Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed in Jan 2021. There were 3 interview rounds.
Unit operation and unit process are two terms used in chemical engineering to describe different stages of a chemical process.
Unit operation refers to a single step in a process, such as distillation or filtration.
Unit process refers to a series of unit operations that are combined to achieve a specific chemical transformation.
Unit operations are often used in the production of chemicals, while unit processes are used ...
The role of a chemical engineer in a plant is to design, operate and optimize chemical processes to ensure efficient production.
Designing and implementing chemical processes
Ensuring safety and environmental regulations are met
Optimizing production processes to increase efficiency and reduce costs
Troubleshooting and problem-solving
Collaborating with other engineers and plant personnel
Continuous improvement of processes
E...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
CFMEA stands for Control Failure Mode and Effects Analysis.
CFMEA is a systematic approach used to identify and mitigate potential failures in a process or system.
It involves analyzing failure modes, their causes, and the potential effects on the process or system.
CFMEA helps in prioritizing and implementing control measures to prevent or minimize failures.
It is commonly used in industries such as manufacturing, automot...
System level DFMEA is given main preference.
System level DFMEA considers the entire system and its interactions.
Component level DFMEA focuses on individual components.
System level DFMEA is more comprehensive and effective in identifying potential failures.
Example: In automotive industry, system level DFMEA would consider the entire vehicle and its subsystems.
Example: In medical devices, system level DFMEA would conside...
I applied via Company Website and was interviewed in Mar 2022. There were 3 interview rounds.
One example of learning from failure is failing to meet a project deadline and using that experience to better estimate future timelines.
Reflect on what went wrong and why
Identify areas for improvement
Develop a plan to address those areas
Apply the lessons learned to future projects
Communicate the lessons learned to team members
Example: Failing to deliver a project on time due to poor communication with stakeholders. Th...
I will prioritize tasks, delegate when necessary, and communicate with my team to ensure efficient workload management.
Create a to-do list and prioritize tasks based on urgency and importance
Delegate tasks to team members based on their strengths and workload
Communicate with team members to ensure everyone is on the same page and workload is evenly distributed
Take breaks and practice self-care to avoid burnout
posted on 18 May 2020
I applied via Naukri.com and was interviewed in Nov 2019. There were 3 interview rounds.
Control valve calibration involves adjusting the valve to ensure it operates within specified parameters.
Determine the valve's operating range and desired set points
Use a calibration bench or in-line calibration equipment to adjust the valve's position and response time
Verify the valve's performance using a flow meter or pressure gauge
Document the calibration process and results for future reference
The door of a cokr oven is typically made from heat-resistant materials such as refractory bricks or ceramic fiber.
Refractory bricks
Ceramic fiber
The mechanism for quenching car cage tilting is typically achieved through the use of hydraulic systems.
Hydraulic systems are commonly used in industrial applications to control the movement of heavy machinery.
The hydraulic system applies pressure to a piston, which in turn controls the tilting of the car cage.
The quenching process involves rapidly cooling a material to achieve specific properties, often used in heat t...
I was interviewed before Oct 2023.
Designed and implemented a new cloud-based data storage system for a large e-commerce company.
Led a team of engineers to analyze requirements and design the system architecture
Utilized AWS services such as S3 and RDS for scalable and reliable storage
Implemented data encryption and access control measures to ensure data security
I applied via Walk-in and was interviewed in Jun 2021. There was 1 interview round.
QA QC Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Store Executive
4
salaries
| ₹0 L/yr - ₹0 L/yr |
QA Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
QC Inspector
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Quality Assurance
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Steel Authority Of India
ArcelorMittal Nippon Steel