industries
Medha Servo Drives