Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
GD Topic is Simple and Analysis skills also nice
posted on 12 Nov 2024
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Referral and was interviewed in Mar 2023. There was 1 interview round.
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
Slab shuttering is checked by ensuring proper alignment, levelness, and stability of formwork before concrete pouring.
Check alignment of formwork with respect to the structural drawings
Ensure formwork is level using a spirit level
Inspect the stability of formwork to prevent any collapse during concrete pouring
Check for any gaps or misalignments in the formwork that may affect the quality of the slab
Verify that all nece...
Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.
Calculate the volume of the area to be filled (length x width x height)
Determine the density of the concrete (usually around 2400 kg/m^3)
Multiply the volume by the density to get the total concrete quantity needed
Consider adding a percentage for wastage or spillage
Lapping is provided in columns to ensure proper bonding between the column reinforcement and the beam reinforcement.
Lapping is typically provided at the junction of vertical and horizontal reinforcement bars in columns.
It helps in transferring the load from the column to the beam effectively.
The length of lapping required is specified in the structural drawings or as per design requirements.
Proper lapping ensures struc...
based on 1 interview
Interview experience
Assistant Manager
16
salaries
| ₹4 L/yr - ₹6.6 L/yr |
Manager
14
salaries
| ₹6.6 L/yr - ₹12 L/yr |
Project Architect
10
salaries
| ₹6.6 L/yr - ₹14 L/yr |
Sales Manager
9
salaries
| ₹4.8 L/yr - ₹10.8 L/yr |
Senior Executive
9
salaries
| ₹3.2 L/yr - ₹4.8 L/yr |
Omaxe
Emaar India Limited
Brigade Group
Puravankara