Critical path is the longest sequence of activities in a project plan that must be completed on time to ensure project completion within the deadline.
It determines the shortest possible duration of a project.
It identifies the activities that cannot be delayed without delaying the entire project.
It helps in prioritizing tasks and allocating resources.
It is represented by a network diagram and a Gantt chart.
Examples incl...
The procedure to start a project involves several steps.
Define project scope and objectives
Identify project stakeholders
Develop project plan and schedule
Allocate resources and budget
Establish project team and roles
Obtain necessary approvals and authorizations
Initiate project execution
A milestone is a significant event or achievement in a project that marks progress towards completion.
Milestones are used to track progress and ensure that a project is on schedule.
They are often associated with specific dates or deadlines.
Examples of milestones include completing a major deliverable, reaching a certain stage of development, or obtaining funding.
Milestones can also be used to communicate progress to st
Top trending discussions
posted on 14 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
I appeared for an interview before Sep 2020.
Round duration - 140 minutes
Round difficulty - Medium
Test timing was at 2:00 pm , it was conducted in a college and the environment was good for the test. Camera was a primary part of test, so no suspicious activity.
Given two numbers in the form of two arrays where each element of the array represents a digit, calculate the sum of these two numbers and return this sum as an ar...
Given two numbers represented as arrays, calculate their sum and return the result as an array.
Iterate through the arrays from right to left, adding digits and carrying over if necessary
Handle cases where one array is longer than the other by considering the remaining digits
Ensure the final sum array does not have any leading zeros
Round duration - 20 minutes
Round difficulty - Easy
The round was conducted at around 12 p.m. I was called at the college location and then it was conducted. The interviewer was quite polite and frank.
Round duration - 8 minutes
Round difficulty - Easy
This round was conducted right after finishing and clearing the technical round at the same place and on the same day.
Tip 1 : Practice atleast 2-3 Coding problems daily so your logic building becomes stronger.
Tip 2 : Exercise problems based on OOPS concepts and others too.
Tip 3 : If you can have your own project built, then it's the major point and will act as a plus point.
Tip 1 : Your resume should be in standard form, short and simple will be more effective.
Tip 2 : Whatever you have learned, you need to mention it in your resume as that will be your primary source of selection and having project on your resume is important.
I applied via Naukri.com and was interviewed in Jul 2020. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before May 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
based on 2 interviews
Interview experience
based on 70 reviews
Rating in categories
Project Engineer
8
salaries
| ₹10.1 L/yr - ₹18 L/yr |
Electrical Technician
7
salaries
| ₹3 L/yr - ₹9 L/yr |
Protection Engineer
7
salaries
| ₹16.7 L/yr - ₹20 L/yr |
Electrical Engineer
6
salaries
| ₹8.5 L/yr - ₹17.2 L/yr |
Condition Monitoring Engineer
5
salaries
| ₹10 L/yr - ₹10 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
Reliance Industries